恒大金碧天下四期建设工程混凝土质量缺陷处理方案编制:审核:审批:中铁二局工程有限公司恒大金碧天下四期工程项目经理部2017年6月中铁二局恒大金碧天下四期工程项目经理部混凝土质量缺陷处理方案1目录第一章、编制依据······················································11.1编制依据································································1第二章、砼质量缺陷的分类及分类处理方法·····················12.1第一类砼质量缺陷····················································12.2第二类砼质量缺陷····················································22.3第三类砼质量缺陷····················································32.4其他······································································5第三章、修补使用的材料及机具····································63.1填补用水泥砂浆·······················································63.2修补使用的砼··························································63.3界面处理剂·····························································73.4机具······································································7第四章、缺陷处理流程及要求·······································74.1砼缺陷处理流程·······················································74.2砼缺陷处理要求·······················································7第五章、施工组织······················································8第六章、劳动力组织及工期安排····································96.1劳动力组织·····························································96.2工期安排································································9第七章、安全要求······················································9中铁二局恒大金碧天下四期工程项目经理部混凝土质量缺陷处理方案1第一章、编制依据1.1编制依据(1)、《建筑工程施工质量验收统一标准》GB50300-2013(2)、《建筑施工安全技术统一规范》GB50870-2013(3)、《施工企业安全生产管理规范》GB50656-2011(4)、《混凝土结构工程施工质量验收规范》GB50204-2015(5)、《混凝土结构工程施工规范》GB50666-2011(6)、《建筑工程施工质量验收统一标准》GB50300-2013;(7)、《混凝土结构工程施工质量验收规范》GB50204-2015(8)、《砌体工程施工质量验收规范》GB50203