锚杆格梁防护首件工程施工方案

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx合同段锚杆框架梁首件工程施工方案1目录一、编制依据..................................................1二、工程概况..................................................1三、首件工程选取..............................................1四、施工工期安排..............................................2五、施工计划投入机械、劳动力..................................2六、施工组织机构..............................................2七、施工方案..................................................37.1施工工艺流程.............................................37.2施工方法.................................................37.2.1施工准备.............................................37.2.2搭设施工脚手架及施工平台.............................34.2.1脚手架施工流程、施工要点..............................37.2.3坡面修整.............................................87.2.4坡面锚孔施工.........................................87.2.5锚孔清孔、验收.......................................97.2.6锚杆安装.............................................97.2.7、锚杆注浆...........................................107.2.8、锚杆抗拔试验.......................................117.2.9、格梁开挖及浇筑.....................................117.2.10拆模及养生.........................................14xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx合同段锚杆框架梁首件工程施工方案27.3施工注意事项............................................147.4脚手架安拆控制措施......................................15八、施工材料及工艺质量控制...................................158.1材料要求................................................158.2设计及施工工艺要求......................................168.3锚孔质量要求............................................168.4钻孔施工要求............................................168.5锚杆制作、安装要求......................................178.6锚孔灌浆要求............................................188.7其他要求................................................18九、质量保证措施.............................................189.1组织措施................................................189.2建立质量体系,确保有效运行..............................209.3技术措施................................................21十、安全、文明施工措施.......................................2210.1安全保证体系...........................................2210.2安全、文明施工管理措施.................................24十一、环境保护...............................................24xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx合同段锚杆框架梁首件工程施工方案1锚杆格梁防护首件工程施工方案一、编制依据1、《xxxxxxxxxxxx高速公路扩能项目xxxxxxxxxxxx段施工招标文件》及施工图纸、工程量清单等。2、中华人民共和国交通运输部及有关部委颁发的现行有效公路工程施工技术规范、规程、验收标准及相关文件。3、xxxxx路(2015)81号《xxxx市公路水运工程安全生产强制性要求》、xxx路(2015)79号,《xx市公路工程质量控制强制性要求》。