750千伏哈密变电站工程监理工作总结批准:年月日审核:年月日编写:年月日新疆新能监理有限责任公司750千伏哈密变电站工程监理项目部2010年10月目次1工程概况·····················································································································12监理组织机构、监理人员和投入的监理设施········································································43监理合同履行情况·········································································································94施工过程中发现问题的处理方式·····················································································105监理工作成效·············································································································126工程大事记················································································································127监理工作体会·············································································································138经验教训及改进意见····································································································13750千伏哈密工程监理工作总结一、工程概况:哈密变电站二、三期(升压)扩建工程,是750kV乌鲁木齐—哈密—哈密输变电工程的组成部分,为构建新疆750kV目标网架的需要,实现新疆与西北电网联网,实现更大范围内资源优化配置奠定基础,该项目的建设对于加快新疆电网建设,促进新疆地区经济社会的发展具有十分重要作用。站址概况:新疆哈密市东北部约16.6公里,S303省道西侧。当地交通方便,可满足变电站施工及大件运输要求。750千伏哈密变电站(二、三期扩建)建设规模序号项目本期规模二期扩建三期扩建1主变压器(MVA)1×1500/2750kV出线2回2回3220kV出线//4750kV并联电抗器/2x420Mvar566kV并联电抗器4x90Mvar/工程参建单位:项目法人:新疆电力公司;设计单位:西北电力设计院;建设单位:新疆电力公司750工程建设公司;监理单位:新疆新能监理公司施工单位:甘肃送变电工程公司。二、监理组织机构、监理人员和投入的监理设施1、监理项目机构组织机构图新疆新能监理有限责任公司750kV哈密变电站工程组织机构图项目监理部总监理工程师陈德才总监代表综合管理组土建专业组电气专业组安全主管冯建新技经合同陈德才文档资料姚斌土建马旺平刘彦良一次徐新年二次郭金钟调试王斌土建刘兆刚尧海龙2、监理项目部基本设备配置监理项目部基本设备配置清单见表1。表1监理项目部基本设备配置清单序号名称配备数量一办公设备1计算机22打印机23复印机14传真机15数码相机2二常规检测设备和工具1经纬仪12测厚仪13混凝土强度回弹仪24力矩扳手2续表序号名称配备数量5建筑多功能检验仪16数字万用表27游标卡尺28钢卷尺59钢直尺410塞尺211磁性线锤212水平尺213望远镜43、监理项目部技术标准基本配置监理项目部技术标准基本配置清单见下表2表2监理项目部技术标准基本配置清单分类序号名称备注法律法规1《中华人民共和国建筑法》中华人民共和国主席令第91号2《中华人民共和国合同法》1999年颁布3《中华人民共和国招投标法》中华人民共和国主席令第21号4《中华人民共和国电力法》中华人民共和国主席令第60号5《中华人民共和国环境保护法》中华人民共和国主席令第23号6《建设项目环境保护条例》1998年颁布7《中华人民共和国安全生产法》中华人民共和国主席令第70号8《建设工程安全生产管理条例》中华人民共和国国务院令第393号9《生产安全事故报告和调查处理条例》中华人民共和国国务院令第493号10《中华人民共和国水土保持法》1991年颁布11《建设工程质量管理条例》中华人民共和国国务院令第279号12《建筑工程施工发包与承包计价管理办法》中华人民共和国建设部第107号令国家现行标准及文件1《建设工程监理规范》GB50319—20002《电力工程建设监理规范》DL/T5434—20093《国家重大建设项目文件归档要求与档案整理规范》DA/T28—20024《建设工程文件归档整理规范》GB/T50328—20015《建设工程施工现场供用电安全规范》GB50194—1993续表分类序号名称备注国家现行标准及文件6《建筑施工高处作业安全技术规范》JGJ80—19917《施工现场临时用电安全技术规范》JGJ46—20058《工程建设标准强制性条文(电力工程部分)》2006年版9《危险性较大的分部分项工程安全管理办法》建质〔2009〕87号10《普通混凝土用砂、石质量及检验方法标准》JGJ52—200611《混凝土结构工程施工质量验收规范》GB50204—200212《110kV及以上送变电工程启动及竣工验收规程》DL/T782—200113