有关隧道方面外文文献与翻译

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

Aconvection-conductionmodelforanalysisofthefreeze-thawconditionsinthesurroundingrockwallofatunnelinpermafrostregionsHEChunxiong(何春雄),(StateKeyLaboratoryofFrozenSoilEngineering,LanzhouInstituteofGlaciologyandGeocryology,ChineseAcademyofSciences,Lanzhou730000,China;DepartmentofAppliedMathematics,SouthChinaUniversityofTechnology,Guangzhou510640,China)WUZiwang(吴紫汪)andZHULinnan(朱林楠)(StatekeyLaboratoryofFrozenSoilEngineering,LanzhouInstituteofGlaciologyandGeocryologyChineseAcademyofSciences,Lanzhou730000,China)ReceivedFebruary8,1999AbstractBasedontheanalysesoffundamentalmeteorologicalandhydrogeologicalconditionsatthesiteofatunnelinthecoldregions,acombinedconvection-conductionmodelforairflowinthetunnelandtemperaturefieldinthesurroundinghasbeenconstructed.Usingthemodel,theairtemperaturedistributionintheXiluoqiNo.2Tunnelhasbeensimulatednumerically.Thesimulatedresultsareinagreementwiththedataobserved.Then,basedontheinsituconditionsofsirtemperature,atmosphericpressure,windforce,hydrogeologyandengineeringgeology,theair-temperaturerelationshipbetweenthetemperatureonthesurfaceofthetunnelwallandtheairtemperatureattheentryandexitofthetunnelhasbeenobtained,andthefreeze-thawconditionsattheDabanshanTunnelwhichisnowunderconstructionispredicted.Keywords:tunnelincoldregions,convectiveheatexchangeandconduction,freeze-thaw.AnumberofhighwayandrailwaytunnelshavebeenconstructedinthepermafrostregionsandtheirneighboringareasinChina.Sincethehydrologicalandthermalconditionschangedafteratunnelwasexcavated,thesurroundingwallrockmaterialsoftenfroze,thefrostheavingcauseddamagetothelinerlayersandseepingwaterfrozeintoicediamonds,whichseriouslyinterferedwiththecommunicationandtransportation.SimilarproblemsofthefreezingdamageinthetunnelsalsoappearedinothercountrieslikeRussia,NorwayandJapan.Henceitisurgenttopredictthefreeze-thawconditionsinthesurroundingrockmaterialsandprovideabasisforthedesign,constructionandmaintenanceofnewtunnelsincoldregions.Manytunnels,constructedincoldregionsortheirneighbouringareas,passthroughthepartbeneaththepermafrostbase.Afteratunnelisexcavated,theoriginalthermodynamicalconditionsinthesurroundingsareandthawdestroyedandreplacedmainlybytheairconnectionswithouttheheatradiation,theconditionsdeterminedprincipallybythetemperatureandvelocityofairflowinthetunnel,thecoefficientsofconvectiveheattransferonthetunnelwall,andthegeothermalheat.Inordertoanalyzeandpredictthefreezeandthawconditionsofthesurroundingwallrockofatunnel,presumingtheaxialvariationsofairflowtemperatureandthecoefficientsofconvectiveheattransfer,LunardinidiscussedthefreezeandthawconditionsbytheapproximateformulaeobtainedbySham-sundarinstudyoffreezingoutsideacirculartubewithaxialvariationsofcoolanttemperature.Wesimulatedthetemperatureconditionsonthesurfaceofatunnelwallvaryingsimilarlytotheperiodicchangesoftheoutsideairtemperature.Infact,thetemperaturesoftheairandthesurroundingwallrockmaterialaffecteachothersowecannotfindthetemperaturevariationsoftheairflowinadvance;furthermore,itisdifficulttoquantifythecoefficientofconvectiveheatexchangeatthesurfaceofthetunnelwall.Thereforeitisnotpracticabletodefinethetemperatureonthesurfaceofthetunnelwallaccordingtotheoutsideairtemperature.Inthispaper,wecombinetheairflowconvectiveheatex-changeandheatconductioninthesurroundingrockmaterialintoonemodel,andsimulatethefreeze-thawconditionsofthesurroundingrockmaterialbasedontheinsituconditionsofairtemperature,atmosphericpressure,windforceattheentryandexitofthetunnel,andtheconditionsofhydrogeologyandengineeringgeology.MathematicalmodelInordertoconstructanappropriatemodel,weneedtheinsitufundamentalconditionsasaba-sis.HereweusetheconditionsatthesceneoftheDabanshanTunnel.TheDabanshanTunnelislo-totedonthehighwayfromXiningtoZhangye,southoftheDatongRiver,atanelevationof3754.78-3801.23m,withalengthof1530mandanalignmentfromsouthwesttonortheast.Thetunnelrunsfromthesouthwesttothenortheast.Sincethemonthly-averageairtemperatureisbeneath0`}Cforeightmonthsatthetunnelsiteeachyearandtheconstructionwouldlastforseveralyears,thesurroundingrockmaterialswouldbecomecoolerduringtheconstruction.Weconcludethat,afterexcavation,thepatternofairflowwoulddependmainlyonthedominantwindspeedattheentryandexit,andtheeffectsofthetemperaturedifferencebetweentheinsideandoutsideofthetunnelwouldbeverysmall.Sincethedominantwinddirectionisnortheastatthetunnelsiteinwinter,theairflowinthetunnelwouldgofromtheexittotheentry.Eventhoughthedominantwindtrendissoutheastlyinsummer,consideringthepressuredifference,thetemperaturedifferenceandthetopographyoftheentryandexit,theairflowinthetunnelwouldalsobefromtheexittoentry.Additionally,sincethewindspeedatthetunnelsiteislow,wecouldconsiderthattheairflowwouldbeprincipallylaminar.Basedonthereasonsmentioned,wesimplifythetunneltoaroundtube,andconsiderthattheairflowandtemperaturearesymmetricalabouttheaxisofthetunnel,Ignoringtheinfluenceoftheairtemperatureonthespeedofairflow,weobtainthefollowingequation:wheret,x,rarethetime,axialandradialcoordinates;U,Vareaxialandradialwindspeeds;Tistemperature;pis

1 / 19
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功