恒大绿洲综合楼工程脚手架施工方案中国建筑第四工程局有限公司ChinaConstructionFourthEngineeringDivisionCORP.LTD恒大绿洲综合楼工程脚手架施工方案编制:审核:审批:中国建筑第四工程局有限公司2010年05月恒大绿洲综合楼工程脚手架施工方案中国建筑第四工程局有限公司ChinaConstructionFourthEngineeringDivisionCORP.LTD目录第一章、工程概况........................................................................................................1第二章、编制依据........................................................................................................1第三章、落地外脚手架搭设的基本条件与内容........................................................1第四章、双排外架搭设技术参数................................................................................11、立杆间距...........................................................................................................12、纵向水平杆.......................................................................................................23、横向水平杆.......................................................................................................24、剪刀撑...............................................................................................................25、安全网、脚手板设置.......................................................................................36、护栏和挡脚板设置...........................................................................................37、人梯设置...........................................................................................................38、杆件连接构造要求...........................................................................................39、连墙点...............................................................................................................410、连墙件的设置.................................................................................................411、扫地杆.............................................................................................................4第五章、计算书............................................................................................................41、参数信息...........................................................................................................42、小横杆计算.......................................................................................................53、大横杆计算.......................................................................................................64、扣件抗滑力计算...............................................................................................85、立杆荷载计算...................................................................................................86、立杆稳定性计算...............................................................................................97、连墙件稳定性计算.........................................................................................10第六章、脚手架搭设质量要求和管理......................................................................111、材料准备.........................................................................................................112、搭设作业.........................................................................................................12第七章、搭设质量检查及验收..................................................................................141、人员选择.........................................................................................................142、检查监督.........................................................................................................14第八章、脚手架塔设、拆除安全技术措施..............................................................15第九章、安全注意事项..............................................................................................16第十章、防雷避雷措施..............................................................................................16恒大绿洲综合楼工程脚手架施工方案中国建筑第四工程局有限公司ChinaConstructionFourthEngineeringDivisionCORP.LTD1第一章、工程概况恒大绿洲综合楼工程,位于海口市迎宾大道,总建筑面积5130.78㎡,框架结构,地上4层,无地下室。首层层高为5.1米,局部6.3米;二层层高4.5米,局部4.3米;三层4.5米,局部6米;四层5.3米。本工程设计使用年限为50年,建筑高度为19.70米。第二章、编制依据1、《建筑施工扣件式脚手架安全技术规范》JGJ130-20012、《建筑施工安全检查标准》JGJ59-993、《建筑施工高处作业安全技术规范》JGJ80-914、中国建筑工业出版社出版的《建筑施工手册》(第四版)5、本企业同类工程施工经验和技术资料第三章、落地外脚手架搭设的基本条件与内容1、本工程基础工程结束后,拆除所有的模板和支撑,清理所有杂物,按图纸要求及时平整四周场地,为外架的搭设提供基本条件。2、外架自±0.000开始搭设,四层建筑物的架体高度约22米,因此架体下的土层必须夯实,并且沿外墙1500mm范围内,凡需要搭架的位置浇筑100厚C15混凝土垫块或50mm(垫木)做为外架基础。在外脚手架的四周设一条宽为250×300的排水沟,排水沟采用标准水泥砖砌筑。3、结合本工程结构形式、实际施工特点,建筑物四周搭设落地式、全高全封闭的扣件式双排钢管脚手架。此架为一架三用,既用于结构施工和装修施工,同时兼作安全防护。内立杆距外墙0.30m,小横杆距墙0.15m,排距为1.05m,纵距为1.50m,大横杆步距为1.80m。第四章、双排外架搭设技术参数1、立杆间距立杆间距采用1.5m,立杆顶端高出结构檐口上皮1.5m。立杆接头采用对接扣件连接,立杆与大横杆采用直角扣件连接。接头交错布置,两个相邻立柱接头避免出现在同步同跨内,并在高度方向错开的距离不小于500mm;各接头中心距主节点的距离不大于600mm。恒大绿洲综合楼工程脚手架施工方案中国建筑第四工程局有限公司ChinaConstructionFourthEngineeringDivisionCORP.LTD22、纵向水平杆纵向水平杆应设置在立杆之内侧。其长度不宜小于3跨,纵向水平杆接长宜采用对接扣件接长,接头位置应交错布置,两根相邻纵向水平杆的接头不宜设置在同步或同跨内。不同步或同跨内两个相邻接头在水平方向错开的距离不应小于500mm,各接头中心至最近主节点的距离不宜大于纵距的1/3。在作业层应增设一道纵向水平杆,以保证脚手板的安全铺设。3、横向水平杆主节点处必须设置一根横向水平杆,用直角扣件连接且严禁拆除。主节点处两个直角扣件的中心距不应大于150mm,杆件端部伸出扣件之外的长度不得小于100mm。小横杆间距应与立杆柱距相同,且根据作业层脚手板搭设的需要,可在两立柱之间在等间距设置增设1-2根小横杆,其最大间距不大于750mm。双排脚手架的横向水平杆两端均应用直角扣件固定在纵向水平杆上。≥500mmh/3≥500mmaa/3立杆立杆接头横杆立杆、大横杆接头位置示意图4、剪刀撑剪刀撑随立杆、纵横向水平杆同步搭设,用通长剪刀撑沿架高连续布置。剪刀撑每6步6跨设置一道,斜杆与地面的夹角在45°~60°之间。斜杆相交点处于同一条直线上