ChinaNationalChemicalEngineeringThirdConstructionCo.,Ltd中国化学工程第三建设有限公司目录1、编制依据.............................................................................................22、工程概况.............................................................................................23、施工现场勘测情况.............................................................................24、电源进线、配电箱/柜、线路的走向................................................25、负荷计算.............................................................................................36、供电设备、电路的选择.....................................................................57、防雷、接地装置的设计.....................................................................68、临时用电设备及配电线路的安装.....................................................69、临时用电设备及配电线路的使用、维护和拆除.............................710、安全用电技术措施和电器防火措施...............................................711、应急处理程序....................................................................................812、配电系统图...................................................................................102ChinaNationalChemicalEngineeringThirdConstructionCo.,Ltd中国化学工程第三建设有限公司1、编制依据1.1施工现场临时用电安全技术规范JGJ46-20051.2建筑工程施工现场供电安全规范GB50194-20141.3电气装置安装工程电缆线路施工及验收规范GB50168-2006;1.4电气装置安装工程接地装置施工及验收规范GB50169-20061.5电气装置安装工程电气设备交接试验标准GB50150-20061.6地方和业主的安全用电规定。1.7业主提供的现场电源资料。1.8现场临时用电设备负荷和配置资料。1.9现场勘测资料。1.10施工组织设计1.11其他相关依据。2、工程概况本项目是赛得利(九江)纤维有限公司二期年产16万吨差别化化学纤维项目——电厂土建工程。位于江西省湖口县金沙湾工业园区内,北邻长江,南边为湖口县新康达公司和九江钢铁厂,我单位承建原液区域土建技改及新建碱站、生活污水收集池、碱性废水收集池等工程。由于工程临时用电,特编制此临时用电安全施工方案。3、施工现场勘测情况供电电源:该工程的施工电源引自业主箱式变。现在下设1台一级配电箱,每个一级配电箱处做一组重复接地。施工现场采用TN—S三相五线制接零保护系统供电方式供电。4、电源进线、配电箱/柜、线路的走向4.1为了保证工地用电设备的可靠供电,工地施工电缆敷设采用部分埋地、架空等,不妨碍工地上繁忙的作业、交通。4.2电源引自箱式变。现场拟设1台一级配电箱,每台一级配电箱拟下设4台二级配电箱,下设三级配电箱。4.3现场供电电缆线路的铺设方式为架空和埋地,不得架设在脚手架上、及钢结构支架上。直埋电缆前,所凿孔槽其底部距地面不要小于0.5m,电缆上下应铺以沙土,其厚度不小于100mm,然后盖砖保护。4.4电缆铺设时,沿墙、沿物固定,若垂直或超过45°部分,每隔2m设一卡件。水平铺设的直3ChinaNationalChemicalEngineeringThirdConstructionCo.,Ltd中国化学工程第三建设有限公司线段,除两端各有一固定点外,中间应每隔1.5m有一固定点。固定件可灵活选用各种支架或卡件。严禁将电缆地面放置。电缆中间接头及终端头的制作中防止灰尘或土砂等杂物进入连接处,凡受潮的电缆端头不准接入中间接头或终端头。用电设备外壳应接专用保护零线。4.5配电系统示意图现场临时用电系统采用放射式配电方式,具体布置如下图:施工现场配电箱及电源电缆的位置和走向见附图5、负荷计算施工现场负荷计算及核算计算方法选择:根据施工现场的用电设备统计情况,各用电负荷计算(按负荷性质分组系数法)采用需要系数(Kx),将用电设备分组进行计算,计算公式如下:Pjs=Kx*∑Pe*暂载率-------有功功率Qjs=Pjs*tgφ-------无功功率Sj=Pj2+Qj2--------视在功率Ijs=Sjs/3*U*COSφ5.1一级配电箱用电设备及负荷:序号用电设备名称型号额定功率(KW)数量总功率P需用系数KxCosφTgφ负荷计算Pc有功功率(KW)Qc无功功率(KVA)Sc视在功率(kva)Pc=P*KxQc=Pc*TgSc=Pc/C4ChinaNationalChemicalEngineeringThirdConstructionCo.,Ltd中国化学工程第三建设有限公司φosφ1插入式振动器ZX50C