1目录一、编制依据.............................................................31.1.****家园二期H楼结构施工图纸.......................................31.2.有关规范、规程.....................................................31.3.施工组织设计.......................................................41.4.参考手册...........................................................4二、工程概述.............................................................4三、脚手架搭设方案.......................................................43.1.搭设原则...........................................................43.2.外架子类别.........................................................43.3.外架子布置方案.....................................................43.4扣件式钢管脚手架的构造要求及技术措施................................53.5施工马道的搭设方法.................................................113.6施工卸料平台.......................................................123.7.卸荷方案..........................................................143.8.脚手架基底处理方案................................................15四、架子的搭设与拆除....................................................164.1.搭设前的准备......................................................164.2.架子搭设与拆除....................................................164.3.架子避雷设防......................................................174.4.架子的验收与管理..................................................18五、脚手架计算书........................................................195.1.立杆的整体稳定验算................................................195.2.型钢挑梁的计算....................................................22六、质量标准............................................................246.1构配件允许偏差(mm)...............................................246.2.脚手架搭设的允许偏差和检验方法....................................256.3.扣件拧紧要抽样检查数目及质量判定标准..............................25七、项目部脚手架管理机构及人员组成......................................267.1.架子管理领导小组..................................................2627.2.管理人员职责......................................................267.3劳动力配备.........................................................27八、材料计划............................................................278.1脚手架材料.........................................................278.2机具配备...........................................................28九、安全施工技术措施....................................................289.1.材质及其使用的安全技术措施........................................289.2.脚手架搭设的安全技术措施..........................................289.3.脚手架上施工作业的安全技术措施....................................289.4.脚手架拆除的安全技术措施..........................................29十、脚手架安全生产保证措施..............................................2910.1.建立安全生产保证措施.............................................2910.2.脚手架搭设质量的检查、验收.......................................3010.3.脚手架的使用规定.................................................3010.4.脚手架的安全防护和四口...........................................3110.5.电梯井洞口防护措施...............................................3210.6.结构临边防护措施.................................................3210.7.楼梯间防护措施...................................................32附图....................................................................32一、****家园二期工程外架搭设平面布置图................................32二、双排脚手架示意图..................................................32三、双排脚手架剖面图..................................................32四、安全通道正面图....................................................32五、安全通道侧面图一..................................................32六、安全通道侧面图二..................................................32七、挑架示意图........................................................323一、编制依据1.1.****家园二期H楼结构施工图纸.1.2.有关规范、规程序号规范、规程名称规范规程编号1建筑施工扣件式钢管脚手架安全技术规范JGJ130-20012建筑施工高处作业安全技术规范JGJ180-913建筑施工安全检查标准JGJ59-994***建筑工程施工安全操作规程5***脚手架施工及验收规程6建筑地基处理技术规范7***建设工程文明安全施工管理暂行规定8***建筑工程施工现场安全防护措施9直缝电焊钢管GB/T1379310钢管脚手架扣件GB/T70011建筑施工高处作业安全技术规范JGJ80—9112安全帽GB2811—8913安全带GB6095—8514密目式安全网GB16909—9715安全标志GB2894—9616特种作业人员安全技术考核管理规程GB503641.3.施工组织设计施组名称编制日期编制人****家园二期项目施工组织设计200*.*****1.4.参考手册序号规范、规程名称出版日期1建筑施工手册第四版(缩印版)2003.92简明施工计算手册1999.73实用建筑施工安全手册1999.74建筑施工脚手架实用手册1994.5二、工程概述****家园二期工程位于**区****路**号,原******机电厂内,由H、G楼两栋楼及地下车库、底商组成,总建筑面积为56074.27m2,其中H楼为地下2层,地上18层。檐高为59.2米。三、脚手架搭设方案3.1.搭设原则A、外架子要有足够的刚性和稳定性,保证施工期间在规定荷载作用和不利气候条件影响下不变形、不倾斜、确保安全;B、满足施工、构造简单、安全可靠、规整美观、搭拆便利、用料合理;3.2.外架子类别根据实际情况,综合考虑H楼工程基础施工及地上主体结构的施工作业进度和安全防护及满足有关作业要求,决定采用扣件式钢管外脚手架。本外架子工程的性质为:结构施工安全防护非承重脚手架。3.3.外架子布置方案本工程脚手架分两次搭设,第一段1-8层为落地式脚手架,搭设高度为28米。第二段9-18层为悬挑式脚手架,搭设高度为31米(采用18#工字钢做钢梁基础)。3.3.1立杆布置:第一段:A、按单立杆双排布置;5B、里皮立杆距结构外墙皮350㎜,C、里、外排架子的排距800㎜。第二段:A、按单立杆双排布置;B、里皮立杆距结构外墙皮350㎜C、里、外排架子的排距800㎜。3.3.2顺水杆、脚手板及安全防护布置A、步距1.5米。B、立杆纵向间距1.5米。C、脚手板于作业层相邻的上、下满铺,位于外侧纵向通长设置挡脚板,其高度不小于180㎜。D、位于外架子立杆里侧,用密目安全网满封。E、建筑物可设置2个安全出口,其他处用密目网满封。出入口设安全防护棚,具体尺寸为4米×4米×6米,也可根据现场实际情况更改,防护棚的搭设按照国家标准搭设。3.3.3与结构连接点布置:双排脚手架通过与主体结构的拉结来增强自身的稳定,以及防倾覆和抵抗风力,本工程具体做法如下:1、刚性连接:因为本工程为框架结构,所以在遇结构柱的地方用短管、扣件与结构柱拉牢。结构柱四周用短管抱牢,然后用两根长管连在双排外架的内外大横杆上,层层设置,其间距小于4米,脚手架相邻立杆和上下相邻水平杆件的接头位置,应相互错开,应置于不同的格构内,十字盖(剪刀撑)6根立杆为一组,于架子外立面布置连续到顶,斜杆与水平面的夹角应为45˚。2、柔性连接:联墙杆横向间距应在4.5-6m范围内,所以在两个结构柱之间的边梁上预埋Ф28钢筋,钢筋要倾斜预埋,偏向结构部分。所预埋位置应对准站杆,待混凝土凝固后,用Ф6钢筋拉牢,同时用钢管连在内外站杆上并顶在结构梁上,形