工字钢悬挑脚手架施工方案6.1222522

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

深圳中海建筑有限公司悬挑脚手架专项方案1目录一、编制依据·············································1二、工程概况·············································1三、总体筹划及施工部署···································21、总体筹划··········································22、安全领导小组······································4四、搭设流程及施工工艺···································4五、材料选择及构造要求···································15六、劳动力安排···········································16七、脚手架检查与验收·····································171、构配件检查与验收··································172、脚手架检查与验收··································18八、脚手架施工安全保证措施·······························191、组织保障··········································192、技术措施··········································223、监测监控··········································23九、应急预案·············································25十、型钢悬挑脚手架计算书·································27深圳中海建筑有限公司悬挑脚手架专项方案2型钢悬挑脚手架专项施工方案一、编制依据1、北干街道施家桥社区城乡一体化安置房施工设计图纸;2、北干街道施家桥社区城乡一体化安置房施工组织设计;3、各类参考规范、图书:《建筑施工组织设计规范》GB/T50502-2009《建筑施工脚手架实用手册》《建筑结构荷载规范》GB50009-2012《混凝土结构设计规范》GB50010-2010《钢结构设计规范》GB50017-2011《建筑施工安全检查标准》JGJ59-2011《建筑施工高处作业安全技术规范》JGJ80-91《建筑施工扣件式钢管脚手架安全技术规范》JGJ130-2011危险性较大的分部分项工程安全管理办法(建质[2009]87号文)二、工程概况工程基本情况北干街道施家桥社区城乡一体化安置房项目位于杭州市萧山区施家桥附近,南向为山阴路,西向紧靠工人河,东向毗邻综合楼地块及新白马小区,整个工地平面形状“L”形。总建筑面积133398㎡,地上总建筑面积为72371m2,地下建筑面积61027m2。本工程由8栋住宅和1栋会所及连体地下室组成,其中小高层6栋(1#、2#、3#、4#、5#、6#楼),地上11-13层,地下3层;高层2栋(7#、8#楼),地上23层、28层,地下3层,会所地上2层,整体地下室2层。地下室层高负二层3.9m,负一层4.0m,塔楼负二层3.4m,负一层3.0m,夹层3.0m,架空层5.0m,标准层2.9m。1#、3#楼地库顶板以上36.8m;2#、4#楼地库顶板以上42.6m,局部36.8m;5#、6#楼地库底板以上42.4m;深圳中海建筑有限公司悬挑脚手架专项方案3各责任主体名称建设单位杭州市萧山区人民政府北干街道办事处设计单位杭州天元设计研究院有限公司监理单位浙江建协工程咨询监理有限公司勘测单位浙江恒辉勘测设计有限公司施工单位深圳中海建筑有限公司三、总体筹划及施工部署(一)总体筹划本工程考虑到施工工期、质量、安全和合同要求,故在选择方案时,应充分考虑以下几点:1、架体的结构设计,力求做到结构要安全可靠,造价经济合理。