-2011(9)、《屋面工程质量验收规范》GB50207-2012(10)、《建筑地面工程施工质量验收规范》GB50209-2010(11)、《建筑给水排水及采暖工程施工质量验收规范》GB50242-2002(12)、《建筑电气工程施工质量验收规范》GB50203-2011(13)、《实施性施工组织设计》第二章、砼质量缺陷的分类及分类处理方法模板拆除后,发现砼表面局部存在质量缺陷,现将其缺陷分为三类,并根据分类情况进行不同处理:2.1第一类砼质量缺陷①缺陷描述:凡是砼缺陷深度在砼表面以下3cm以内(包括3cm)的缺陷(蜂窝麻面)划分为第一类缺陷,确认必须经过剔凿,并确保已剔凿至密实砼为止(结构重要部位,应继续剔凿至最少6~8cm深,并应保证剔凿至密实砼为止,作为二类缺陷处理)。胀模时拆模后将表面剔除,按第一类缺陷处理。②处理方式:第一步:剔凿:剔凿范围及深度由砼质量缺陷处理小组派专人确认。必须确保剔凿到密实砼,将剔凿部位的钢筋表面附着的砼清理干净,剔凿完成后,由砼中铁二局恒大金碧天下四期工程项目经理部混凝土质量缺陷处理方案2质量缺陷处理小组自检通过后,再报请监理检查。第二步:剔凿面处理:先用钢丝刷将剔凿面刷干净,再用空压机吹剔凿面,最后用压力水冲洗干净,确保无渣滓。第三步:结合层:先用搅拌棍将配置好的界面处理剂(GH-303)搅拌均匀,再用刷子蘸取,均匀的涂刷在混凝土剔凿面上,待初步干燥后可进行下步工序。第四步:用砂浆将剔凿处修补平整:填补前,洒水将结合层充分润湿,填补的砂浆必须保证密实,表面必须平整。砂浆采用1:2水泥砂浆,内掺UEA膨胀剂(水泥用量的12%),第五步:养护:填补完成后,必须采用洒水养护,防止砂浆失水干缩,与原砼面结合处出现裂缝。2.2第二类砼质量缺陷①缺陷描述:单面深度在砼表面以下超过3cm,但并未贯通的缺陷划分为第二类缺陷。确认缺陷必须经过剔凿,并确保已剔凿至密实砼为止。凡是结构重要部位,如暗柱、剪力墙交接部位、边缘约束构件、墙端,对于这些部位的缺陷,应视缺陷情况,最少剔凿至8cm深,再作为二类缺陷处理。②处理方式:第一步:剔凿。剔凿范围及深度由砼质量缺陷小组人员认定,剔凿完成后,由砼质量缺陷小组派专人确认,必须确保剔凿处四周均已剔到密实砼才能报请监理检查。剔凿时,必须将剔凿部位的钢筋表面附着的砼清理干净。第二步:剔凿面处理。先用钢丝刷将剔凿面刷干净,再用空压机吹剔凿面,最后用压力水冲洗干净,确保无渣滓。第三步:结合层先用搅拌棍将配置好的界面处理剂(GH-303)搅拌均匀,再用刷子蘸取,均匀的涂刷在混凝土剔凿面上,待初步干燥后可进行下步工序。第四步:支模浇筑砼、支模方式如下图所示:中铁二局恒大金碧天下四期工程项目经理部混凝土质量缺陷处理方案3说明:如果可利用剪力墙上原有穿墙螺杆洞的,按相应位置适当调整,如果没有洞口,利用原有满樘支撑加固.喇叭口滑槽墙体楼面模板方木增加斜撑原满樘脚手架穿墙对拉螺杆模板下口嵌贴海绵条高出墙面部分尽量浇筑成砂浆浇筑前,砂浆打底模板支撑好后,先用少量同配比水泥砂浆铺底(保证底部铺满),开始浇筑砼,砼从支模时的留的喇叭口处灌入,浇筑时采用小型振捣棒振捣,确保密实。浇筑到喇叭口位置处时,尽量保证高出原墙面部分为砂浆(该部位无石子或少石子,以后剔除该部位时,表面比较光滑)。浇筑面要高于剔凿上口面5cm。第五步:拆模养护浇筑完成后24小时后,拆除模板,立即对喇叭口处超高砼进行剔除,剔除到原墙面后,采用角磨机将该部位磨平。然后进行洒水养护,派专人进行,确保养护质量。2.3第三类砼质量缺陷①缺陷描述:砼两面均存在比较大的蜂窝或露筋。中铁二局恒大金碧天下四期工程项目经理部混凝土质量缺陷处理方案4浇筑时,砼未填到的部位,局部没有砼。凡是砼构件两面均存在比较大的缺陷时,经剔凿贯穿,或砼构件一面存在质量缺陷,但经过剔凿,发现密实砼厚度很小时,也要剔穿再处理。②处理方式:第一步:剔凿。剔凿范围及深度由砼质量缺陷处理小组派专人确认。必须确保剔凿到密实砼,将剔凿部位的钢筋表面附着的砼清理干净,剔凿完成后,由砼质量缺陷处理小组自检通过,才能报请监理检查。第二步:剔凿面处理。剔凿面处理:先用钢丝刷将剔凿面刷干净,再用空压机吹剔凿面,最后用压力水冲洗干净,确保无渣滓。第三步:结合层先用搅拌棍将配置好的界面处理剂(GH-303)搅拌均匀,再用刷子蘸取,均匀的涂刷在混凝土剔凿面上,待初步干燥后可进行下步工序。第四步:支模浇筑砼支模方式如下页图示;模板支撑好后,开始浇筑砼,砼从支模时的留的喇叭口处灌入,浇筑时采用小型振捣棒振捣,确保密实。浇筑到喇叭口位置处时,尽量保证高出原墙面部分为砂浆(该部位无石子或石子少,以后剔除该部位时,表面比较光滑)。浇筑面要高于剔凿上口面5cm。第五步:拆模养护浇筑完成后24小时后,拆除模板,立即对喇叭口处超高砼进行剔除,剔除到原墙面后,将该部位磨与原墙面平。然后进行洒水养护,派专人进行,确保养护质量。支模方式示意图:中铁二局恒大金碧天下四期工程项目经理部混凝土质量缺陷处理方案5说明:如果可利用剪力墙上原有穿墙螺杆洞的,按相应位置适当调整,如果没有洞口,利用原有满樘支撑加固.穿墙对拉螺杆原满樘脚手架增加斜撑方木模板楼面墙体喇叭口滑槽模板下口嵌贴海绵条高出墙面部分尽量浇筑成砂浆浇筑砼前,砂浆打底剔凿要求示意图:原墙面缺陷外形剔凿打磨外形2.4其他①梁板楼梯,二次结构等参照处理,特殊情况处理方式如下:中铁二局恒大金碧天下四期工程项目经理部混凝土质量缺陷处理方案6a.缺陷处面积比较大,应剔除缺陷处以上的墙体,关模重新浇筑。b.缺陷处,暗柱砼缺陷范围比较大,应将整个暗柱高度内存在缺陷的范围全部剔除,关模重新浇筑。②对于烂根处的处理a.烂根程度比较轻的,采用干硬性砂浆填充满。b.烂根程度比较严重的,采用干硬性细石砼填充满。③由各种原因造成的砼冷缝的处理a.对于浇筑过程中因混凝土供应不及时或混凝土初凝时间过短形成冷缝的处理:采用同结构混凝土标号的微膨胀1:1素水泥浆(掺加缓凝剂)覆盖凝固混凝土面层,覆盖厚度2cm,随后马上跟进浇筑结构混凝土并及时振捣,振捣要求“快插慢拔”,每一振点振捣时间20~30s,至表面泛浆不冒出气泡为准,不可欠振,也不可过振振点成排布置,间距300~400mm,上层入下5cm,混凝土初凝进行二次抹压。b.对于模板拆除后从成型表面判断为施工冷缝的按第三类混凝土缺陷处理。第三章、修补使用的材料及机具3.1填补用水泥砂浆处理砼表面缺陷使用1:2水泥砂浆。使用的砂、水泥品牌及膨胀剂、泵送剂必须与原部位砼使用品牌一致,我项目将直接向生产该部位砼的搅拌站购买使用。3.2修补使用的砼修补使用的砼细石砼,要求比原部位砼高一个强度等级,砼中掺加UEA膨胀剂(水泥用量的12%)。为保证砼搅拌质量达到技术要求,并确保其使用的原材料、配合比与原砼一致,使用的砂、水泥及膨胀剂、泵送剂可直接从砼公司搅拌采购,也可按下面要求:砂:使用的砂为中砂,细度模数为:2.4~2.6。石子:使用细石,要求石子粒径在5~10mm,级配良好。水泥:必须使用与同原部位砼相同的水泥。中铁二局恒大金碧天下四期工程项目经理部混凝土质量缺陷处理方案73.3界面处理剂为保证新旧砼结合密实,在砼剔凿完成后,使用界面处理剂涂刷。界面处理剂型号选用GH-303。3.4机具①砼的剔凿使用两种工具,面积较小的部位使用铁簪子;面积较大并贯通剔凿的部位可使用电动风镐(使用时要注意不能破坏四周完好的砼构件,不能伤害到钢筋)。②空压机或电吹风:用于吹掉剔凿孔洞中砼残渣和杂物。③小型振捣棒局部浇筑面积比较小,常规振捣棒过大,不易插入施工,另购专用的小型振捣棒,一般缺陷可用手锤敲打配合钢筋插捣。第四章、缺陷处理流程及要求4.1砼缺陷处理流程鉴别缺陷类别和处理范围→剔凿密实处确认→关模→二次浇捣→养护→二次剔凿→打磨整个处理过程必须要有土建工区、工程部参加,安质部监管。4.2砼缺陷处理要求①对于砼养护的要求砼养护的好坏对于修补的效果具有极其重要的作用,因此,要安排专人进行