《建设工程价款结算试行办法》中华人民共和国建设部、财政部财建〔2004〕369号14《建筑施工模板安全技术规范》JGJ162—200815《电力建设安全工作规程(变电所部分)》DL5009.3—199716《建筑工程施工质量验收统一标准》GB50300—200117《地下工程防水技术规范》GB50108—200818《火灾自动报警系统施工及验收规范》GB50166—200719《通风与空调工程施工质量验收规范》GB50243—200220《建筑电气工程施工质量验收规范》GB50303—200221《电气装置安装工程质量检验及评定规程》DL/T5161.1~5161.17—200222《电气装置安装工程高压电器施工及验收规范》GBJ147—199023《电气装置安装工程母线装置施工及验收规范》GBJ149—199024《电气装置安装工程电力变压器、油浸电抗器、互感器施工及验收规范》GBJ148—199025《电气装置安装工程电气设备交接试验标准》GB50150—2006分类序号名称备注26《电气装置安装工程电缆线路施工及验收规范》GB50168—200627《电气装置安装工程接地装置施工及验收规程》GB50169—200628《电气装置安装工程盘、柜及二次回路接线施工及验收规范》GB50171—199229《电气装置安装工程蓄电池施工及验收规范》GB50172—199230《电气装置安装工程低压电器施工及验收规范》GB50254—199631《电气装置安装工程电力变流设备施工及验收规范》GB50255—199632《电气装置安装工程爆炸和火灾危险环境电气装置施工及验收规范》GB50257—199633《电力建设工程量清单计价规范》(变电工程)DL/T5341—2006国家电网公司规定及标准1《国家电网公司电力建设工程施工技术管理导则》国家电网工〔2003〕153号2《国家电网公司十八项电网重大反事故措施(试行)》国家电网生技〔2005〕400号3《关于印发〈国家电网公司输变电工程建设创优规划编制纲要〉等7个指导文件的通知》基建质量〔2007〕89号续表分类序号名称备注国家电网公司规定及标准4《国家电网公司电力建设工程施工安全监理管理办法》国家电网基建〔2007〕302号5《关于利用数码照片资料加强输变电工程安全质量过程控制的通知》国家电网基建安全〔2007〕25号6《电力建设安全健康环境评价管理办法(试行)》国家电网工〔2004〕488号7《电力建设安全健康与环境管理工作规定》国家电网工〔2003〕168号8《电力生产事故调查规程》国家电网安监〔2005〕145号分类序号名称备注9《国家电网公司输变电工程施工危险点辨识及预控措施》基建安全〔2005〕50号10《国家电网公司安全生产工作规定》国家电网总〔2003〕407号11《输变电工程建设标准强制性条文实施管理规程》国家电网科〔2009〕642号12《输变电工程安全文明施工标准》Q/GDW250—200913《关于印发〈国家电网公司建设工程施工分包安全管理规定〉的通知》国家电网基建〔2010〕174号14《国家电网公司输变电工程标准化施工作业手册》中国电力出版社出版15《关于印发〈国家电网公司加强建设工程分包安全监督若干重点要求〉的通知》国家电网安监〔2009〕998号16《国家电网公司电力安全工器具管理规定(试行)》国家电网安监〔2005〕516号17《国家电网公司输变电工程施工安全措施补助费、文明施工措施费管理规定(试行)》国家电网基建〔2005〕534号18《关于印发〈国家电网公司电力建设起重机械安全管理重点措施(试行)〉的通知》国家电网基建〔2008〕696号19《关于印发〈国家电网公司电力建设起重机械安全监督管理办法〉的通知》国家电网基建〔2008〕891号20《关于应用〈电力建设起重机械安装拆卸工艺指导手册〉的通知》基建安全〔2009〕233号21《国家电网公司十八项电网重大反事故措施(试行)》国家电网生技〔2005〕400号22《国家电网公司工程建设质量管理规定(试行)》2006年发布23《国家电网公司工程建设质量责任考核办法(试行)》2006年版24《国家电网公司输变电工程达标投产考核办法(2005年分类序号名称备注版)》25《国家电网公司输变电优质工程评选办法(2008年版)》26《国家电网公司输变电工程施工工艺示范手册》中国电力出版社出版27《国家电网公司输变电工程标准工艺示范光盘》中国电力出版社出版28《国家电网公司业主项目部标准化工作手册》29《国家电网公司施工项目部标准化工作手册》30《关于印发〈国家电网公司电网建设进度计划管理办法〉的通知》国家电网基建〔2010〕170号31《关于印发〈国家电网公司输变电工程安全质量管理流动红旗竞赛实施办法〉的通知》国家电网基建〔2010〕176号续表分类序号名称备注国家电网公司规定及标准32《关于印发〈国家电网公司电力建设工程施工质量监理管理办法〉的通知》国家电网基建〔2010〕166号33《关于印发〈国家电网公司输变电工程质量通病防治工作要求及技术措施〉的通知》国家电网基建〔2010〕19号34《关于印发〈国家电网公司输变电工程结算管理办法〉的通知》国家电网基建〔2010〕173号35《国家电网公司电力安全工作规程(变电部分)》国家电网安监〔2009〕664号36《关于印发〈变电工程落地式钢管脚手架搭设安全技术规范〉的通知》Q/GDW274—200937《110~1000kV变电(换流)站土建工程施工质量验收及评定规程》Q/GDW183—2008三、监理合同履行情况:1、建设监理目标:1.1质量控制目标:保证贯彻和顺利实施工程设计技术原则,满足国家施工验收规范和质量评定规程优良级标准的要求,确保工程零缺陷移交、达标投产和国家电网公司优质工程,争创国家优质工程。同时确保实现:变电站工程:土建部分:分项工程合格率100%,分部工程优良率100%,单位工程优良率100%,观感得分率≥95%;安装部分