筑龙网重庆**化工厂农转非还建房工程平基土石方工程施工方案筑龙网`````````````````````````````````````````````````````````1`````````````````````````````````````````````````````````1`````````````````````````````````````````````````````````1~2````````````````````````````````````````````````2~4`````````````````````````````````````````````````````````4~7````````````````````````````````````````````````````````7~13`````````````````````````````````````````````13~17```````````````````````````````````````````````````17~18``````````````````````````````````````````````1819````````````````````````````19~21`````````````````````````````````````````````````````````````2112345(1)(2).筑龙网重庆**化工厂农转非还建房工程平基土石方工程施工方案1平基土石方工程施工方案一、编制依据:1.施工承包合同2.招标文件3.地质勘察报告4.施工图说5.《土石方工程开挖及爆破工程施工质量验收规范》、《土石方工程安全技术规范》等6.**重庆**《质量、环境、职业健康安全一体化管理手册》QB/**QYS[QMS-EMS-DHMS]01-02二、综合说明:1.工程名称:重庆**化工厂农转非还建房工程2.工程地址:原**化工厂内***3.建设单位:*****建设开发有限公司4.设计单位:重庆**建筑设计院5.地勘单位:重庆**地质工程勘察院6.监理单位:**监理公司7.施工单位:**重庆**三.工程概况1、工程场地区域地质构造属沙坪坝背斜南端近轴部,岩层呈单斜状产出,倾向95-1050,倾角250,场地内未发现断层,基岩中发育筑龙网重庆**化工厂农转非还建房工程平基土石方工程施工方案2两组裂隙。2、场地内分布有第四系全新统人工填土残坡积粉质粘土,下伏朱羅系中统沙溪庙组的砂岩、泥岩、长石杂砂岩和粉砂岩。3、本场地无断层、软弱夹层、滑坡等不良地质现象。4、该场地内地下水主要为孔隙水和基岩裂隙水,大气降水为主要补给水源。5、该工程岩质边坡工程分类:锚杆挡墙A—H段为Ⅲ类,J—K段为Ⅱ类。(锚杆挡墙高8—16米,重力式挡墙高4—9米,场地四周几乎全是挡墙稳固边坡)。6、施工条件(1)施工现场无大的障碍物,施工用水、电已接入现场,容量能满足施工要求。(2)工程建设资金按建设方要求已落实到位。(3)施工平基范围及标高已确定(详见平面图)(4)施工工期:120天。四、施工组织与部署1、施工组织:(1)组织形式:按项目法施工模式和项目经理负责制实施本工程施工任务。根据实际,制定出组织形式机构图。详《组织机构》。(2)项目经理选择上岗:该工程工期紧,任务重,选派项目经理是关键。为此,选定政治思想素质好,有资质,工作能力强,经验丰富的项目经理。筑龙网重庆**化工厂农转非还建房工程平基土石方工程施工方案3a、必须具有项目经理任职资格,具有专业技术职能(务),专业水平高,业务能力强。b、必须组织能力强,抓工程项目工期、质量、安全的手段多,措施得力的管理者。c、亲自经历多个类似的工程项目,并连续获得成效者(工期快、质量优、效益佳)。