安徽池州石台(珂田)35kV变电站工程施工安全管理及风险控制方案池州市石台利源有限公司16年8月20日批准:年月日技术审核:年月日安全审核:年月日编写:年月日目录1概述························11.1编制目的······························································11.2编制依据······························································11.3工程概况······························································32安全目标·······················42.1安全管理目标························································42.2环境目标······························································42.3文明施工目标·························································53安全管理机构及职责··················53.1管理机构·······························································53.2安全职责·····························································64施工安全管理措施···················94.1作业人员基本条件··················································94.2安全管理制度和台帐···············································94.3专项施工方案································错误!未定义书签。4.4施工机械管理······················································114.5安全费用管理······················································124.6作业人员行为管理················································124.7应急管理措施······················································135施工安全风险管理··················135.1施工安全风险管理措施··········································135.2重大施工安全风险控制措施····································146安全文明施工管理措施················186.1施工准备阶段······················································186.2土建施工阶段······················································226.3电气安装阶段······················································236.4试验调试阶段······················································247环境保护及水土保持措施···············257.1防止大气污染······················································257.2防止水土污染和水土保持·······································257.3防止噪声污染······················································268分包安全管理····················269安全检查及隐患排查·················2710信息管理······················2811安全管理评价····················28池州石台(珂田)35kV变电站工程施工安全管理及风险控制方案11概述1.1编制目的为规范和指导工程施工安全管理、文明施工及安全风险过程管控,明确各岗位职责,落实参建人员安全责任;按照“安全管理制度化、安全设施标准化、现场布置条理化、机料摆放定置化、作业行为规范化、环境影响最小化”的要求,对本工程施工安全工作进行全方位细致的策划,预判重大作业风险,制定风险预控措施,保障作业人员和设备财产安全,实现工程安全目标。特制定本方案。