4、《xxxx市高速公路施工标准化管理指南》。5、《xxxxxx高速公路施工标准化指南》。6、《公路路基施工技术规范》(JTGF10-2006)。二、工程概况Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx三、首件工程选取xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx合同段锚杆框架梁首件工程施工方案2依据设计文件及现场条件xxxxxxxxx段左侧路堑一级边坡防护作为首件制,具有锚杆格梁施工的代表性。坡面从坡脚向xx开始到坡顶设x排方形横梁进行加固,锚杆格梁水平节点间距xx,竖向间距xx锚杆长x米,采用xxxxxxxxxxx。锚杆格梁截面尺寸为xxxxxxxxxxxxxx采用xxxxxxxxxx。锚xxxxxxxxxxxxxx内注M30xxx为φ22mmPVC管。本段锚杆格梁防护主要工程数量格梁:xxxxxxxxxxxxx,HRB400钢筋3xxxxxxxxxxxxxxxxm³。锚杆:xxxxxxxxxxxx钢筋(定位)12kg,x锁定)143.7kg,x泥注浆0.5m³。四、施工工期安排计划开工日期:2017年x月xx日,完工日期:2017年x月xx日,工期20天。五、施工计划投入机械、劳动力1、注浆机1台,空压机1台,钻机1台,拌合机1台。2、计划投入劳动力:12人。六、施工组织机构现场负责人:xxxx技术主管:xxx质检负责人:xxx测量负责人:xxx试验负责人:xx材料负责人:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx合同段锚杆框架梁首件工程施工方案3安全负责人:xxx主要施工人员:xxx七、施工方案7.1施工工艺流程施工准备→测量放样→搭设施工脚手架及施工平台→坡面修整→坡面锚孔施工→锚孔清孔、验收→验收合格→锚杆安装→锚孔注浆→锚杆抗拔试验→格梁开挖及浇筑→拆除脚手架→养护→验收。7.2施工方法7.2.1施工准备1、测量放样根据路堑设计开挖坡面,放出边坡平台位置,根据设计要求及现场地形情况,定出钻孔孔位,做出标记,并用纵横交叉线拉直,且将测量结果书面交底给现场施工人员。2、电力设备布设根据变压器位置,架设好电力主线路,在施工周围布置数量合适的电箱,保证电力正常供应。7.2.2搭设施工脚手架及施工平台7.2.3脚手架施工流程、施工要点1、边坡支护操作脚手架参数与选型。(1)钢管xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx合同段锚杆框架梁首件工程施工方案4采用外径φ48,壁厚3.0mm《直缝电焊钢管》或《低压流体输送用焊接钢管》中的3号普通钢管。(2)扣件扣件材质符合《钢管脚手架扣件》(GB15831)规定,扣件不能有裂纹、气孔、疏松、砂眼等铸造缺陷,扣件与钢管的贴合面接触好,扣件夹紧钢管时开口处最小距离小于5mm。(3)脚手板采用50mm厚木板(或者竹脚手板)作为施工脚手板,脚手板不得有开裂、腐朽,板面挠曲小于3/1000。(4)绑扎铁丝,采用8号镀锌铁丝。2、搭设方案选型(1)既有边坡采用沿坡面搭设双排脚手架,开挖后的边坡沿开挖后的坡面搭设双排脚手架。搭设尺寸为:立杆的纵距为1.5米,立杆的排距为0.9米,横杆步距为1.50米,立杆采用单立管;内排架距离坡面距离为0.50米;大横杆在上,小横杆在下,扫地杆距地面尺寸为40cm。(2)为保证脚手架搭设在稳固的基础上,现场边坡为石质边坡,搭设立杆时将坡面整平150*150的小平台,同时垫5cm厚木方,再立立杆。既有边坡的脚手架分层搭设。搭设方法节点见下图xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx合同段锚杆框架梁首件工程施工方案5图4-3高边坡支护脚手架搭设方案图4-4高边坡支护脚手架搭设平面方案xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx合同段锚杆框架梁首件工程施工方案63、脚手架方案计算(1)大横杆计算:大横杆按照三跨连续梁进行强度和挠度计算,大横杆在小横杆的上面。按照大横杆上面的脚手板和活荷载作为均布荷载计算大横杆的最大弯矩和变形表4-1(48*3钢管截面几何特性)外径壁厚t截面积惯性矩截面模量回转半径每米长质量(kg/m)Φ,dAIWimm(cm2)(cm4)(cm3)(cm)483.24.511.354.731.583.33表4-2(钢材的强度设计值与弹性模量(N/mm2))(2)计算书见后附件1、施工要点(1)脚手架搭设顺序如下:弹线、立杆定位→摆放扫地杆→竖立杆并与扫地杆扣紧→装扫地小横杆并与立杆和扫地杆扣紧→装第一步大横杆并与各立杆扣紧→安第一步小横杆→安第二步大横杆→安第二步小横杆→加设临时斜撑杆,上端与第二步大横杆扣紧→安第三、四步大横杆和小横杆xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx合同段锚杆框架梁首件工程施工方案7→安装连接件拉杆→接立杆→加设剪力撑→铺设脚手板,绑扎防护及档脚板、立挂安全网。(2)安装脚手架单位资质应符合要求;安装脚手架人员应经专业培训。杆件直径、型钢规格及材质应符合要求。(3)脚手架基础应坚固平实,应按规定设置剪刀撑,底部纵横连接,脚手板铺满,无探头板。脚手架高度在7m以上时,架体与结构物拉结。(4)脚手架荷载不超过规定,施工荷载堆放均匀,有积雪、杂物及时清理。(5)作业平台应满足承载力要求并搭

1 / 27
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功