XX高速公路XX段改扩建工程创优规划实施方案编制:审核:XX集团有限公司XX高速公路XX段改扩建工程TJ-3标项目经理部二〇一一年三月目录绪论·······················································································································3一、工程概况.................................................................................................................4工程简介···························································································4XXXX灵(豫陕界)段改扩建工程TJ-03标创优规划实施方案2自然条件···························································································4二、创优规划指导思想................................................................................................5三、创优规划管理目标................................................................................................6(一)创优质量目标:··········································································6(二)创优进度目标:··········································································6(三)创优文明施工目标:····································································6(四)创优廉政目标:··········································································6四、创优标准.................................................................................................................7五、工程创优质量保证体系........................................................................................8(一)工程质量创优计划·······································································8(二)质量创优保证体系的建立与运行·····················································8六、工程创优质量保证措施.......................................................................................11(一)创优质量管理措施·····································································11(二)工程创优技术保证措施·······························································14七、创优工期保证措施..............................................................................................21(一)施工计划保证工期·····································································21(二)施工资源上保证工期··································································21(三)技术上保证工期········································································21(四)环境上保证工期········································································22(五)安全生产上保证工期··································································23八、创优安全保通措施..............................................................................................26(一)项目主要管理人员的安全职责:···················································26(二)安全保障检查程序与保障措施······················································28九、文明施工创优保证措施......................................................................................31(一)组织机构·················································································31(二)制订健全的管理制度··································································31(三)管理措施·················································································32(四)现场管理·················································································32(五)健全管理资料···········································································33(六)开展文明施工竞赛·····································································34(七)加强教育培训工作·····································································34十、廉政工作创优保证措施......................................................................................35(一)相关各方的配合及协调···························································35(二)廉政工作保证措施··································································35(三)项目建设资金管理··································································37XXXX灵(豫陕界)段改扩建工程TJ-03标创优规划实施方案3绪论为认真深入贯彻省厅“创优座谈会”精神,落实“全省高速公路建设项目创国家优质工程动员会”的工作部署,明确理念是灵魂、设计是基础、管理是关键、施工是保证,深刻理解构建优质高速公路的内涵,准确把握高速公路建设管理创优的重要性,对此我们结合自身的实际情况,特制定本方案。XXXX灵(豫陕界)段改扩建工程TJ-03标创优规划实施方案4一.工程概况工程简介我单位承建的XX高速公路洛阳至三门峡(豫陕界)改扩建工程土建№3合同段,地处新安县境内,合同段起点为RK25+500,位于后峪村南新石公路东侧,延续北侧整体式加宽方式,向西跨越牌楼沟,设大桥通过,路线继续向西经过新安县城北,跨越省道S246,设新安互通式立交,作为新安县的出入口,再向西,跨越王庄水库,设大桥通过,经西庄、槐林北到达本合同段终点RK31+700。本合同段路线长6.2公里。本合同段共设大桥1343.4米/4座,互通式立交1处,分离式立交1座,天桥6座,通道5道、涵洞9道。填土方217.314千立方米,挖土方361.226千立方米,挖石方34.578千立方米。占用土地249.3991亩。自然条件项目所在地区洛阳、三门峡位北暖温带半干旱、半潮湿大陆性季风气候,冷暖适中,四季分明,雨热同期、干冷同季。项目区域为大陆性季风气候特征,四季分明,多年平均气温为13.9°C,春夏秋冬平均气温分别为12.3°C~15.2°C、22.9°C~26.6°C、12.3~14.9°C、0.5°C~2.0°C。四季时节分部,夏多冬少,春秋居中。区内一个月盛行偏北风,七月盛行偏南风。平均风速冬季1.1~3.1米/秒,春季2.4米/秒,夏季1.8米/秒,秋季1.7米/秒。全年以冬春风速较大,多大于2米/秒,夏秋风速较小,多小于2米/秒。XXXX灵(豫陕界)段改扩建工程TJ-03标创优规划实施方案5二.创优规划指导思想通过五个标准化管理,即:驻地建设标准化管理、试验室建设标准化管理、拌和站和预制场建设标准化管理、便道等施工现场保通、安全和文明施工标准化管理、项目创优施工工法标准化管理;实现总体工程优良、结构工程精品、附属工程协调、景观工程优美,确保省级优质工程一等奖,争创国家优质工程的总体建设目标。XXXX灵(豫陕界)段改扩建工程TJ-03标创优规划实施方案6三.创优规划管理目标按照XX的要求,将本合同段内工程建设成省内优质工程;建成“优质路、科技路、和谐路、生态路、廉洁路”,争创国家优质工程。(一)创优质量目标标段交工验收合格、竣工验收优良,创国家优质工程,其中实体质量分项工程合格率100%,优良率达到95%以上(即100—95质量目标)。(二)创优进度目标创造良好的施工环境,加强各方面的协调,进度满足上级部门的总体进度节点计划。(三)创优文明施工目标完善文明施工制度和措施,严格规范现场施工作业、狠抓文明施工管理,做到工完场清,注重环境保护,建设文明施工标准化工地。(四)创优廉政目标建设期内严禁出现违规、违纪、违法现象,打造阳光工程。XXXX灵(豫陕界)段改扩建工程TJ-03标创优规划实施方案7四.创优标准根据《国家优质工程审定与管理办法》、《公路交通优质工程评选办法》、《公路工程技术标准》、《公路工程质量评定标准》、《公路工程交(竣)工验收办法》等标准、规范、办法规定的要求。XXXX灵(豫陕界)段改扩建工程TJ-03标创优规划实施方案8五.工程创优质量保证体系(一)工程质量创优计划明确工程质量目标。根据工程质量目标及技术要求,确