1.2编制依据主席令1996年第77号中华人民共和国环境噪声污染防治法主席令2014年第13号中华人民共和国安全生产法主席令2008年第8号中华人民共和国消防法(2008年修订)主席令2008年第87号中华人民共和国水污染防治法(2008年修订)主席令2011年第47号中华人民共和国道路交通安全法(2011年修正版)主席令2011年第46号中华人民共和国建筑法(2011年修正版)国务院令2003年第393号建设工程安全生产管理条例国务院令2007年第493号生产安全事故报告和调查处理条例国务院令2011年第599号电力安全事故应急处置和调查处理条例建设部令第128号建筑施工企业安全生产许可证管理规定发改办能源〔2007〕1808号电网工程建设预算编制与计算标准GB∕T50326-2006建设工程项目管理规范GB/T50640-2010建筑工程绿色施工评价标准GB50194-1993建设工程施工现场供用电安全规范GB13955一2005剩余电流动作保护装置安装和运行GB2893一2008安全色GB2894一2008安全标志及使用导则JGJ80-91建筑施工高处作业安全技术规程JGJ130-2011建筑施工扣件式钢管脚手架安全技术规范JGJ33-2012建筑机械使用安全技术规程JGJ46—2011施工现场临时用电安全技术规范JGJ162-2008建筑施工模板安全技术规程JGJ59-2011建筑施工安全检查标准Q/GDW248-2008输变电工程建设标准强制性条文管理规程2Q/GDW250-2009输变电工程安全文明施工标准Q/GDW274-2009变电站工程落地式钢管脚手架搭设安全技术规范Q/GDW665—2013国家电网公司电力建设安全工作规程(变电站部分)皖电安监[2013]161号安全生产工作规定国家电网安监〔2012〕1821号国家电网公司应急工作管理规定国家电网基建〔2005〕534号国家电网公司输变电工程施工安全措施补助费、文明施工措施费管理规定(试行)国家电网基建〔2011〕1015号关于印发国家电网公司电网建设工程安全管理评价办法的通知国家电网〔基建/3〕176-2015国家电网公司电网工程施工安全风险识别、评估及控制办法(试行)国家电网〔基建/2〕173-2015国家电网公司基建安全管理规定国网(基建/3)181-2015国家电网公司电网建设工程施工分包管理办法国家电网安监〔2005〕516号国家电网公司电力安全工器具管理规定(试行)国家电网安监〔2006〕618号国家电网公司安全技术劳动保护七项重点措施(试行)国家电网安监〔2011〕2024号国家电网公司安全事故调查规程国家电网安监〔2008〕1057号国家电网公司电力建设工程分包安全协议范本DL5009.3-2013国家电网公司电力安全工作规程(变电部分)国家电网〔基建/3〕187-2015国家电网公司关于印发国家电网公司输变电工程安全文明施工标准化管理办法的通知基建安全〔2012〕132号关于进一步落实基建安全“挂牌督查”工作要求的通知基建安全〔2010〕270号关于开展输变电工程施工现场安全通病防治工作的通知国家电网科〔2010〕1256号国家电网公司环境保护管理办法施工合同项目建设管理纲要项目安全文明施工总体策划施工组织设计31.3工程概况工程概况石台珂田35kV输变电工程是一新建工程,主要是为了提高供电可靠性,满足新增负荷需求。该工程包括以下2个子项目:(1)珂田35kV变电站新建工程;(2)红石—珂田35kV线路工程;工程规模:(1)变压器容量2台3.15MVA主变压器,终期根据负荷发展情况,可扩容为2台10MVA主变压器。具体主变参数如下。主变压器容量:本期:2×3.15MVA,终期2×10MVA;型号:SZ11-3150/35三相双绕组有载调压变压器;电压比:35±3×2.5%/10.5kV;阻抗电压:Uk%=6;接线组别:YNd11;(2)出线规模35kV出线:本期2回,终期4回,本、终期为单母线分段接线;10kV出线:本、终期8回,本、终期为单母线分段接线;。(3)无功补偿容量本站无功补偿按补偿主变的无功损耗设计,配置2组容量为600kvar电容器,分别接于两段10kV母线上。2.1.7.4导线截面的选择珂田35kV变电站终期主变容量为2×3.15MVA,单回线路输送的最大容量约为6.3MVA。本工程新建35kV线路导线截面选为150mm2(150mm2导线经济输送容量为10.4MVA,持续极限输送容量为21.9~27MVA)。。4(4)电气主接线本期工程安装2台3150kVA三相双绕组自冷有载调压变压器,电压等级为35/10kV,终期为2台10MVA变压器。35kV本期出线2回,采用单母线分段接线;终期出线4回,亦采用单母线分段接线。10kV本、终期均出线8回,采用单母线分段接线。(6)配电装置35kV配电装置采用户外软母线中型布置。10kV配电装置采用户内金属铠装中置式开关柜,户内单层双列布置。主变压器采用屋外敞开式布置,主变选用低噪音自冷变压器,以减少对周围环境的影响。10kV并联电容器采用户外框架式布置。2安全目标2.1安全管理目标1.不发生六级及以上人身事件。2.不发生因工程建设引起的六级及以上电网及设备事件。3.不发生六级及以上施工机械设备事件。4.不发生火灾事故。5.不发生环境污染事件。6.不发生负主要责任的一般交通事故。7.不发生基建信息安全事件。8.不发生对公司造成影响的安全稳定事件。2.2环境目标依据国网(基建/3)173-2015《国家电网公司基建安全管理规定》要求,树立国家电网公司输变电工程安全文明品牌形象:“设施标准、行为规范、施工有序、环境整洁”。现场的安全文明施工设施、安全标识标志、绿色施工等各个方面必须达到《安徽省电力公司输变电工程安全文明施工标准化模板》中的相关要求。安全标示、标志清晰规范,实行办公区、加工区和施工区域的分区隔离。52.3文明施工目标环保、水土保持、安全、劳动卫生等各项工作应满足相关政府主管部门的管理要求及验收标准。不发生环境污染事故,污染按规定排放,污水深沉排放合格率100%,施工噪声不超标。3安全管理机构及职责3.1管理机构安徽池州石台(珂田)35kV变电站工程施工项目部安全管理机构图质检员:李兴龙技术员:傅容项目经理:陈斌安全员:叶勇项目总工:傅容材料员:杨贞娣造价员:王根养63.2安全职责3.2.1项目经理的安全职责(1)负责施工项目部各项管理工作,是本项目部安全第一责任人。(2)组织建立本项目部安全管理体系,保证其正常运行,主持项目部安全会议。(3)组织确定本项目部的安全目标,制定保证目标实现的具体措施。(4)组织编制符合工程项目实际的项目管理实施规划(施工组织设计)、安全管理及风险控制方案、工程施工强制性条文执行计划、现场应急处置方案等项目管控文