组织机构图2、施工部署工程中标后立即与业主联系施工进场事宜(含水通、道路通等)项目经理组织相关管理人员进行入场准备工作分工,各施其职,各负其责,在10天内完成施工前的一切准备工作。其工作内容:(1)按施工总平面图和业主要求,搭设临时设施和部份施工围墙,安装敷设施工用电、用水线路。(2)选取进场施工道路,施工场地的地面硬化处理,挖好排水沟和沉砂集水井(坑)。沿建筑物周边设置排水沟,将施工废水、雨项目经理技术负责人施工员质量员安全员内业技术员设备管理员财务后勤保障平基土石方及爆破作业队(班、组)筑龙网重庆**化工厂农转非还建房工程平基土石方工程施工方案4水引入市政排水道。(3)对周边环境及相关行政管理部门进行协调、接口工作,确保工程的顺利实施。(4)对施工场地区域采用隔离全封闭施工,在涉及过往行人安全区域设专人执勤和搭建安全通道。(5)由于工期紧,采取大量投入人力、物力全面进行施工,为充分利用时、空,插入各部分项工程、工序施工,充分发挥人力、物力、机械设备的企业优式,保质量、保工期。五、施工准备1、组织准备(1)按“项目法”组织施工,组成《平基土石方》项目班子,建立项目经理部,实行项目经理负责制,实行项目管理。严格按“优质、快速、低耗、安全生产、文明施工”的目标进行管理,确保平基土石方工程的质量、安全、进度。土石方施工责任人员一览表职务姓名人数负责人1安全负责人1平基土石方专业工长1安全员1质量员1筑龙网重庆**化工厂农转非还建房工程平基土石方工程施工方案5临设管理员1(2)组织准备工作是取得平基土石方工程施工圆满完成的重要措施和首要前提。该项目班子成员是专业技术水平高,责任心强的管理人员。2、资源准备(1)按平基土石方工程的施工图预算工料分析和进度要求,由项目经理组织技术负责人编制材料资源需用量及进场计划。(2)平基土石方及爆破工程所需的材、辅、油料等,项目部按预算工料分析编制计划,交材设员比质、比价,按项目部提出的计划供应时间,组织进场,并设专人管理,保证工程所需材料的供应,保证各种材料的贮放安全。平基土石方材料需用计划材料名称规格型号单位用量汽油93#kg柴油0#kg100000机油kg润滑油kg(3)机具设备按方案编制的规格、数量、进场时间组织进场,并保证各种机具运转正常。机具设备一览表机具名称规格型号单位数量进场时间挖掘机CAT320C台2筑龙网重庆**化工厂农转非还建房工程平基土石方工程施工方案6挖掘机日立240台1推土机T220台2装载机L50台1空压机V-6/8台4自卸载重汽车红岩15T辆10软轴抽水机QWDLΦ32台4潜水泵Φ50台43、技术准备(1)根据建设单位提供的总平面图、挡土墙总平面图、**化工厂农转非还建房岩土工程详细勘察报告,认真熟悉、审核图纸。(2)调查、研究、收集必要的技术资料,进行现场实地勘察,做好现场施工平面布置。(3)建立平基土石方工程质量,安全检查制度。(4)施工仪器及通讯设备计划,施工前对施工仪器进行检验校核。施工仪器及通讯设备计划名称规格型号单位数量全站仪台1经纬仪T2激光经纬仪台1水平仪SD3台150m钢卷尺把2市内电话部1筑龙网重庆**化工厂农转非还建房工程平基土石方工程施工方案7照像机部1手机部管理人员各1部4、现场准备(1)对施工现场作详尽的勘察,勘察内容包括建筑工程的范围、地形、地貌、周围环境、交通运输。并实地了解工程地点的水文地质,有无地下管网,地下障碍物等,并做好勘察结果记录,与设计有关资料相比较,从而确定具体的施工平面布置,质量计划等。(2)搭建施工区域封闭围挡(砖砌围墙,专用工具式围挡网、板等),高度为2米。做到坚固、稳定、整洁、美观。并在主要出入口处挂置“六牌一图”,分生活区和生产区布置搭建临设工程,临设工程做到井然有序,并符合安全、卫生、通风、采光、防火等要求。