一次,他在核实数据时,认为部分数据需要重新测量,但项目部的车都被派出去了。belimitedtonomorethan2daysofwork,materialdepositedinspecialinsulatedcontainers,materialhandlingtogentlyandmakeuseofthermalinsulationmaterialinwindproof,waterproof,moisture-proofmeasure.6.2thermaldesignoptimizationforhigh-temperaturespecialthermalinsulationforpipingsupportandhangerdesign,reducedheatdissipationofthehangers,ensurethatthewalldoesnotoverheat.Small-diameterpiping,thermalinstrumentlayoutandpositioningofsupportandhangerdesigntakefullyintoaccounttheexpansionspaceandinsulationthickness.Large-diameterpipesafterheatpreservationplasteringconstructionofvalves,turbine,checkingsmoothsurface,hightemperaturepowderpaintfullydryafter.Protectivecoveringsforelectricequipmentinsulationboardsdesignedwithpressureplate,whenorderingaccordingtotheinstallationdiagram,modelspecificationspublishingorder,ensurewheninstallingcornersneat,uniformappearance,reducetheamountofon-sitemachining.Beforevalves,flangeinsulationshellconstruction,besuretomakeaunifiedmodel,allvalves,flanges,insulationcoverunified,tidyandbeautiful.Whenfourpartssuchaspipes,boilerinsulation,mustdofirstarticleinspection,proofofdesignandconstructionmethods,technologycanmeetthetechnologicalrequirements,beforeextensiveconstruction.Boilersteelbeams,dooropeningboxesdesignedwithinsulationgaskets,flangecannotbeoblique,evenfastened.Backintotheslopeofthetubingduringinstallationpayattentiontothepiping,oilstationisalowpoint.Refuelingmustbecontrolledwhencastingmaterialparts,selectlowthermalconductivitymaterialsasfaraspossible,ensurethatthesepartsdonotoverheat.6.3qualitydefectsofinsulationtechnologymanagementoptimizationofconstructionprocessanddevelopareasonableduration,regionaltransferofstrictly目录一、概况···············································2二、编制依据···········································3三、净化空调系统施工工艺及主要技术措施·················33.1净化系统风管制作施工工艺·······················33.2、净化空调系统安装·····························9四、施工质量保证措施··································154.1施工质量目标分解·······························154.2施工质量保证通用措施···························15五、安全、文明施工保证措施·····························165.1安全施工保证措施·······························165.2文明施工保证措施·······························17六、施工进度计划······································18七、施工机具计划······································18八、施工劳动力计划····································19一次,他在核实数据时,认为部分数据需要重新测量,但项目部的车都被派出去了。belimitedtonomorethan2daysofwork,materialdepositedinspecialinsulatedcontainers,materialhandlingtogentlyandmakeuseofthermalinsulationmaterialinwindproof,waterproof,moisture-proofmeasure.6.2thermaldesignoptimizationforhigh-temperaturespecialthermalinsulationforpipingsupportandhangerdesign,reducedheatdissipationofthehangers,ensurethatthewalldoesnotoverheat.Small-diameterpiping,thermalinstrumentlayoutandpositioningofsupportandhangerdesigntakefullyintoaccounttheexpansionspaceandinsulationthickness.Large-diameterpipesafterheatpreservationplasteringconstructionofvalves,turbine,checkingsmoothsurface,hightemperaturepowderpaintfullydryafter.Protectivecoveringsforelectricequipmentinsulationboardsdesignedwithpressureplate,whenorderingaccordingtotheinstallationdiagram,modelspecificationspublishingorder,ensurewheninstallingcornersneat,uniformappearance,reducetheamountofon-sitemachining.Beforevalves,flangeinsulationshellconstruction,besuretomakeaunifiedmodel,allvalves,flanges,insulationcoverunified,tidyandbeautiful.Whenfourpartssuchaspipes,boilerinsulation,mustdofirstarticleinspection,proofofdesignandconstructionmethods,technologycanmeetthetechnologicalrequirements,beforeextensiveconstruction.Boilersteelbeams,dooropeningboxesdesignedwithinsulationgaskets,flangecannotbeoblique,evenfastened.Backintotheslopeofthetubingduringinstallationpayattentiontothepiping,oilstationisalowpoint.Refuelingmustbecontrolledwhencastingmaterialparts,selectlowthermalconductivitymaterialsasfaraspossible,ensurethatthesepartsdonotoverheat.6.3qualitydefectsofinsulationtechnologymanagementoptimizationofconstructionprocessanddevelopareasonableduration,regionaltransferofstrictly2一、概况1.本车间为生产工艺性车间,其中生产车间建筑面积约为5400平方米,共一层。生产车间内有2条生产线(正负极涂布机各2台)。功能划分为:原料库、普通通道、货淋室、洁净通道、正负极合浆、清洗、正负极搅拌、正负极涂布机头(上料)、涂布机烘箱、正负极涂布机尾(收卷)、正负极辊压、模切间、叠片装配间、塑壳烘烤间、电芯烘烤间、注液间、静置间、化成间、分容间、测试间、成品库。2.车间净化除湿空调设计有:正极搅拌、涂布机头、尾。负极搅拌、涂布机头、清洗。正极辊压、模切、修片。负极辊压、模切、修片、机尾。叠片、装配、塑壳烘烤间。注液、静置间、电芯烘烤间。洁净通道。工艺管路包括:正极涂布机NMP溶剂回收系统。负极涂布机排风系统。工艺冷冻水系统,空调加热系统等。室内参数如下表3.本车间空调夏季空调设计冷负荷998kw,冬季空调设计热负荷469kw。雅安鼎恒新能源锂电池制造厂净化空调施工方案一次,他在核实数据时,认为部分数据需要重新测量,但项目部的车都被派出去了。belimitedtonomorethan2daysofwork,materialdepositedinspecialinsulatedcontainers,materialhandlingtogentlyandmakeuseofthermalinsulationmaterialinwindproof,waterproof,moisture-proofmeasure.6.2thermaldesignoptimizationforhigh-temperaturespecialthermalinsulationforpipingsupportandhangerdesign,reducedheatdissipationofthehangers,ensurethatthewalldoesnotoverheat.Small-diameterpiping,thermalinstrumentlayoutandpositioningofsupportandhangerdesigntakefullyintoaccounttheexpansionspaceandinsulationthickness.Large-diameterpipesafterheatpreservationplaste