S26公路东延伸(G1501公路—G15公路)新建工程S26-2、S26-2D小箱梁吊装专项施工方案1目录1.工程概况..........................................................31.1总体工程概况.................................................31.2二标段工程概况...............................................32.编制依据..........................................................43.小箱梁吊装工程概况................................................54.工程特点分析......................................................54.1施工重点难点.................................................54.2应对方案.....................................................55.工程目标.........................................................65.1工期目标.....................................................65.2质量目标.....................................................65.3安全目标.....................................................65.4文明施工目标.................................................65.5环保目标.....................................................66.小箱梁架设施工方案................................................66.1方案概述.....................................................66.2施工准备.....................................................66.2.1施工技术准备...........................................66.2.2施工物资准备...........................................66.2.3主要施工设备的准备.....................................76.2.4施工队伍准备...........................................96.2.5施工现场准备...........................................96.2.6施工辅助物料准备.......................................96.3小箱梁架设工艺流程..........................................106.4吊装小箱梁用钢丝绳验算......................................146.5地基承载力验算..............................................146.6临时支座承载力验算..........................................146.7小箱梁吊装顺序..............................................17S26公路东延伸(G1501公路—G15公路)新建工程S26-2、S26-2D小箱梁吊装专项施工方案27.施工进度与保证措施..............................................187.1施工进度计划...............................................187.2施工进度保障措施...........................................197.2.1施工组织..............................................197.2.2科学管理..............................................198.质量保证体系与措施..............................................209.安全保证体系及措施..............................................219.1安全生产组织体系...........................................219.2安全生产保证措施...........................................229.2.1建立安全责任制度......................................229.2.2建立安全管理规章制度及建立安全教育制度................229.2.3安全生产措施..........................................2310.文明施工保证体系及措施.........................................2710.1文明施工组织体系..........................................2710.2文明施工保证措施..........................................2710.2.1文明施工总体管理措施.................................2711.环境保护措施措施................................................2812.特殊季节施工...................................................2912.1雨季施工措施..............................................2912.2夏季施工措施..............................................2913.应急预案.......................................................2913.1应急事故领导小组..........................................2913.2突发事故的应急流程........................................2913.3安全用电、防火预防措施及应急预案..........................3013.4高空作业防坠落措施及预案..................................3113.5夏季中暑应急预案..........................................3213.6大型设备起重吊装事故应急预案..............................3313.7防台防汛应急预案..........................................33S26公路东延伸(G1501公路—G15公路)新建工程S26-2、S26-2D小箱梁吊装专项施工方案31.工程概况1.1总体工程概况本工程位于G2京沪高速公路与G50沪渝高速公路之间,西起G1501上海绕城高速公路东至G15沈海高速公路,途径青浦区香花桥街道、重固镇和华新镇。图1-1工程总体布置图主线高架为高速公路,西起G1501公路东至G15公路,桩号范围K-1+980~K10+624,全长10.644km,道路红线宽为60m,双向6车道加硬路肩;沿线立交4座:G1501立交、赵重立交、嘉松立交、G15立交。地面道路为二级公路,西起山周公路东至华徐公路,桩号范围K2+167.071~K10+227.43,全长8.06km,双向4快2慢,设计速度60km/h。1.2二标段工程概况本标段为S26-2标段,里程桩号为K2+407.545~K4+418.545,全长约2.011公里。主线高架为双向6车道高速公路,主要跨越赵重公路和规划的崧盈路,以及穿越河浜艾祁港、老通波塘和邓家角三处河流,为服务地区交通在赵重公路(二级道路)西侧设置单喇叭形赵重立交。本标段主要工作内容有:1.里程桩号为K2+407.545~K4+418.545的主线高架桥;2.道路红线范围内的河道(邓家角、艾祁港、老通波塘、洞口泾)的防汛墙工程、改河工程;3.赵重立交匝道(A、B、C、D、E),赵重立交A匝道以及赵重公路K0+000~K0+440联络段道路工程;S26公路东延伸(G1501公路—G15公路)新建工程S26-2、S26-2D小箱梁吊装专项施工方案44.艾祁港桥2座,洞口泾辅道桥1座,邓家角桥1座,老通波塘桥1座;5.K2+387~K4+400地面辅道土建工程。本标段总体平面布置图如下图所示。图1-2S26-2标平面位置图2.编制依据1、《S26公路东延伸新建工程施工图设计2标施工用图》2、《S26公路东延伸新建工程2标施工招投标文件》3、《S26公路东延伸新建工程2标施工招标文件补充文件》4、《S26公路东延伸新建工程S26-2标段施工合同》5、国家和交通部现行有关标准、规范、导则、规程、办法等,主要有:(1)《公路桥涵施工技术规范》(JTGTF50-2011)(2)《公路工程质量检验评定标准》(JTGF80-2004)(3)《公路工程施工安全技术规程》(JTJ076-95)(4)《工程测量规范》(GB50026—2007)(5)上海市地方标准《公路工程施工质量验收规范》(DGJ08-119-2005)(6)《建筑工程项目管理规范》GB/T50326-2001(7)《钢筋焊接及验收规程》(JGJ18-2003)(8)钢筋机械连接技术规程》(JGJ107-2010)S26公路东延伸(G1501公路—G15公路)新建工程S26-2、S26-2D小箱梁吊装专项施工方案56、施工安全管理规范、规程及规定(1)《建筑机械使用安全技术规程》(JGJ33-2001)(2)《施工现场临时用电安全技术规范》(JGJ46-2005)(3)《建筑施工安全检查标准》(JGJ59-2011)(4)当地建筑主管部门及电力行业关于建筑施工现场安全管理的文件及规定7、沪公投[2012]34号《公路施工标准化指南》3.小箱梁吊装工程概况本工程主线桥为双幅桥,下部结构采用Ф800钻孔灌注桩及Ф800PHC桩为基础,上部结构部分采用跨径25、28、30m简支预应力砼箱型连续梁,另外部分上部结构为现浇梁。上部结构单幅每孔安装4片箱梁,共需架设预制箱梁315片,其中边梁重量最大为120吨,主线桥面最高点与地面最大高差为18m左右。根据现场仔细勘察,及目前施工现场进度状况,本次架粱决定采用二台200t履带吊双机抬吊施工,因现场现浇梁施工进度影响,架梁开始后可能需要二台履带吊多次现场转场或重新进场,才能完成架设工作。4.工程特点分析4.1施工重点难点1、200t履带吊站位及运梁道路必须整平、压实,确保工作地面承载压力不小于18t/m2。2、单片小箱梁的重量、跨度及高度都很大,起吊难度