1第8部分:配网工程室内油浸式电力变压器安装作业指导书编码:DLBYQ-012目次1适用范围·····················································································································32编写依据·····················································································································33作业流程图··················································································································34安全风险辨析与预控······································································································35作业准备·····················································································································56作业方法·····················································································································77质量控制措施及检验标准································································································831适用范围1.1电压等级35kV及以下配网工程。1.2电气类别室内油浸变压器的安装。2编写依据表2编写依据序号引用资料名称1GBJ148—1990《电气装置安装工程电力变压器、油浸电抗器、互感器施工及验收规范》2DL/T5161.3—2002《电气装置安装工程质量检验及评定规程第3部分:电力变压器、油浸电抗器、互感器施工质量检验》3Q/CSG11105—2008《南方电网工程施工工艺控制规范》4《中国南方电网有限责任公司基建工程质量控制作业标准(WHS)》3作业流程图图3作业流程图4安全风险辨析与预控4.1室内油浸式电力变压器安装作业前,施工项目部根据该项目作业任务、施工条件,参照《电网建设施工安全基准风险指南》(下简称《指南》)开展针对性安全风险评估工作,形成该任务的风险分析表。4.2按《指南》中与室内油浸式电力变压器安装作业相关联的《电网建设安全施工作业票》(编码:DLBYQ-01-01/01),结合现场实际情况进行差异化分析,确定风险等级,现场技术员填写安全施工作业票,安全员审核,施工负责人签发。44.3施工负责人核对风险控制措施,并在日站班会上对全体作业人员进行安全交底,接受交底的作业人员负责将安全措施落实到各作业任务和步骤中。4.4安全施工作业票由施工负责人现场持有,工作内容、地点不变时可连续使用10天,超过10天须重新办理作业票,在工作完成后上交项目部保存备查。表4.1作业任务安全基准风险指南序号危害名称风险种类风险等级风险控制措施1钢丝绳套的安全系数选取不当打击中等风险按吊装重量选取安全系数匹配的钢丝绳套2变压器就位过程中失稳设备破损打击中等风险1.人力搬运小容量变压器,必须同肩、步调一致,互相呼应;2.较大容量变压器用铺设枕木、槽钢轨道就位时,移动时要有防止变压器滑出轨道和倾倒的措施,要设专人指挥,统一信号,用力均匀,速度要缓慢,互相协调3邻近带电设备变压器安装不满足安全距离触电特高的风险必须停电安装或按带电操作程序安装4起吊变压器没有设调整绳夹伤打击设备破损中等风险起吊变压器时应设2根或以上调整绳5吊装没有设专人指挥打击设备破损中等风险施工作业现场协调并设专人统一指挥6起重回转半径内站人打击设备破损中等风险起重机应按吊装工作半径就位,回转半径内严禁站人7起重设备支腿不稳打击设备破损高风险各支腿承点必须牢固可靠,在各支腿下应加枕木,土质松软的地方应加垫钢板8临近带电设备吊装作业,起重设备没有接地装置触电特高的风险确保起重设备的接地装置齐全、有效序号危害名称风险种类风险等级风险控制措施9变压器电机安装接线相序错误设备烧损高风险做好接线安装质量验收工作10变压器线缆连接螺栓扭矩不合格设备烧损中等风险变压器线缆连接螺栓扭矩必须符合标准要求11变压器中性线接地无效设备破损高风险变压器中性线需可靠接地,连接扭矩符合要求12变压器外壳接地无效触电中等风险变压器外壳需可靠接地接地13变压器运行前没有打开释放阀压片设备破损中等风险变压器运行前必须打开释放阀压片14电焊作业没有使用个人安全防护用具*灼(烫)伤触电高风险1.严格执行电焊作业规程;2.严格执行持证上岗制度;3.潮湿地方应使用绝缘垫;4.正确使用个人安全防护用具;5.电焊机外壳必须按规定接地15气焊作业没有使用个人安全防护用具灼(烫)伤中等风险1.严格执行气焊作业规程;2.严格执行持证上岗制度;3.正确使用个人安全防护用具16气焊用具使用不规范爆炸中等风险1.严格执行气焊作业规程;2.严格执行持证上岗制度5序号危害名称风险种类风险等级风险控制措施17施工用电不规范*触电高风险1.加强使用前及使用过程中的检查,保护零线与工作零线不得混接,开关箱漏电保护器灵敏可靠,漏电保护装置参数应匹配;2.用电管理和检修维护必须规范,并由专业电工进行,配电箱必须上锁,并采取防雨措施;3.工作间断时切断电源;4.