防台风专项施工方案

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

苏州绿地中央广场项目地块三3#楼防台风施工方案浙江港海建设集团有限公司1目录第一节、编制依据····················································2第二节、工程概况····················································3第三节、台风预警与预防··············································4一、有关台风的相关介绍············································4二、台风预警与预防················································4三、暴雨警报······················································6第四节、风险识别····················································7第五节、重点检查及监控内容··········································7一、临建设施······················································7二、围挡墙························································8三、起重运输机械··················································8四、脚手架工程···················································8五、临时用电·····················································9第六节、预防措施····················································9一、组织措施······················································9二、技术措施······················································11三、人员物资准备·················································11四、台风防御措施·················································12五、暴雨防御措施·················································14六、雷暴防御措施·················································15第七节、应急处理···················································16一、通讯联系·····················································16二、应急准备·····················································16三、重大事故报告及报警原则·······································17四、救援器材及设备···············································17五、各类事故预防及应急预案·······································18六、救援设备·····················································20七、应急救援路线·················································21苏州绿地中央广场项目地块三3#楼防台风施工方案浙江港海建设集团有限公司2第一节、编制依据1、《建筑工程质量检查与验收手册》2、《施工组织设计》3、《本项目施工图纸》4、《建筑施工现场环境与卫生标准》JGJ146-20135、《建筑高处作业安全技术规范》JGJ80-20166、《建设施工安全检查标准》JGJ59-20117、《建筑施工扣件钢管脚手架安全技术规程》JGJ130-2011苏州绿地中央广场项目地块三3#楼防台风施工方案浙江港海建设集团有限公司3第二节、工程概况工程概况序号项目内容1工程名称苏州绿地中央广场三号地块项目2工程地址苏州市科技城龙山路与科发路交叉口3建设单位绿地集团苏州高新置业有限公司4设计单位上海正轶建筑设计有限公司5勘察单位江苏省地质工程有限公司6建筑功能地下室为库房、停车场,商铺,地面楼层为商业用房7建筑面积及规模总建筑面积:约66406.47㎡,层数及单体建筑面积:3#楼为地下二层,地面36层.8檐高建筑檐高度:150m。9墙体类型框架柱、核心筒,内墙砂加气砼砌块10屋面防水卷材、XPS挤塑聚苯板、钢筋混凝土平屋面11幕墙玻璃幕墙12防水SBS改性沥青防水卷材、防水涂膜13楼地面水泥楼地面14内墙混合砂浆抹面15外墙玻璃幕墙。16保温XPS挤塑聚苯板、50厚岩棉带17标高:3#楼为4.2m(绝对标高),室内外高差0.2m结构概况序号项目内容1结构类型框架—核心筒2基础类型桩筏基础3抗震设防烈度6度4建筑结构安全等级二级5耐火等级一级6钢筋级别HPB300、HRB335、HRB400E苏州绿地中央广场项目地块三3#楼防台风施工方案浙江港海建设集团有限公司4第三节台风预警与预防一、有关台风的相关介绍1、台风是发生于热带洋面上的一种热带气旋。热带气旋是:生成于热带或副热带洋面上,具有有组织的对流和确定的气旋性环流的非锋面性涡旋的统称,包括热带低压、热带风暴、强热带风暴、台风、强台风和超强台风。