第1页,共12页目录一、编制说明及依据........................................................................................................................21、编制说明........................................................................................................................................22、编制依据........................................................................................................................................2二、基坑支护工程概况....................................................................................................................2三、换撑、拆撑施工安排.................................................................................................................31、换撑平面安排................................................................................................................................32、拆撑流程........................................................................................................................................33、拆撑方法........................................................................................................................................3四、换撑构件施工方法....................................................................................................................41、工艺流程........................................................................................................................................42、换撑施工........................................................................................................................................5五、拆除施工方法............................................................................................................................61、施工方法........................................................................................................................................62、施工说明........................................................................................................................................63、劳动力、机具需要量计划............................................................................................................6六、质量、安全保证措施.................................................................................................................61、安全文明施工保证措施................................................................................................................62、施工成品保护措施........................................................................................................................7七、应急救援预案............................................................................................................................81、应急救援组织与联络电话.......................................................................................................82、应急救援职责..........................................................................................................................83、突发事故发生应急处理方法...................................................................................................84、各种应急处理措施..................................................................................................................9八、监测方案..................................................................................................................................11第2页,共12页一、编制说明及依据1、编制说明本次拆除范围仅限于基坑东侧(6#楼南侧)阴角处的内支撑拆除。支撑体系冠梁不拆除。本方案主要针对拆换撑施工组织、拆撑条件、拆撑顺序、拆撑工艺及拆除措施进行说明。2、编制依据(1)《工程测量规范》(GB50026—2007)(2)《地下工程防水技术规范》(GB50108—2008)(3)《建筑边坡工程技术规范》(GB50330-2002)(4)《岩土工程勘察规范》(GB50021-2001)(5)《建筑结构荷载规范》GB50009-2001(2006年版)(6)《建筑施工安全检查标准》(JGJ59-99)(9)《中海师大地块工程场地岩土工程勘察报告》(10)《中海师大地块工程基坑支护施工图纸》(11)《中海师大地块工程主体施工图纸》(12)《中海师大地块工程施工组织设计》(13)施工现场实际状况二、基坑支护工程概况本工程基坑为不规则基坑,南北长约270m,东西长约206m。基坑支护采用支护桩与内支撑结合方式。支护桩采用直径600~900的钻孔灌注桩,依据开挖深度和保护要求的不同,采用不同桩长和桩径。灌注桩桩顶设置压顶梁,双排桩之间设连梁。基坑东侧(6#楼南侧)阴角处在-2.85米标高设置一道内支撑,内支撑水平支撑体系采用钢筋混凝土结构,包括主梁、次梁,内支撑竖向支撑体系采用格构钢柱,底部为直径700的钻孔灌注桩。第3页,共12页三、换撑、拆撑施工安排1、换撑平面安排换撑分为两步,一步是在浇筑基础底板,在浇筑完地下二层顶板时进行第二步换撑。两步换撑结构均采用加设混凝土换撑板结构传力带的方式,将支撑梁的应力转移到地下室结构体,各换撑板结构传力带随相邻外墙、底板混凝土结构施工。基础底板采用换撑板换撑,沿地下室底板周边全长采用300厚C20素砼浇筑并浇至支护桩边;地下二层标高处采用断点换撑板传力带进行换撑,换撑传力带为长2米,厚300mm的C20钢筋砼板,内配C10@200的双层双向钢筋网片,间隔1.5米(边到边的距离)设置一个,如下剖面图:2、拆撑流程内支撑必须待6#楼与周边后浇带范围之内的地下二层顶板混凝土浇筑完成,地下室防水施工完成,且换撑传力带施工完成并达到设计强带之后,再进行内支撑的拆除。3、拆撑方法第4页,共12页拆撑时采用对称拆除,人工用风镐对支撑梁挨个进行破除,破除顺序如下图所示:根据图纸尺寸,ZC-1底距地下二层顶板达1.75m。为保证施工安全、保护施工好的地下室二层顶板,在底板上铺设一层木模板,以保护混凝土大块掉落砸坏底板并有利于清理混凝土废料。要保证不能破坏在建的工程地下室结构(包括已浇砼和绑扎成型的钢筋、模板、模板支撑及地下防水层等),不破坏本工程的基坑支护桩、冠梁。每一段拆除完毕后,应立即进行垃圾清理,先用人工把垃圾清理至吊篮内,再用塔吊配合吊放到汽车上运出工地,做到随拆,随清。四、换撑构件施工方法1、工艺流程第5页,共12页序号工作内容施工简图1沿底板外侧整体浇注300厚C20素混凝土板,素砼板顶平基础底板顶,垫层与素砼板之间用黄沙填实2地下二层标高处采用断点换撑板传力带进行换撑,换撑传力带为长2米,厚300mm的C20钢筋砼板,间距1.5米2、换撑施工(1)换撑前必须做好测量点的引测、保护工作。原标记在支护桩上的标高点应及时引测到施工完成的楼板上。待到换撑全部完成,基坑位移变形稳定后方可将轴线、标高引测到基坑冠梁上。(2)在基底(地下室底板结构与支护桩之间)用300mm厚C30素砼填满到边,与桩有效固接,充分利用素砼的抗压强度,减少应力向换撑结构件传递,以进一步增加土体抗隆起的能力。(3)地下二层顶板处换撑传力带待地下二层顶板砼浇筑完成,地下室外墙第6页,共12页防水施工完成之后即可施工,浇筑300厚C20钢筋砼板,内配C10@200的双层双向钢筋网片。五、拆除施工方法1、施工方法1)、支撑梁破碎施工前,应在支撑梁下铺上旧模板,以对钢筋混凝土结构顶板采取防砸保护。2)、主要采用人工风镐破碎。采取从中间向端后退破碎方式,根据施工顺序一根一根的破碎拆除。待整跨支撑破碎后方可割除支撑梁的钢筋。3)、利用塔吊各处的钢筋、混凝土碎块、钢板吊运出施工现场。2、施工说明1)、由于旁边有居民楼,故安排施工时间定为早上6:30到18:00,晚上禁止破碎作业,但可进行清理作业。2)、施工现场必须要配备足