2.510250.40.71.0210.0010.2014.292平板式振动器ZW52.5250.40.71.022.002.042.863钢筋调直切断机QJ40-15.52110.30.61.333.304.395.504钢筋切断机GW4044160.30.61.334.806.388.005钢筋弯曲机BX3-120-144160.30.51.734.808.309.606钢筋弯箍机GF20-202.224.40.30.51.731.322.282.647交流电焊机AG-30014101400.450.451.9663.00123.48140.008木工圆锯MB103A34120.40.61.334.806.388.009砂浆搅拌机UJ3253260.30.61.331.802.393.0010手提式电焊机6KW64240.450.451.9610.8021.1724.0011砂轮切割机Y132S-45.52110.40.714.404.406.2912电镐DG-10.921.80.40.71.020.720.731.0313空压机QCX5-307.517.50.750.80.755.634.227.0314照明201020010.80.7550.0037.5062.5015塔吊TC50371370.80.751.0529.631.0839.516套丝机7.517.50.60.651.14.54.956.917合计203.47269.87341.145.2具体计算5.2.1各种系数设定:施工现场总需要系数Kx=0.65;功率因素综合考虑COSφ=0.75;根据用电设备和现场的环境条件等确定一级配电箱,分配电箱和开关箱tgφ=1.17。一级配电箱电流计算:一级配电箱视在功率Sc=341.14(KVA)I=Kd*Sc*1000/(√3*380*Cosφ)=0.65*341.14*1000/(1.73*380*0.75)/2=224.9(A)根据计算结果,可选用电缆规格为:VV22-3×185+2*95mm2,载流量540A,满足要求。场临时供电方案的确定施工用电引自甲方提供的由市供电局接至工地的配电箱。现场采用TN-S三相五线制接零保护系5ChinaNationalChemicalEngineeringThirdConstructionCo.,Ltd中国化学工程第三建设有限公司统供电方式供电。在总配电箱处做一组重复接地。根据现场情况,现场线路主要采用架空的方式,部分部位埋地敷设。本工程临时供电配电箱设置为三级配电两级保护。设备实行“一机一闸一漏一箱”。本设计中临时供电方式选择放射式与树干式相结合的供电方式,根据1/2实际施工场地布置确定线路如下:N1回路由总配电箱至塔吊分配电箱;N2回路由总配电箱至搅拌机分配电箱;N3回路由总配电箱至钢筋加工棚钢筋弯曲机分配电箱;N4回路由总配电箱至钢筋加工棚钢筋切断机分配电箱;N5回路由总配电箱至闪光对焊机分配电箱;回路走向详见附图。各个回路干线型号的选用计算如下:N1回路P∑C=K∑(Pa1+Pa2)=0.9×(1×8+0.25×17)=11.45KWQ∑C=K∑(Pa1·tanα1+Pa2·tanα2)=0.9(8×0+0.25×1.02×17)=3.825KVarS∑C=(P∑C2+Q∑C2)1/2=(11.452+3.8252)1/2=12.072KVAI∑C=(S∑C×1000)/(31/2×UN)=18.342A故此回路干线选用VLV22-3×16+2×6架空敷设.N2回路Pc3=kd·Pa3=0.7×5.5=3.85KWQC3=Pc3·tanα3=3.85×1.17=4.5KVarSC3=(Pc32+QC32)1/2=(3.852+4.52)1/2=5.92KVAIC3=(SC3×1000)/(31/2×UN)=8.99A故此回路干线选用VLV22-3×2.5+1.5敷设.N3回路Pc4=kd·Pa4=0.65×3=1.95KWQC4=Pc4·tanα4=1.95×1.17=2.2815KVarPc5=kd·Pa5=0.65×3=1.95KW6ChinaNationalChemicalEngineeringThirdConstructionCo.,Ltd中国化学工程第三建设有限公司QC5=Pc5·tanα5=1.95×1.17=2.2815KVarP∑C=K∑(Pa4+Pa5)=0.9×(1.95+1.95)=3.9KWQ∑C=K∑(Pa4·tanα4+Pa5·tanα5)=0.9(2.2815×2)=4.563KVarS∑C=(P∑C2+Q∑C2)1/2=(3.92+4.5632)1/2=6KVAI∑C=(S∑C×1000)/(31/2×UN)=9.12A故此回路干线选用VLV22-3×4+2.5敷设.N4回路此回路的机械用电量同N3回路,故此回路线型选择同N3回路。N5回路Pc6=kd·Pa6=0.45×100=45KWQC6=Pc6·tanα6=45×1.98=89KVarSC6=(Pc62+QC62)1/2=(452+892)1/2=99.73KVAIC6=(SC6×1000)/(31/2×UN)=151.53A故此回路干线选用VLV22-3×16+6架空敷设.总电缆选择P总=11.45+3.85+3.9+45=64.5KWQ总=3.875+4.5+4.563+89=101.89KVarS总=12.072+5.92+6+99.73=123.722KVAI总=(SC6×1000)/(31/2×UN)=187.98A总干线选择VLV22-3×50+2×16埋地敷设.临时用电的保护方式现场临时供电系统的保护方式采用保护接零方式;重复接地:根据临时用电规范要求,在总配电箱及中间分配电箱、末端分配电箱均做一组重复接地,R地≦4Ω;防雷接地:塔吊、龙门架等高大设备做防雷接地,接地极利用建筑物防雷接地,在建筑物防雷接地安装时,引出端子备用。6、供电设备、电路的选择6