连云港苏宁广场项目部大底板施工专项方案中国建筑第八工程局有限公司2目录第一章工程概况........................................................11.1编制依据..........................................................11.2工程概况..........................................................11.3参建单位..........................................................1第二章施工安排........................................................22.1工程目标..........................................................22.2总体安排..........................................................22.2.1底板后浇带及底板分区..........................................22.2.2底板施工顺序..................................................32.3底板施工进度计划..................................................42.4工程管理机构及岗位职责............................................5第三章施工准备与资源配置计划..........................................63.1技术准备..........................................................63.2材料准备..........................................................73.2.1钢筋材料准备..................................................73.2.2混凝土材料准备................................................83.3人员准备..........................................................83.4资源配置计划.....................................................103.4.1施工机具.....................................................10第四章工程施工方案...................................................114.1底板钢筋分项工程.................................................114.1.1钢筋进场检验.................................................114.2.2钢筋放样.....................................................114.1.3钢筋调直.....................................................114.1.4钢筋切断.....................................................124.1.5钢筋弯曲.....................................................124.1.6钢筋连接检验.................................................134.1.7钢筋绑扎.....................................................144.1.8底板钢筋支架.................................................144.2底板模板分项工程.................................................144.3混凝土分项工程...................................................154.3.1混凝土浇筑方案...............................................154.3.2混凝土浇筑前注意事项.........................................194.3.3混凝土的搅拌、运输与现场浇筑.................................204.3.4大体积混凝土裂缝控制措施.....................................234.4混凝土浇筑的温度检测与控制.......................................244.4.1大体积混凝土的温控指标.......................................244.4.2底板温度估算.................................................244.4.3底板砼的覆盖养护计算.........................................254.4.4基础底板测温监控.............................................25连云港苏宁广场项目部大底板施工专项方案中国建筑第八工程局有限公司34.4.5基础底板混凝土养护...........................................28第五章施工质量保证措施...............................................305.1质量保证措施.....................................................305.1.1施工管理质量保证.............................................305.1.2材料质量控制:...............................................315.1.3机械设备质量控制.............................................325.2质量检测措施.....................................................32第六章安全文明施工措施...............................................336.1安全保证措施.....................................................336.1.1钢筋施工安全措施.............................................336.1.2用电及机械设备安全措施.......................................336.2文明施工措施.....................................................34第七章应急措施.......................................................357.1突发事件预测.....................................................357.2应急措施.........................................................35 连云港苏宁广场项目部大底板施工专项方案中国建筑第八工程局有限公司1第一章工程概况1.1编制依据文件名称编号类别建筑工程施工质量验收统一标准GB50300-2001国标建筑地基基础工程施工质量验收规范GB50202-2002国标钢筋混凝土结构工程施工质量验收规范GB50204-2002国标普通混凝土配合比设计规程JGJ55-2000行标混凝土外加剂应用技术规范GBJ119-88国标1.2工程概况工程名称连云港苏宁广场项目工程地址连云港市新浦区通灌北路、海连中路路口施工范围基础底板钢筋加工、制作、绑扎,砼浇筑设计简介基础大体积砼,总方量约为22875m³,采用50天强度等级,砼等级C35,设计抗渗等级P10。工程施工条件本工程处于连云港市新浦区中心地段,四周交通便利,砼搅拌站至工地12Km左右,但高峰期车辆较多,道路拥堵;本工程场地狭小,只有栈桥部位可以停放车辆,而栈桥荷载规定轮式车辆自重+载重为300KN;2#楼砼浇筑厚度为2.5、深坑位置砼浇筑厚度3m,3#、4#27层住宅区域砼浇筑厚度为1.5m,其余底板砼浇筑厚度为0.9m。1.3参建单位建设单位连云港苏宁置业有限公司设计单位上海联创建筑设计有限公司施工单位中国建筑第八工程局有限公司监理单位上海市建设工程监理有限公司勘察单位连云港鸿洋岩土勘察设计有限公司结构队伍 南通三建 连云港苏宁广场项目部大底板施工专项方案中国建筑第八工程局有限公司2第二章施工安排2.1工程目标表2.1—1项目管理目标表项目管理目标名称目标值进度目标2012年03月01日~2012年05月22日质量目标确保一次性合格,即质量工程一次验收合格安全目标安全生产重大事故为零,一般事故率控制在1‰以内2.2总体安排2.2.1底板后浇带及底板分区本工程2#楼砼浇筑厚度为2.5、深坑位置砼浇筑厚度3m,3#、4#27层住宅区域砼浇筑厚度为1.5m,其余底板砼浇筑厚度为0.9m。根据后浇带将底板划分为:1#、2#、3#、4#、5#、6#、7#、8#、9#、10#共十块底板。后浇带位置及底板分区如图2-1所示:图例:图2-1后浇带位置及底板分区图连云港苏宁广场项目部大底板施工专项方案中国建筑第八工程局有限公司32.2.2底板施工顺序1、第四层土方开挖分7大区域依次开挖,土方开挖分区、土方开挖流程如图2-2、2-3所示。图例:图2-2第四城土方开挖分区图图2-3第四层土方开挖流程图一区土方开挖二区土方开挖三区土方开挖四区土方开挖五区土方开挖七区土方开挖六区土方开挖连云港苏宁广场项目部大底板施工专项方案中国建筑第八工程局有限公司42、底板施工顺序第四层土方开挖将分7个大区施工(一区、二区包括1#、2#两块底板;三区包括3#、4#两块底板;四区包括5#、6#两块底板;五区包括7#底板;六区包括8#底板;七区包括9#、10#两块底板)。第四层土方开挖分区图如图2-2所示、土方开挖流程如图2-3所示。结合土方开挖顺序底板施工按:1#底板→2#底板→3#底板→4#底板→5#底板→6#底板→7#底板→8#底板→9#底板→10#底板的顺序施工。2.3底板施工进度计划本工程底板浇筑分为7次大体量混凝土浇筑,其浇筑时间和顺序如下表:表2-1各施工区混凝土浇筑计划表浇筑区域施工段面积(㎡)混凝土量(m3)理论浇筑时间(h)计划投入混凝土泵浇筑进度m3/h一区28924977401台汽车泵和2台固定泵140二区20564100321台汽车泵和2台固定泵120三区31173228231台汽车泵和2台固定泵140四区26042767233台固定泵120五区17801602161台汽车泵和1台固定泵100