2、在规定的条件下和规定的使用期限内,能够充分满足预期的安全性和耐久性。3、选用材料时,力求做到常见通用、可周转利用,便于保养维修。4、结构选型时,力求做到受力明确,构造措施到位,升降搭拆方便,便于检查验收;5、综合以上几点,脚手架的搭设,还必须符合JCJ59-2011等检查标准要求,要符合相关文明标化工地的有关标准。6、结合以上脚手架设计原则,同时结合本工程的实际情况,综合考虑了以往的施工经验,采用的脚手架方案为:本工程为普通型钢悬挑脚手架,1#、3#楼仅悬挑一段,从6层楼面~屋面,共20m;2#、4#楼悬挑二段,第一段从4层楼面~10层楼面,计17.4m;第二道悬挑为10层楼面~屋面,计14.2m;5#、6#楼悬挑二段,第一段从4层楼面~10层楼面,计17.4m;第二道悬挑为10层楼面~屋面,计14.2m;7、在悬挑脚手架计算时,将悬挑高度为20.0m,作为计算参考依据(具体布置见型钢平面布置图)。深圳中海建筑有限公司悬挑脚手架专项方案4(二)安全领导小组搭设过程中,因处在施工高峰期,各施工班组在交叉作业中,故应加强安全监控力度,现场设定若干名安全监控员。水平和垂直材料运输必须设置临时警戒区域,用红白三角小旗围栏。谨防非施工人员进入。同时成立以项目经理为组长的安全领导小组以加强现场安全防护工作,本小组机构组成、人员编制及责任分工如下:刘清松(项目负责人)——组长,负责协调指挥工作;马惠勇(技术负责人)——副组长,负责技术交底;赵明荣(现场经理)------副组长负责现场施工指挥王建国(安全总监)——组员,负责现场安全检查工作;各区域工长——组员,负责现场施工协调;王庆平(架子工班长)——组员,负责现场具体施工;深圳中海建筑有限公司悬挑脚手架专项方案5四、搭设流程及施工工艺普通型钢悬挑脚手架施工准备→放线定位→预埋U型钢筋拉环或锚固螺栓→悬挑架的支承结构安装→竖立杆→将纵向扫地杆与立杆扣接→安装横向扫地杆→安装纵向水平杆→安装横向水平杆→安装连墙件→安装剪刀撑→挂安全网→作业层铺脚手板和挡脚板。搭设参数表:脚手架排数双排大小横杆布置小横杆在上搭设高度(m)17.4m立杆型号Φ48×3.5立杆纵距(m)1.5立杆横距(m)0.90内排架距离墙长度0.3立杆步距(m)1.8连墙件布置方式二步三跨型钢悬挑长度(m)1.35锚固长度(m)3.35钢丝绳支撑道数1施工均布荷载(kN/m2)3同时施工层数2脚手板铺设层数2地区杭州市萧山基本风压(kN/m2)0.401、型钢水平悬挑梁(1)型钢水平悬挑梁必须保证有足够的锚固强度和截面抗屈曲能力,型钢水平悬挑梁的纵向间距与上部脚手架立杆的纵向间距相同,立杆直接支承在悬挑梁上。上部脚手架立杆与挑梁支承结构应有可靠固定的定位点,以确保上部架体的稳定,定位点离悬挑梁端部不小于100mm。通常采用在型钢上焊接150-200mm、外径φ40mm的钢管固定柱,立杆套座其外,并同时在立杆下部设置扫地杆。见下图深圳中海建筑有限公司悬挑脚手架专项方案6(2)型钢水平悬挑梁宜采用双轴对称截面的型钢。悬挑钢梁型号及锚固件应按设计确定,钢梁截面高度为160mm。悬挑梁尾端应在两处及以上固定于钢筋混凝土梁板结构上。锚固型钢悬挑梁的U型钢筋拉环或锚固螺栓直径为16㎜。用于锚固的U型钢筋拉环或螺栓应采用冷弯成型。U型钢筋拉环、锚固螺栓与型钢间隙应用钢楔或硬木楔楔紧。型钢悬挑梁外端设置钢丝绳与上一层建筑结构斜拉结。钢丝绳不参与悬挑钢梁受力计算;钢丝绳与建筑结构拉结的吊环应使用HPB235级钢筋,其直径为20㎜,吊环预埋锚固长度应符合现行国家标准《混凝土结构设计规范》GB50010中钢筋锚固的规定。(3)悬挑钢梁悬挑长度应按设计确定,固定段长度不应小于悬挑段长度的1.25倍。