(3)配合建设单位现场代表,做好坐标点,水准点的交接工作,并形成书面文件。六、平基土石方工程施工1、平基土石方挖方施工土方开挖采用分层纵挖法,开挖中尽可能按土或岩石层次分层进行开挖,挖掘工作如在短距离时,使用大型推土机和铲运机联合作业,开挖中如发现土层性质与设计不符,应及时向监理工程师、业主书面反应。以便及时作出适当的调整。开挖土方地段有含水层时,在开挖该层土方前,应采取排水措施后再进行开挖。石方采用阶梯分层开挖,边坡及临近锚杆挡土墙1-3m范围修凿采用人工硬打。见(锚杆挡墙位置处边坡开挖示意图)筑龙网重庆**化工厂农转非还建房工程平基土石方工程施工方案8土石方施工程序框图施工准备运输通道设备进场测量定位放线平整场地挖运检底平整工程自检、竣工资料交工验收2、平基土石方回填碾压及场地平整按设计要求和技术规范要求,作好场地基层处理,首先应清除地表植物根茎、耕植土,淤泥。水田或集水洼地地段先开沟、排水、晒干、挤淤,设置横向排水碎石盲沟,并做好施工期间排水工作。当地面横坡陡于1:5时,地基应开挖台阶,其宽度2~5m,或视横坡度大小而定。一般坡度陡者台阶宽度小,坡度缓者台阶宽度则大,台阶应有2~4%的向内倾斜坡,以确保场地稳定。筑龙网重庆**化工厂农转非还建房工程平基土石方工程施工方案9场地回填应从最低处分层填起,每层摊铺厚度不得大于50cm,用推土机分层推平,采用60t压路机和液压振动压路机分层碾压密实。重叠宽度至少30cm,碾速不超过每分钟30m。并经检测合格后才能进行下一层的填筑。当土石混合填筑时,应分层填筑碾压,确保压实度符合压实标准。根据石块含量多少,分别按技术规范施工,当石块含量多于75%时,将石块大面向下,小面向上分开摆平放稳,缝隙内填满土或石屑,每层厚度不超过50cm,大致调平后用振动压路机压实,当石块含量小于75%时每层填筑厚度不大于30cm,石块最大尺寸应小于层厚的2/3,底层100cm厚度内不采用含有大石的混合料。在填方中有较大石块,应采用矿山碎石机对石料进行二次破碎。填挖方交界处,为了避免在工程完工后填方和挖方交界处因场地不均匀沉降造成地面开裂破坏,施工中采取在场地底基层以下300mm处沿填挖交界线开挖台阶。场地填方分层铺筑、均匀压实,压实度符合规范规定要求。零挖填地段,应下挖80cm左右,再换填砂岩,填筑时按分层碾压密实。软基(或淤泥地段)处理,当软土(或淤泥)深度在3m以内时,采取挖除软土(或淤泥)换填砂岩进行处理。当软土(或淤泥)深度超过3m时,应根据地质构成采用抛石挤淤或塑料排水板。场地填方分层铺筑、均匀压实,填筑时,填筑面应保留2%~4%的排水坡度,以避免集水。构筑物背如涵背、挡土墙背80cm范围内及机械无法到达处采用直立式冲击夯夯实。填方边坡处理,填方区边缘应超填50cm,碾压密实后,每2-3米高用机械辅以人工修整边坡至设计位置,修整完后,采用人工拍打筑龙网重庆**化工厂农转非还建房工程平基土石方工程施工方案10密实。场地回填碾压质量保证技术措施A、填方地段的基底应保证坚实稳定,如有草皮,树根等植物残骸应予清除,基底如为松土时,应先压实再回填,如松土深度较大,应先将松土翻挖,再逐层回填压实,基底如有淤泥或其它不能压实的土料,应挖除后再用好土回填。B、在本工程场地平整过程中,不得使用淤泥或其他由于各种原因而不便压实的土和有机物含量大于8%的土作为填料,应尽量用碎砾石开山石土填料回填,碎石含量在30%以上。当填料中含有碎石土时,其粒径不宜大于200mm,若填料的主要成分为易风化的碎石土时,应加强地面排水和表面覆盖等措施,碎石土填料应有一定的级配,以便于压实。C、回填土的压实度要求如下:a.设计地面标高压实系数不小于0.95。b.距挡土墙边0.8m范围内压实系数不小于0.90(采用人工夯实)。D、所有填方地段均应从低处填起,各层大致水平,严禁形成倾斜的层面,