20145439CONSTRUCTIONTECHNOLOGY99DOI10.7672/sgjs2014090099BIM102488BIM。、、、、、。BIM、。TU248.1A1002-8498201409-0099-03ApplicationofBIMinLanzhouWestRailwayStationDaiRongliChinaConstructionRailwayEngineeringGroupBeijing102488ChinaAbstractBasedonLanzhouWestRailwayStationprojectthispaperintroducedtheresearchandapplicationofBIMintheconstructioncontractingprojectmainlyincludingbuilding3Dmodelpipelinescollisiondetectionpipelinesoptimizationconstructionsequencesimulationcomplexjointssimulationsteelstructureliftingsimulationmoreoverensuringthecombiningofsimulationandtheactualsitecondition.ItshowthatusingtheBIMtechnologycanavoidthecrossingandcollisionofeachconstructionstepthensolveproblemsbeforetheconstructiontoensuretheconstructionqualityandschedule.KeywordsbuildinginformationmodelingBIMsimulationcollisiondetectionjointsE-maildairongli77@126.com2013-10-12、、。、BIM。BIMBIM。1BIMBIMbuildinginformationmodelingBIMBIMBIM、、BIMBIM。BIMBIM。《2011—2015》、《2012》BIM。BIM。2“”BIM。10043。105864m239.55m102000m21、2、。1。1Fig.1ArchitecturaleffectofLanzhouWestRailwayStation++、、、、、、、、、、、、、、、、20。。、、、。BIMBIM。3BIM3.12013-05-31“”1018。LOD300、4D、。BIM2。3.2BIMNaviswork2BIMFig.2BasicBIMmodel。。3964、。3.3、。BIM、、3。3BIMFig.3BIMmodelforthebasementpipelines3.4。4BIM、4D。。2014No.9BIM1014Fig.4Simulationonconstructionprocess3.5BIM4D9.450m5、BIM、。5Fig.5Simulationoncomplexjoints1193.64D、。4BIMBIMBIM。4D915C-1C-6BIMC-1C-6C-2C-3C-1C-6BIM。9.450m2013-09-212014No.91196Fig.6Monitoringpointslayout7Fig.7Displacementandsettlementoftopringbeam8Fig.8Deepsoildisplacement。1。2。3、、。4。5+/。1.M.1999.2.R.2001.3.08SG360S.2009.4.GB50010—2010S.2010.5.No.13-C03612/4R.2010.6.1M.2006.10150mm。928。5BIM。BIM、、。BIM。1.BIMD.2010.2.BIMD.2012.3.BIMBIMJ.20104114-121.4.BIM———BIMM.2011.5.———BIM、J.2010310-224.6.BIMJ.2011451-57.