型钢悬挑梁固定端应采用2个(对)及以上U型钢筋拉环或锚固螺栓与建筑结构梁板固定,U型钢筋拉环或锚固螺栓应预埋至混凝土梁、板底层钢筋位置,并应与混凝土梁、板底层钢筋焊接或绑扎牢固,其锚固长度应符合现行国家标准《混凝土结构设计规范》GB50010中钢筋锚固的规定。(4)型钢悬挑梁与建筑结构采用螺栓角钢压板连接,角钢的规格为63mm×63mm×6mm。深圳中海建筑有限公司悬挑脚手架专项方案7型钢悬挑脚手架构造图1——钢丝绳或钢拉杆悬挑钢梁U型螺栓固定构造图1——木楔侧向楔紧;2——两根1.5m长直径18mmHRB335钢筋深圳中海建筑有限公司悬挑脚手架专项方案8悬挑钢梁穿墙构造图1——木楔楔紧悬挑钢梁楼面构造图2、立杆(1)脚手架立杆采用对接接长,立杆的对接扣件应交错布置,两根相邻立杆的接头不应设置在同步内,同步内隔一根立杆的两个相隔接头在高度方向错开的距离不宜小于500㎜;各接头中心至主节点的距离不宜大于步距的1/3。(2)脚手架立杆顶端栏杆宜高出女儿墙上端1m,宜高出檐口上端1.5m。3、脚手架纵向水平杆、横向水平杆、脚手板(1)纵向水平杆的构造应符合下列规定:1、纵向水平杆应设置在立杆内侧,单根杆长度不应小于3跨;2、纵向水平杆接长应采用对接扣件连接或搭接,并应符合下列规定:1)两根相邻纵向水平杆的接头不应设置在同步或同跨内;不同步或不同跨两个相邻接头在水平方向错开的距离不应小于500mm;各接头中心至最近主节点的距离不应大于纵距的1/3(见下图)深圳中海建筑有限公司悬挑脚手架专项方案9(a)接头不在同步内(立面)(b)接头不在同跨内(平面)纵向水平杆对接接头布置1——立杆;2——纵向水平杆;3——横向水平杆2)搭接长度不应小于1m,应等间距设置3个旋转扣件固定;端部扣件盖板边缘至搭接纵向水平杆杆端的距离不应小于100mm。3、使用竹串片脚手板时,纵向水平杆应作为横向水平杆的支座,用直角扣件固定在立杆上。铺竹串片脚手板时纵向水平杆的构造1——立杆;2——纵向水平杆;3——横向水平杆;4——竹串片脚手板;5——其它脚手板(2)横向水平杆的构造应符合下列规定:1、作业层上非主节点处的横向水平杆,宜根据支承脚手板的需要等间距设置,最大间距不应大于纵距的1/2;深圳中海建筑有限公司悬挑脚手架专项方案102、使用竹串片脚手板时,双排脚手架的横向水平杆两端均应采用直角扣件固定在纵向水平杆上。(三)主节点处必须设置一根横向水平杆,用直角扣件扣接且严禁拆除。(四)脚手板的设置应符合下列规定:1、作业层脚手板应铺满、铺稳、铺实;2、竹串片脚手板应设置在三根横向水平杆上。脚手板的铺设应采用对接平铺或搭接铺设。脚手板对接平铺时,接头处应设两根横向水平杆,脚手板外伸长度应取130mm~150mm,两块脚手板外伸长度的和不应大于300mm(图a);脚手板搭接铺设时,接头应支在横向水平杆上,搭接长度不应小于200mm,其伸出横向水平杆的长度不应小于100mm(图b)。(a)脚手板对接(b)脚手板搭接脚手板对接、搭接构造3、作业层端部脚手板探头长度应取150mm,其板的两端均应固定于支承杆件上。4、剪刀撑(一)悬挑脚手架应在外侧全立面连续设置剪刀撑。(二)剪刀撑的设置应符合下列规定:1、每道剪刀撑跨越立杆的根数不小于4跨,且不小于6m,斜杆与地面的倾角应在450~600之间;剪刀撑跨越立杆的最多根数剪刀撑斜杆与地面的倾角a450500600剪刀撑跨越立杆的最多根数n7652、剪刀撑斜杆的接长应采用搭接,搭接长度不小于1m,并采用不少于2个旋转扣件固定。端部扣件盖板的边缘至杆端距离不小于100mm。深圳中海建筑有限公司悬挑脚手架专项方案113、剪刀撑斜杆应用旋转扣件固定在与之相交的横向水平杆的伸出端或立杆上,旋转扣件中心线至主节点的距离不应大于150mm。5、连墙件(一)脚手架连墙件设置的位置、数量应按专项施工方案确定。(二)连墙件的布置应符合下列规定:1、应靠近主节点设置,偏离主节点的距离不应大于300mm;2、应从底层第一步纵向水平杆处开始设置,当该处设置有困难时

1 / 35
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功