1目录A.工程概况.............................................................................................3B.施工准备.............................................................................................4B.l现场踏勘......................................................................................................4B.2临时工程.....................................................................................................4B.3技术准备...................................................................................................10C.总体施工部署...................................................................................11C.l项目管理机构............................................................................................11C.2施工力量的组织.......................................................................................11C.3施工任务划分...........................................................................................11C.4总体工期、质量目标...............................................................................12D.主要工程项目施工技术方案..........................................................13D.l特殊路基处理工程....................................................................................13D.2路基填筑工程...........................................................................................14D.3结构物工程...............................................................................................20D.4防护排水工程...........................................................................................23D.5桥梁工程...................................................................................................24D.6路面工程...................................................................................................38E.质量保证措施...................................................................................43G.冬、雨季的施工措施......................................................................46H.文明施工措施..................................................................................47I.科技推广应用....................................................................................482附录:......................................................................................................49附图J.3路基土方填筑施工工艺流程图.......................................................49附图J4圆管涵施工工艺流程图....................................................................50附图J.5箱型通道及箱涵施工工艺流程图...................................................51附图J.6钻孔灌注桩施工工艺流程...............................................................52附图J.7预制空心板梁施工工艺流程图.......................................................53附图J.8二灰土底基层施工工艺流程图.......................................................54附图J.9二灰碎石基层施工工艺流程图.......................................................55附图J.13用于本合同组织机构设置图.........................................................56附图J.14用于本合同质量保证体系控制图.................................................57附表J.16.1主要施工机具、设备一览表......................................................58附表J.16.2主要施工机械、设备一览表......................................................59附表J.16.3主要施工机械、设备一览表......................................................603A.工程概况A.l路线位置及简况xx高速公路A4标位于xx市xx县xx镇和xx乡境内,呈南北走向。起讫桩号为K9+450~K15+590。路线全长6.14km,自xx村起,途经xx村、xx村、xx村、xx砖瓦厂、xx村到xx村止。本标段共设置大中小桥及分离立交(上跨)各一座,桥梁全长431.2m;通道10道(其中利用桥孔3道),涵洞20道,渡槽1座;路基填方41.6万m3,挖方10.3万m3;30cm二灰土底基层14.85万m2,20cm二灰碎石基层6.5万m2,30cm二灰碎石基层7万m2。A.2沿线自然地理特征本标段挖方较少,基本上从耕地穿越,植被多,区域内地形复杂,河流、沟渠纵横交错,路线设计高程为8.38m~29.16m,路基最大挖深7.07m,最大填高8.27m。据设计文件反映,本标段内K10+356~K13+635段为长达3.28km的软土地段,段内地表覆盖厚度为l~3m的亚粘土,以下为厚达4~10m的淤泥质亚粘土,富含有机质,呈饱和态,地下水位距地表0.3-0.6m。A.3设计技术要求及主要工程量A.3.l设计技术要求该标段采用全封闭、全立交的双向四车道高速公路标准,路基宽度24.5m,设计行车速度100km/h,设计荷载为汽车一超20,挂车-120,抗震裂度7级。A.3.2主要工程量路基填方41.62万m3;除表土5730万m2;开挖淤泥15649m3;水塘回填碎石土60197m3;砂砾垫层25865m3;土工布89150m2,粉煤灰填筑30000m3。4φ1.5m园管涵649.15m/17道;倒虹吸91.5m/2道;3×3m箱涵67.04lm/2道;4×3米箱涵35.55m/l道;1×lm连续槽梁渡槽56.68m/l道;4×2.7m箱形通道129.74m/5道;6×3.5m箱形通道67.64m/2道。桥梁431.12m/4座。7.5#浆浆片石21780m3。30cm二灰土14.85万m2;20cm二灰碎石6.5万m2,30cm二灰碎石7万m2。A.4工程特点A.4.1本标段区域内道路、交通条件极差,主线被3条河自然划分为四段,地方道路均为单车道,且多处无路可行,材料进场需远距离绕行,并进行二次倒运。A.4.2沿线筑路土源极缺,需大量外借土方,远距离运输。A.4.2结构物设置较多,其中:大、中、小桥及立交各一座,涵洞20道,通道7道,渡槽1座,平均每公里5.33道,造成施工行车干扰,地方用水矛盾较多。B.施工准备B.l现场踏勘为了掌握施工现场情况,我公司组织了经验丰富的有关专业技术人员对施工现场沿线的地质、地貌、水文、气候、水电、通讯。交通等各种情况进行了详细的调查,并切实掌握了施工现场的材料来源和价格。B.2临时工程B.2.l施工用水本标段地处低洼地段,水源丰富,施工用水和机械用水就地取水解决,施5工人员用水在临近村庄取水。B.2.2施工用电沿线村庄多处,根据工程施工用电之需可沿线挂接地方公用电网,但以自发电为主。a、K10+129.6处,施工用电由xx村南面接到施工现场,距离很近,直接由抽水泵站接至工地用电量40KW。b、K10+685处,施工用电由附近村庄接至现场约300米,最大用电量20KW。c、K11+958.30处,施工用电由附近村庄接至现场约300米,最大用电量25KW。d、K12+801处,施工用电由主线右侧村庄接至现场,约100米,最大用电量40KW。e、K13+147.5处,施工用电由主线K13+300左侧村庄接至现场约150米,最大用电量40KW。f、K13+344处,施工用电由该通道左侧村庄接至现场30米,最大用电量50KW。g、K15+067.9处,施工用电由主线右侧二府村接至工地约80米,最大用电量35KW。h、生活用电,根据施工组织设计按施工人员租用民房,生活用电随租房自行解决。B.2.3施工便道本工程施工便道以满足施工所需而必须发生的数量,包括借土场至路基的6运土路,通道处施工临时便道和杭家村至百胜村方向的乡间机耕路整修共计3.89km。a、为了满足借土方需要,需修筑6处施工便道,总长度3.38km,路面宽度6米,共计填筑路基土方7230m3,不做路面结构层。b、机耕路整修,由于大量填料进入软基地段,原有道路不能满足运输的需要。拟定对善湖至百胜村间的2.5km机耕道路进行修整,对原有的3.5米宽的路面做铺撒2.5cm厚的碎石磨耗层。c、被交道工程改道,K13+147.5、K13+344二处通道施工,为保证交通正常进行,在工程开工前需改道修筑临时便道215米长,共计1075m2,拟填筑