项目章程项目名称:XXXX项目项目发起人:XXXXX项目经理:XXXXXXX项目目的或批准项目的原因(从商业论证的角度去分析,如市场需求、组织需要、客户要求、技术进步、法律要求、生态影响、政府法规、社会需要、等)项目目的或批准项目的原因(从商业论证的角度去分析,如市场需求、组织需要、客户要求、技术进步、法律要求、生态影响、政府法规、社会需要、等)项目目标(项目的总体描述,应包含产品可交付成果的简介以及如何达到项目目的方法)具体(Specific):具体描述可度量(Measurable):可度量描述可实现(Attainable):可实现描述相关性(Relevant):相关性描述有时限(Time-bound):有时限描述高层级风险(项目启动阶段可能被识别出的风险,如:市场需求的快速变化、技术难度、资金是否及时到位)高层级风险(项目启动阶段可能被识别出的风险,如:市场需求的快速变化、技术难度、资金是否及时到位)总体预算(预计的项目总资金需求,可包括总体估算依据,阶段性资金需求等)总体预算(预计的项目总资金需求,可包括总体估算依据,阶段性资金需求等)假设条件(对于不确定性的因素做出的当前假设,如假定依赖模块如期可用)假设条件(对于不确定性的因素做出的当前假设,如假定依赖模块如期可用)制约因素(项目必须接受的约束性条款,如固定的完工日期,最大预算等)制约因素(项目必须接受的约束性条款,如固定的完工日期,最大预算等)总体里程碑(重要的中间成果交付节点)计划交付日期交付节点1年/月/日交付节点2年/月/日交付节点3年/月/日交付节点4年/月/日交付节点5年/月/日交付节点6年/月/日交付节点7年/月/日交付节点8年/月/日交付节点9年/月/日主要干系人角色(客户、职能经理、供应商)干系人1角色1干系人2角色2干系人3角色3干系人4角色4干系人5角色5干系人6角色6干系人7角色7项目经理的权利和责任(如对项目组成员的任务分配权力,使用支持部门资源的权力,及时告知项目干系人项目进展的责任等)项目经理的权利和责任(如对项目组成员的任务分配权力,使用支持部门资源的权力,及时告知项目干系人项目进展的责任等)章程批准人角色签名日期XXXXXXXXXXXX年/月/日XXXXXXXXXXXX年/月/日XXXXXXXXXXXX年/月/日XXXXXXXXXXXX年/月/日需求变更申请表项目名称:XXXXX变更申请编号:XXXXX变更申请人:XXXXX申请人所属部门:XXXXX变更申请日期:年/月/日计划完成日期:XXXXX原需求内容描述:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX变更内容描述:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX技术方案简要描述:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX变更对进度的影响:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX因为变更引起的风险:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX业务风险:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX技术风险:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX进度风险:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX成本风险:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX质量风险:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX提出人签字:年月日项目负责人签字:年月日功能需求确认单项目名称:XXXXX功能需求单编号:XXXXX申请人:XXXXX申请人所属部门:XXXXX申请日期:年/月/日需求标题:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX需求描述:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX项目风险:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX解决方案:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX相关研发人员:XXX,XXX,XXX,XXX,XXX,XXX预计完成时间:年/月/日提出人意见:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX提出人签字:年月日项目负责人意见:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX项目负责人签字:年月日项目验收确认单项目名称:XXXXXX版本号:V2.6需求描述:XXXXXXXXXXXXXXXXXXXXXXXXX项目版本及实现功能点:XXXXXXXXXXXXXXXXXXXXXXXXX需求提出人签字:年月日项目负责人签字:年月日需求列表(内部)需求编号需求描述需求类型需求提出部门需求提出及验收负责人提出时间完成时间制约因素开发时间评估测试时间评估所属版本备注XXXXXXXX业务需求董事长2.3XXXXXXXX业务需求董事长2.3XXXXXXXX业务需求董事长2.3XXXXXXXX过渡需求项目部2.4需求跟踪矩阵需求编号需求描述功能编号功能描述目标时间结束时间产品设计产品开发测试用例XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX工作分解结构需求编码需求描述分解任务描述XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX开发计划需求编号需求描述功能编号优先级责任人开发时间评估备注风险假设强制约验收标准确认方法xxxxxxxxXXXXXxxxxxxxxXXXXXxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx