ICS29.020国家电网公司企业标准Q/GDW380.1—2009电力用户用电信息采集系统管理规范第一部分:主站建设规范poweruserelectricenergydataacquisitionsystemmanagementspecificationPart1:masterstationconstruction2009-12-07发布2009-12-07实施国家电网公司发布Q/GDWQ/GDW380.1—2009I目次1总则··························································································································11.1编制目的·················································································································11.2编制依据·················································································································11.3适用范围·················································································································12职责分工····················································································································12.1国网公司···············································································································12.2网省公司···············································································································12.3地市公司···············································································································13建设管理····················································································································13.1建设内容···············································································································13.2主站设计···············································································································23.3设备管理···············································································································33.4建设实施···············································································································34验收··························································································································4编制说明7Q/GDW380.1—2009II前言按照坚强智能电网建设的总体要求,保证智能电网建设规范有序推进,实现电力用户用电信息采集系统建设“全覆盖、全采集、全预付费”的总体目标,规范统一用电信息采集系统及主站、采集终端、通信单元的功能配置、型式结构、性能指标、通信协议、安全认证、检验方法、建设及运行管理等。在国家电网公司“电力用户用电信息采集系统建设研究”项目研究成果基础上,国家电网公司营销部组织对国内外采集系统建设应用现状进行调研和分析,并充分结合通信技术、微处理器技术、制造工艺等技术的发展,全面梳理国内外用电信息采集系统相关技术标准,制定了《电力用户用电信息采集系统》系列标准。本部分是《电力用户用电信息采集系统》系列标准之一,本部分规定了用电信息采集系统主站建设管理相关职责及内容。本部分由国家电网公司营销部提出并负责解释;本部分由国家电网公司科技部归口;本部分主要起草单位:黑龙江省电力公司、江苏省电力公司、福建省电力公司、湖南省电力公司、重庆市电力公司本部分主要起草人:朱佳柯、杨晓源、周宗发、杜新纲、葛得辉、李新家、李建新、黄建军Q/GDW380.1—20091电力用户用电信息采集系统管理规范第一部分:主站建设规范1总则1.1编制目的为加强国家电网公司(以下简称国网公司)系统内电力用户用电信息采集系统主站(以下简称主站)建设的管理工作,规范主站建设过程,切实提高主站建设水平,特制定本部分。