qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould关键部位或特殊要求的施工工艺方案/措施一、钻孔灌注桩基础:施工时拟采用反循环钻机成孔,汽车吊吊沉钢筋笼,混凝土采用商品混凝土,混凝土输送车运输。1、场地准备:施工前先进行场地平整,清除杂物,钻机位置处平整夯实,同时对施工用水、泥浆池位置、动力供应、砂石料场、钢筋加工场地、施工便道等做统一安装。根据设计图纸对桩位进行精确放样,在桩中心位置钉以木桩,并设护桩,放线后由主管技术人员进行复核,施工中护桩要妥善看管,不得移位和丢失。2、埋设护筒:护筒采用6mm钢板制成,护筒内径比桩径大10-20cm。护筒顶端要高出地面0.3m—0.5m。为避免护筒底部悬空,造成塌孔,漏水、漏浆,护筒底应坐在天然结实的土层上,护筒周围0.5~1.0m范围内挖除,夯填粘土至护筒的0.5以下,护筒埋设应坚实,不漏水,护筒平面位置的偏差不大于5cm,护筒倾斜度的偏差不大于1%。3、钻机定位(1)钻机应稳定的安装在钻孔的一侧,钻机履带不得压在孔口的钢护筒壁上。(2)选择适宜地层的配套钻头和钻孔事故处理配套机具,接通水电供应。(3)调整钻机,调整钻头中心、桩孔中心及护筒中心三者在同一条铅垂线上,稳定好钻机,保持钻机牢固、稳定。4、护壁泥浆:采用膨胀土或粘土造浆方式进行护壁。针对不同地层的地质特性,根据以往施工经验配制调整泥浆,并在施工中定期检查浆液的比重、粘度、静切力、酸碱度、胶体率、失水率等指标。泥浆循环使用,废弃泥浆经沉淀处理后外运,以保护环境。钻孔泥浆由水、粘土(或膨胀土)组成。开工前应准备数量充足和性能合格的粘土或膨胀土,粘土性能应满足规范要求。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould5、钻孔(1)开钻时应先在孔内灌注泥浆。开孔及整个钻进过程中,应始终保持孔内水位高出地下水位(河中水位)1.5~2.0米。并低于护筒顶面0.3米以防溢出。掏渣后应及时补泥浆。(2)保持钻具的稳定性和导向性,避免碰撞护筒。要及时修理锤头,更换新的耐磨牙块。(3)钻进过程中,随时注意孔内水压差,以防止产生流沙。对孔中泥浆随时进行检查,保持各项指标符合要求,不因泥浆过浓影响进度,过稀导致塌孔等。(4)钻进时及时填写钻孔施工记录,交接班时应交待钻进情况及下一班的注意事项。根据钻进程度、快慢情况以及泥浆取样分析判明地层变化。(5)因故停钻时,孔口应护盖,严禁钻头留在孔内,以防埋钻。同时保持孔内有规定的水头和要求的泥浆浓度、粘度,以防坍孔。6、钻孔检查、清孔成孔:(1)钻进达到设计标高时,用测绳进行测量并记录(钻孔施工人员应严格控制孔深,不得用超钻代替钻渣沉淀,更不能少钻),通知项目质检人员检测合格后,再请甲方监理工程师检查、验收。(2)钻孔完成后应用检孔规检测孔径和倾斜度。成孔孔径不得小于设计直径,倾斜度不大于1%,用长度符合规定的检孔规上下两次检查造孔是否合格,合格后方可清孔。(3)根据钻孔灌注桩的孔底沉渣厚度的要求,做好两次清孔,第一次是在终孔后,通过掏渣筒进行清孔;第二次在下好钢筋笼后进行清孔,以控制沉渣厚度标准。每次清孔终了必须测一次沉渣厚度,保证达到设计要求,并将实测数据记录在册。第一次清完孔后,检查孔深、垂直度、孔径和沉淀层厚度等,确认满足设计要求后,进行钢筋笼吊放及导管安装。7、钢筋笼加工吊装及导管安装:钢筋笼加工焊接在钢筋加工场集中加工,汽车运至施工现场后焊接成钢筋笼。钢筋笼骨架采用单面焊接。吊放钢筋笼采用吊车进行,钢筋骨架及时准确的吊装就位后,应牢固定位。钢筋笼周边要安放定位筋,确保保护层厚度。吊放时不qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downthework