XXXXXX工程塔吊安装拆除方案XXXXXXXX工程质量样板引路方案1目录1.编制目的····················································································································12.编制依据····················································································································13.工程概况····················································································································14.施工部署····················································································································24.1人员组织······································································································24.2技术准备······································································································24.3现场准备······································································································24.4样板方案······································································································24.5主体结构样板层施工进度计划···········································································35.分项工程实物样板施工··································································································35.1钢筋工程······································································································35.2模板工程······································································································75.2.1施工内容和技术措施·················································································75.2.2质量标准································································································75.2.3模板工程质量验收要求··············································································95.2.4成品保护································································································95.3混凝土工程···································································································95.3.1施工内容和基本要求···············································································105.3.2质量标准······························································································105.3.3混凝土工程质量验收要求·········································································125.3.4成品保护······························································································135.4钢结构工程·································································································135.5砌体工程····································································································155.6防水工程····································································································165.6.1地下室防水···························································································165.6.2厨房、卫生间、阳台防水实物样板·····························································165.7预留预埋、电气配管·····················································································175.8防雷和接地·································································································185.9管道穿墙、梁套管预埋··················································································195.10给水管道剪力墙、楼板压槽············································································216.样板引路施工注意事项································································································21XXXXXX工程塔吊安装拆除方案XXXXXXXX工程质量样板引路方案11.编制目的在项目施工管理过程中,由于施工一线作业人员可能会出现操作不规范,技能水平不高,采取口头、文字等方式进行技术交底和岗前培训往往不能达到应有的效果;同时,也有可能因施工现场未按一定程序和要求制作用于指导施工的实物质量样板,使得技术交底、岗前培训、质量检查、质量验收等方面都缺乏统一直观的判定尺度。为解决这一问题,在工程施工中推行工程质量样板引路的做法,使之成为工程施工质量管理的一项工作制度,即根据工程实际和样板引路工作方案制作实物质量样板,配上反映相应工序等方面的现场照片、文字说明,使技术交底和岗前培训内容比较直观、清晰,易于了解掌握,同时也提供了直观的质量检查和质量验收的判定尺度,从而有利于消除工程质量通病,有效地促进整个工程施工质量整体水平的提高。综上,为提高项目工程施工质量,规范各分项工程施工的作业程序,提高施工水平,完善施工标准,完成创优目标,特制定本样板引路方案。各分项工程均要贯彻执行首件样板制,高标准检查样板层的工程质量,推广执行标准化工艺。2.编制依据(1)本工程施工设计图及各种设计变更单、技术核定单;(2)《建筑工程施工质量验收统一标准》(GB50300-2013;(3)《混凝土结构工程施工及验收规范》(GB50204-2011);(4)《防水工程质量验收标准》(GB50208—2011);(5)《砌体工程施工质量验收规范》(GB50203—2011);(6)《建筑装饰装修工程质量验收规范》(GB50210—2011);(7)《建筑电气工程施工质量验收规范》(GB50303—2002);(8)其它各类文件。3.工程概况合肥置地广场工程由安徽置地投资(合肥)有限公司投资兴建,位于合肥市政务文化新区核心区域,龙图路南侧,嘉和路北侧,星光西路西侧,怀宁路东侧。项目用地北面为省广电中心,东面为城市绿轴景观带,西面为省文博园。E座位于置地工程场地东南角,占地面积6500㎡(含附属地库),总建筑面积约69000㎡(含附属地库),其中地下建筑面积19000㎡,地上建筑面积50000㎡。地下室4层,地上31层,建筑高度131.65米,地下2~4层为停车库,-1层~3层为商业,4层以上为办公用房,15层为避难层。E座结构XXXXXX工程塔吊安装拆除方案XXXXXXXX工程质量样板引路方案2形式为框架剪力墙结构。地下4层,层高3.7m/3.8m/3.9m/3.05m,地上31层,层高3.6m、4.5m、5.7m、4.0m(标准层)/4.8(避难层)m。4.施工部署4.1人员组织根据项目部的人员,由项目经理统一调配人员组成样板施工指导、监督小组。组长:丁应章(项目经理)副组长:杨杰(项目执行经理)、赵威中(质量总监)、孟华(技术负责)、曾华超(生产经理)成员:王中、杨彪、时小亮、程广起、曹俊杰。项目经理职责:负责全面管理组织落实质量样板引路工作,负责同业主单位协调质量样板实施工作。项目总工职责:负责编制质量样板引路实物样板工序技术方法;指导制作实物样板工序。生产经理职责:负责指导质量实物样板工序的施工,组织现场施工人员进行培训学习。质量总监职责:负责安排对质量样板间实物样板工序的施工质量进行检查验收;监督指导实物样板工序的有关技术方法落实。其他人员职责:进行现场交底讲解质量样板工序技术施工步骤、要点、难点;负责组织安排现场施工人员进场学习,并做好交底记录签证、现场拍照记录;负责安排、监督样板的实施;整理形成工程档案资料存档。4.2技术准备根据施工进度要求及时对项目管理人员、班组操作工人进行技术、安全、质量、操作规程的交底工作,有条件时可到其他项目实物样板层进行参观。4.3现场准备1)及时进行分部工程的隐蔽验收工作,以便组织实物样板的施工。2)按进度将各施工材料分批进场,并进行相关见证送检工作,确保施工材料符合设计、施工要求。4.4样板方案本“样板引路”方案为:在钢筋加工车间制作钢筋展示台,按照规范、图纸等相关要求制作样板,施工过程以样板为