监理单位取样说明3.8筛上重mi(g)分计筛余(%)累计筛余(%)通过百分率(%)筛上重mi(g)分计筛余(%)累计筛余(%)通过百分率(%)通过百分率(%)9.50000004.7512.82.62.697.410.62.12.197.997.72.36133.426.629.270.8124.724.927.073.071.91.1884.316.846.054.097.819.646.653.453.70.695.619.165.134.987.417.564.135.935.40.365.713.178.221.872.114.478.521.521.70.156112.290.49.647.39.588.012.010.80.07526.45.395.74.339.27.895.84.24.3筛底m底00干筛后总量∑mi(g)479.2479.12.12.50.40.5498.6497.6损耗率(%)扣除损耗后总量(g)损耗m5(g)481.3筛孔尺寸0.075mm通过率(%)19.43.9试验:计算:复核:试验日期:水洗后干筛法筛分备注:筛分曲线481.6细集料筛分记录(编号:)D-33.2建设项目:中牟县S223线(姚家至三官庙)社区道路改建工程合同号:NO.23.7干燥试样总量m3(g)第一组水洗后0.075mm筛下量m0.075(g)水洗后筛上总量m4(g)k5+570-k7+440500.1施工单位施工段落河南省建设集团有限公司500.7河南省中原公路工程监理有限公司18.5第二组(S15)石屑.平均0102030405060708090100通过百分率(%)0.075筛孔尺寸(mm)0.150.30.61.182.364.759.5