1.2编制依据《“SG186”工程营销业务应用建设管理办法》《电力用户用电信息采集系统建设管理办法》《电力用户用电信息采集系统主站软件设计规范》《电力用户用电信息采集系统检验技术规范》《电力用户用电信息采集系统安全防护技术规范》《电力企业计算机管理信息系统建设导则(试行)》1.3适用范围本部分适用于国网公司各区域电网公司、省(直辖市、自治区)电力公司(以下简称网省公司)及其所属各单位主站建设管理工作。2职责分工2.1国网公司(1)负责制定主站建设管理规范;(2)负责统一组织应用软件的设计、开发及验收工作;(3)负责对各网省公司主站建设进度及质量进行监督和考核;(4)负责对各网省公司应用软件需求差异和变更进行审查;(5)负责组织网省公司主站建设验收工作。2.2网省公司(1)负责制定主站建设相关管理制度;(2)负责确定主站部署方式;(3)负责组织主站硬件部署实施;(3)负责组织应用软件的部署;(4)负责组织采集系统数据网络设计、建设;(5)负责组织主站安全防护体系的设计、部署;(6)负责组织主站运行场地及监控场地设计和施工;(7)负责对主站建设进度及质量进行监督和考核;(8)负责主站建设的自验收工作;(9)负责组织建设实施人员和运行维护人员的培训。2.3地市公司(1)负责组织分布式主站硬件部署;(2)负责分布式应用软件的部署;(3)负责采集系统数据网络建设;(4)负责分布式主站安全防护体系部署;(5)负责组织分布式主站运行场地及监控场地设计和施工;3建设管理3.1建设内容Q/GDW380.1—20092主站建设内容主要包括主站硬件、主站软件、网络平台、主站环境的设计和实施。3.1.1主站硬件主站硬件包括计算机及存储设备、前置设备、其他辅助设备。(1)计算机及存储设备:如采集服务器、通讯服务器、应用服务器、数据库服务器及磁盘阵列、WEB服务器和工作站等设备。(2)前置设备:终端服务器和modem池等。(3)其他辅助设备:GPS时钟装置、网络打印机、密码机等其他辅助设备。3.1.2主站软件(1)系统及支撑软件:操作系统、数据库、WEB服务、备份和中间件等软件。(2)系统应用软件:电力用户用电信息采集系统应用软件,含系统接口。3.1.3网络平台(1)系统运行网络:主站系统运行网络以及支撑各级应用的网络。(2)网络及安全设备:交换机、路由器和正反向隔离装置、防火墙等设备。3.1.4主站环境(1)主站运行环境建设包括运行场地、防尘防静电、供配电、空调系统、电视监控、消防系统、安全系统(门禁)等。(2)主站监控环境建设包括监控场地、监控屏幕、值班休息室等。3.2主站设计3.2.1主站模式设计应根据应用规模和具体情况选择集中式或者分布式的部署模式。考虑因素如下:(1)采集系统主站应与“SG186”营销业务应用系统部署保持一致。(2)依据系统规模部署原则,小于500万用户的网省公司宜采用集中式部署模式。(3)地域面积过大的网省公司宜采用分布式部署模式。3.2.2硬件设计硬件设计应达到系统主站对性能、容量、可靠性及安全等方面的指标要求。3.2.2.1性能要求(1)90%界面切换响应时间≤3s,其余≤5s;(2)置主备通道自动切换时间<5s;(3)在线热备用双机自动切换及功能恢复的时间<30s;(4)算机远程网络通信中实时数据传送时间<5s;(5)在任意30分钟内,各服务器CPU的平均负荷率≤35%;(6)站年可用率≥99.5%。(7)单台通信机GPRS/CDMA连接数>30000台;(8)台通信机GPRS/CDMA并发数>600台。3.2.2.2容量要求(1)接入终端数>25万台;(2)系统数据在线存储≥3年。(3)工作站并发数>500台;(4)接入用户数>1000万户;(5)230MHz1200波特率每信道下终端数量>600台;3.2.2.3可靠性要求(1)主站年可用率≥99.5%;(2)主站各类设备的平均无故障时间(MTBF)≥3104h小时;(3)系统故障恢复时间≤2h;3.2.2.4安全要求数据库服务器、前置服务器必须采用高可用性技术,实现热备、容灾功能,具备负载均分,故障自动切换的功能。密码机应满足《电力用户用电信息采集系统安全防护技术规范》要求。3.2.3软件设计Q/GDW380.1—20093软件设计应满足《电力用户用电信息采集系统主站软件设计规范》要求,具备高可靠性、高安全性、良好的开放性、易扩展性和易维护性,需满足主站对功能、数据、接口、安全等方面的要求。3.2.3.1功能要求应符合《电力用户用电信息采集系统功能规范》要求。3.2.3.2数据要求主站的数据模型设计应当满足功能需求,并遵循采集系统设计规范的数据字典要求。主站的数据元设计应当满足国家相关标准规范关于数据元相应的分类规范和命名规则的要求。3.2.3.3软件要求软件设计技术路线应选用结构化设计和面向对象设计的方法。软件遵循基于J2EE的分布式多层架构体系,但考虑到采集系统的特点,在部分模块中,也可以根据实际情况采用其他技术。3.2.3.4接口要求与其他系统的接口方式可以采用文件、中间库、专有协议通信等方式。对于数据量大、实时性要求不高的数据,可以采用文件或中间库等方式。3.2.3.5安全要求软件设计应满足《电力用户用电信息采集系统安全防护技术规范》要求,软件设计中应考虑设置严格的权限体系、制定严密的访问控制策略、采用加密通信等技术措施,以确保采集系统的安全。3.2.4网络平台设计网络平台设计需满足主站对功能、容量、安全性等方面的要求。3.2.4.1功能要求网络平台设计应满足主站数据采集、控制等功能的运行要求,满足集中式、分布式部署模式的应用要求。3.2.4.2网络容量要求网络平台设计时应满足本系统终端接入数量、工作站并发数量对网络带宽容量要求。在主站运行中任意30分钟内,主站局域网的平均负荷率≤35%。3.2.4.3安全性要求网络平台设计时应满足以下安全性要求:(1)设计时应满足《电力二次系统安全防护规定》(电监会5号令)和