当近地面最大风速到达或超过每秒17.2米时,即为台风。2、热带气旋分的等级划分热带气旋等级底层中心附近最大平均风速(m/s)底层中心附近最大风力(级)热带低压(TD)10.8-17.16-7热带风暴(TS)17.2-24.48-9强热带风暴(STS)24.5-32.610-11台风(TY)32.7-41.412-13强台风(STY)41.5-50.914-15超强台风(SuperTY)≥51.016或以上二、台风预警与预防:1、预警等级、信号根据台风影响范围和程度,台风预警等级分为四级:Ⅰ级(特别严重),Ⅱ级(严重),Ⅲ级(较重),Ⅳ级(一般)。台风预警信号分五种,分别以白色、蓝色、黄色、橙色和红色表示。2、台风预警信号及防御指引1)台风白色预警信号苏州绿地中央广场项目地块三3#楼防台风施工方案浙江港海建设集团有限公司5(1)图标:(2)含义:48小时内可能受热带气旋影响。(3)防御指引:a、警惕热带气旋对当地的影响;b、注意收听、收看有关媒体的报道或通过气象咨询电话等气象信息传播渠道了解热带气旋的最新情况,以决定或修改有关计划。2)台风蓝色预警信号(1)图标:(2)含义:24小时内可能受热带气旋影响,平均风力可达6级以上,或阵风7级以上;或者已经受热带气旋影响,平均风力为6~7级,或阵风7~8级并可能持续。(3)防御指引:a、做好防风准备;b、注意有关媒体报道的热带气旋最新消息和有关防风通知;c、固紧门窗、围板、棚架、临时搭建物,妥善安置易受热带气旋影响的室外物品;d、其它同台风白色预警信号。3)台风黄色预警信号(1)图标:(2)含义:24小时内可能受热带气旋影响,平均风力可达8级以上,或阵风9级以上;或者已经受热带气旋影响,平均风力为8~9级,或阵风9~10级并可能持续。(3)防御指引:a、进入防风状态,建议施工现场停止施工;b、关紧门窗,处于危险地带和危房中的居民以及船舶,应到避风场所避风,高空、水上等户外作业人员应停止作业,危险地带工作人员需撤离;c、相关应急处置部门和抢险单位加强值班,密切监视苏州绿地中央广场项目地块三3#楼防台风施工方案浙江港海建设集团有限公司6灾情,落实应对措施;d、切断危险的室外电源;e、停止露天施工活动,立即疏散人员;f、其它同台风蓝色预警信号。4)台风橙色预警信号(1)图标:(2)含义:12小时内可能受热带气旋影响,平均风力可达10级以上,或阵风11级以上;或者已经受热带气旋影响,平均风力为10~11级,或阵风11~12级并可能持续。(3)防御指引:a、进入紧急防风状态,停止现场所有施工作业;b、切勿随意外出,确保呆在最安全的地方;c、其它同台风黄色预警信号。5)台风红色预警信号(1)图标:(2)含义:12小时内可能或者已经受台风影响,平均风力可达12级以上,或者已达12级以上并可能持续。(3)防御指引:a、进入特别紧急防风状态,停止现场所有施工作业;b、人员应尽可能呆在防风安全的地方,相关应急处置部门和抢险单位随时准备启动抢险应急方案;c、当台风中心经过时风力会减小或静止一段时间,切记强风将会突然吹袭,应继续留在安全处避风;d、其它同台风橙色预警信号。三、暴雨警报暴雨警报信号分为黄、红、黑3个级别,如下所示:(一)黄色暴雨信号。其含义为:六小时内,本地将可能有暴雨发生。苏州绿地中央广场项目地块三3#楼防台风施工方案浙江港海建设集团有限公司7(二)红色暴雨信号。其含义为:在刚过去的3小时内,本地部分地区降雨量已达50毫米以上,且雨势可能持续。(三)黑色暴雨信号。其含义为:在刚过去的3小时内,本地部分地区降雨量已达100毫米以上,且雨势可能持续。第四节风险识别1、水淹(排水不畅)2、坍塌(坍塌或山体滑坡:包括构造物、堆置物、土石方、深基坑(槽)倒塌、活动板房倒塌等等)3、道路湿滑或冲毁4、室外进水等造成的损失5、户外高大设备倒塌(塔吊、标语牌、线杆、外架等)6、松散物飞扬造成的设备损害或人员伤害7、输配电系统损坏8、触电:电缆漏电、雷击伤害。第五节重点检查及监控内容施工现场要实行严格的台风来临前检查、台风天气持续期监控、台风天气过后复查的检查监控制度,安排专人分工负责,对现场的临建设施、围挡樯、塔吊基坑设施、起重运输机械、脚手架、施工用电等项目进行重点检查和监控。一、临建设施临建设施包括:宿舍、食堂、办公用房、厕所等。苏州绿地中央广场项目地块三3#楼防台风施工方案浙江港海建设集团有限公司8监控人的责任:全面检查临建设施的安全状况,如有裂缝、倾斜、变形现象,及时采取加固、翻修,达不到要求的必须拆除重建;台风暴雨天气必须安排专人进行不间断巡查;随时观察风雨对临建设施的影响、受损情况及基坑、脚手架、塔吊等可能对临建造成的破坏,如有危险立即将临建内人员转移到安全地方。二、围挡墙围挡墙包括:砖砌围挡墙或其他。监控人的责任:全面检查围挡墙的安全状况,如有破损、倾斜、变形等现象,及时采取加固、更换等措施;特别要加强对临街围挡墙的重点监护,如有险情,立即对围挡墙周边设警示隔离设施,并设专人看护,严防围墙倒塌伤人。三、起重运输机械起重运输机械包括:塔吊、施工电梯。监控人的责任:六级以上大风天气应立即停止作业;重点监控塔吊、人货梯稳定情况、附墙杆、排水情况、基坑对塔吊的影响等情况。四、脚手架工程监控人的责任:六级以上大风天气,禁止脚手架施工作业;重点监控脚手架基础沉降情况、排水情况,确保基础稳固;悬挑工字钢是否弯曲变形;架体拉结有效;对临近、房屋、高压线处重点监控,危险时应对脚手架危及范围内设置警示隔离带,并设专人监护。台风过后,对脚手架进行全面检查验收合格后,方可施工。苏州绿地中央广场项目地块三3#楼防台风施工方案浙江港海建设集团有限公司9五、临时用电临时用电包括:施工用电、生活用电等。监控人的责任:全面检查施工现场的各类临时用电设施、配电线路,严格实行三相五线制,确保做到三级配电、两级保护,各类配电设施的防雨设施防护完好;台风暴雨天气应立即切断总电源

1 / 21
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功