必须使用符合要求的线缆,并做好防破损措施18施工区域防暑降温措施不足中暑低风险1.避开炎热时间段作业;2.配置太阳伞,配置排风扇,人员轮流休息;3.及时补充水分19现场动火作业使用无效消防器材设备破损中等风险1.严格执行动火工作票制度;2.现场配备数量充足、合格的消防器材20不按要求使用梯子坠落中等风险1.使用合格梯子;2.设专人扶梯;3.摆放位置正确21没有拉闸切断电源,更换刃具触电割伤中等风险更换刃具,必须拉闸切断电源22不按规范使用转动工具绞伤中等风险按操作规范使用转动工具,合理使用个人安全防护用品使用转动工具时严禁戴手套5作业准备5.1作业前施工条件表5.1作业前施工条件序号项目内容确认人说明1任务单根据本单位实际设置内容(包含本项工作)本工序施工负责人经审批2图纸设备变更单、设计图纸本工序施工负责人经审批3预算材料表含主、辅材本工序施工负责人经审批4施工方案施工措施、安全技术交底(项目部级)本工序施工负责人经审批5相关证照根据需要办理涉及进入工作场所的手续、证件本工序施工负责人有效66确认上一道工序检查合格(1)变压器室内的屋顶、楼板施工完毕,不得渗漏;室内地面的基层施工完毕,混凝土基础及构架达到允许安装的强度,焊接构件的质量符合要求;预埋件应牢固及符合设计要求。(2)变压器容量大于或等于100kVA时,接地电阻不宜大于4,当并列运行的变压器等电力设备总容量不超过100kVA时,接地电阻不宜大于10。(3)检查变压器基础:基础的中心距离及高度的误差不应大于10mm、水平误差小于5mm;贮油设施或挡油设施应满足设计要求,贮油池内宜铺设厚度不小于250mm的卵石层,其卵石直径宜为50~81mm,卵石干净、无杂物;排油管内径不应小于100mm。(4)每台油量为100kg及以上的三相变压器,应设在单独的变压器室内。可燃油油浸变压器外廓与变压器室墙壁和门的最小净距,应符合下表的规定。变压器容量kVA1000及以下1250及以上变压器外廓与后壁、侧壁净距600800变压器外廓与门净距8001000本工序施工负责人合格5.2人员、主要工器具及仪器仪表配置表5.2人员、主要工器具及仪器仪表配置序号项目内容说明1人员配置施工阶段建议工作人数现场施工负责人现场施工质安员技术岗位必须持有与作业工种相应、有效的上岗证,辅助工不得从事电气设备安装等专业工作本体安装技术工人5+辅助工311一次接线技术工人3附件安装技术工人3+辅助工32施工内容相对应的设备材料油浸变压器、高低压支架、铜排、热缩绝缘管、高低压绝缘护套、低压电缆(或插接式母线)、拉爆螺钉、枕木等(1)核对材料、变压器及附件的到位及数量;核对变压器技术参数,各项参数符合设计要求。(2)检查变压器的外观应无锈蚀及机械损伤,油位正常,油箱无渗漏现象、无受潮,瓷套光滑无裂纹、缺损。(3)收集变压器出厂合格证明文件及技术资料3施工内容相对应的器具、机械及工器具仪表工器具:冲击钻、冲孔机、水平仪、焊接工具、钢锹、钢管、千斤顶、手锤、弯巴机、压接钳、煤气瓶、煤气枪、扳手、梯子、尺子等。机械:根据变压器型号、规格,准备车辆、起重机具或铲车及吊装机具、手拉葫芦等(1)根据现场情况使用的工器具、机械符合相关要求。(2)钢丝绳荷重,需保证其安全系数,根据起重机具臂角度确定荷载,不得超载使用74完成开工程序工作负责人向项目负责人报开工,并由项目负责人完成向监理单位开工报审手续施工准备完成可报开工,当施工准备不足时,上报该项目负责人协调解决6作业方法表6作业方法序号项目内容说明1作业前工作(1)现场施工负责人向进入本施工范围的所有工作人员明确交待本次施工设备状态、作业内容、作业范围、进度要求、特殊项目施工要求、作业标准、安全注意事项、危险点及控制措施、危害环境的相应预防控制措施、人员分工,并签署(班组级)安全技术交底表。(2)工作负责人负责办理相关的工作许可手续,开工前做好现场施工防护围蔽警示措施,夜间施工的,须有足够的照明。(3)现场施工负责人组织检查确认进入本施工范围的所有工作人员正确使用劳保用品和着装,并带领施工作业人员进入作业现场按安规规定佩戴统一的安全帽,统一佩戴有个人照片的作业证(或胸卡证),穿着统一的工作服2开始主要作业现场施工负责人发出许可开工命令3本体安装作业程序(1)变压器在装卸的过程中,设专人负责统一指挥,指挥人员发出的指挥信号必须清晰、准确。(2)采用起重机具装卸时,起重机具的支撑腿必须稳固,受力均匀。应准确使用变压器油箱顶盖的吊环,吊钩应对准变压器重心,吊挂钢丝绳间的夹角不得大于60°。起吊时必须试吊,防止钢索碰损变压器瓷套管。起吊过程中,在吊臂及吊物下方严禁任何人员通过或逗留,吊起的设备不得在空中长时间停留。(3)变压器就位采取人力搬运和铺设枕木、槽钢轨道就位等方法。1)小容量变压器(50kVA及以下),可采取人力搬运方法,必须同肩、步调一致,互相呼应。2)较大容量变压器,可采取铺设枕木、槽钢轨道就位,枕木、槽钢轨道铺设必须平稳牢固,在变压器两侧和后部以铁钎子或木棒撬变压器的底盘,沿槽钢轨道向基础方向移动到位,或在变压器室里墙根部设牵引钩,用钢丝绳将变压器底部绑扎牢固,用手拉葫芦将变压器从槽钢轨道上由门外向室内牵引到位。在就位移动时不宜过快,不得发生碰撞及不应有严重的冲击和震荡,以免损坏绝缘构件。就位移动时要有防止变压器滑出轨道和倾倒的措施,做好变压器基础保护工作,要设专人指挥,统一信号,用力均匀,速度要缓慢,互相协调。(4)装有滚轮的变压器在就位后,应将滚轮用能拆卸的制动装置加以固定或将滚轮拆卸。(5)油浸变压器应安装稳固,底部用枕木垫起离地,必要时加装防震胶垫,以降低噪声;用垫片对变压器的水平度、垂直度进行调整。(6)变压器安装后,套管表面应光洁,不应有裂纹、破损等现象;套管压线螺栓等部件应齐全,且安装牢固;储油柜油位正常,外壳干净。(7)装有气体继电器的变压器顶盖,沿气体继电器的气流方向有1.0%~1.5%的升高坡度;储油柜阀门必须处于开启状态;气体继电器安装前应经检验合格现场施工负责