泉州浦西万达广场大商业区二次结构施工方案中国建筑第二工程局有限公司ChinaConstructionEngineeringSecondBureau0目录1、工程概况.....................................................................................................................................12、编制依据.....................................................................................................................................23、质量控制程序.............................................................................................................................23.1、室内粗装修施工工艺流程.....................................................................................................23.2、砌筑工程质量控制程序.........................................................................................................34、砌筑施工.....................................................................................................................................34.1、施工准备.................................................................................................................................34.1.1技术准备................................................................................................................................34.1.2、材料.....................................................................................................................................44.1.3、作业条件.............................................................................................................................64.1.4、主要机具设备.....................................................................................................................64.1.5、进度计划.............................................................................................................................64.1.6、平面布置图.........................................................................................................................64.2、施工工艺.................................................................................................................................64.2.1、工艺流程.............................................................................................................................64.2.2、施工方法.............................................................................................................................74.2.3、墙体构造做法...................................................................................................................124.3、砌块砌筑要求.......................................................................................................................174.4、植筋要求...............................................................................................................................184.5、成品保护...............................................................................................................................184.6、施工注意事项.......................................................................................................................194.7、质量要求...............................................................................................................................194.8、质量通病的分析与控制.......................................................................................................214.9、安全文明施工.......................................................................................................................22泉州浦西万达广场大商业区二次结构施工方案中国建筑第二工程局有限公司ChinaConstructionEngineeringSecondBureau11、工程概况泉州浦西万达广场3号建筑,位于泉州市丰泽区宝洲街与刺桐路交叉路口西侧,江滨路北侧。3号建筑总建筑面积:262905.97m2,其中购物中心建筑面积:114640.15m2,塔楼建筑面积:49955.48m2,设备夹层建筑面积:1253.16m2,地下建筑面积为97057.18m2。建筑占地面积:30359.07m2。建筑层数:地下二层,地上写字楼建筑层数为27层,建筑高度为100m,购物中心裙房层数为6层,建筑高度为32.7m。部分商业裙房层数为3层。结构类型:主体为现浇钢筋混凝土框架-剪力墙结构。抗震设防烈度:7度。防水等级:屋面防水等级为二级,地下室防水等级为一级。砌筑量为44191.4立方米。大商业各区域楼层层高区域楼层层高3#建筑地下二层5.15m地下一层5.75m首层6m2~6层5.17层(转换层)2.19m8~27层(标准层)3.1m大商业砌筑量统计表楼层层高单层砌筑量(m3)地下二层5.15m6760.46地下一层5.75m7703.78首层6m7232.122~3层5.1m6760.464~6层5.1m2268.5087层2.19m63.60648~27层(标准层)3.1m105.248砌筑量汇总44191.3704泉州浦西万达广场大商业区二次结构施工方案中国建筑第二工程局有限公司ChinaConstructionEngineeringSecondBureau22、编制依据1、《建筑施工手册》(第四版)2、《砌体工程施工质量验收规范》GB50203—20023、《砌筑砂浆配合比设计规程》JGJ98-20004、《蒸压加气混凝土建筑应用技术规程》JGJ/T17—20085、建筑安装分项工程施工工艺标准(CSCEC/MS)6、泉州浦西万达广场工程施工图纸7、《混凝土结构施工质量验收规范》GB50204-2002。8、《建筑工程施工质量验收统一标准》GB50300-2001。3、质量控制程序3.1、室内粗装修施工工艺流程样板施工窗、门框安装墙面抹灰卫生间地面找平卫生间防水地面清理地坪施工防水、保护层顶部补砌(包括门洞上口)水电安装(墙面凿剔槽、装管)构造柱施工(模板安装、钢筋绑扎、砼浇筑)定位放线基层清理后置拉结筋立皮数杆浇筑墙底坎砼第一次砌筑安装门窗过梁第二次砌筑阳台地面清理找平泉州浦西万达广场大商业区二次结构施工方案中国建筑第二工程局有限公司ChinaConstructionEngineeringSecondBureau33.2、砌筑工程质量控制程序4、砌筑施工4.1、施工准备4.1.1技术准备1)主体结构已分阶段施工完毕,质量合格并已通过验收。认真熟悉建筑施工图纸,根据设计图纸要求和国家现行规范及工艺规程编制施工方案并向班组进行技术交底,进行样板间的施工。2)每层楼面要弹出轴线、墙身线、构造柱位置线、圈梁位置线、拉结筋位置线、门窗洞口位置线、管道等预留洞位置及标高线,经复核符合设计图纸要求,并办理预检手续。样板间放线后经监理、业主验收,如与结构不符时,可通过监理、业主共同洽商后进行适定位放线卫生间、阳台防潮坎下砼面凿毛、清理完毕砖墙与砼结构交接部位植筋完毕分包队填报《验收申请单》,报项目工程部及项目质检部申请验收填报《验收申请单》,报项目工程部及项目质检部申请验收验收合格项目质检部签发允许浇筑防潮坎砼的《施工许可令》验收合格项目质检部填《验收申请单》和《隐蔽验收记录》等相关资料,报甲方、监理申请验收防潮坎砼达到强度,并按规范养护,项目质检部随机抽查甲方、监理验收合格,向项目质检部签发《回执单》,项目质检部向分包队签发《砖墙施工许可令》砌筑完一面墙或一个区,分包队填《验收申请单》报项目质检部、工程部进行正式验收项目质检部对第一、二次砌筑及顶部补砌等进行实测检查,验收合格后,待砂浆达到设计强度及水电安装完毕,质检部签发下道工序《抹灰工程施工许可令》验收不合格下一道工序项目质检部视问题的轻重处罚各级管理人员