项目名称施工现场防台防洪防汛风应急预案项目名称施工现场防台防洪防汛风应急预案公司名称项目名称项目名称施工现场防台防洪防汛风应急预案2目录一.编制目的....................................................................................................................................3二.编制依据....................................................................................................................................3三.工程概况....................................................................................................................................4四.工作任务....................................................................................................................................41.加强工地各种设施安全管理......................................................................................................42.加强工地应急处置准备管理......................................................................................................63.注意及时收听收看气象灾害预警信息......................................................................................6五.指导思想及救援原则................................................................................................................61.救援指导思想..............................................................................................................................62.救援原则......................................................................................................................................7六.适用范围....................................................................................................................................7七.应急物资....................................................................................................................................7八.组织机构和职责........................................................................................................................81.组织领导......................................................................................................................................82.各专业应急救援组职责分工......................................................................................................8九.防风、防洪、防汛应急准备....................................................................................................91.紧急联络电话..............................................................................................................................92.应急物资的准备、维护、保养................................................................................................103.防风、防洪、防汛预防措施....................................................................................................10十.防风、防洪、防汛应急救援..................................................................................................111.应急响应....................................................................................................................................112.应急救援....................................................................................................................................11十一.事故后期处理......................................................................................................................12十二.培训与演练..........................................................................................................................12项目汛期值班表..............................................................................................错误!未定义书签。项目名称施工现场防台防洪防汛风应急预案3一.编制目的为保证本项目施工现场在雨季施工时防台风防洪防汛事故的处理快速有序地进行,在台风期间一旦施工现场出现暴雨、大风等险情发生事故后能及时有效地进行应急救援工作,防止因应急行动组织不力或现场救援工作的无序和混乱而延误事故的应急救援,最大限度地避免或降低人员伤亡和财产损失,本着“预防为主、统一指挥、分工明确、及时救援”的原则,结合我项目施工实际情况,特制订项目施工现场雨季施工防风防洪防汛事故的应急救援预案。二.编制依据1.《中华人民共和国建筑法》;2.《中华人民共和国安全生产法》;3.《建设工程安全全生产管理条例》;4.《建筑施工安全检查标准》;5.《建筑边坡工程技术规范》GB50330-2002;6.《中华人民共和国防洪法》;7.《中华人民共和国防汛条例》;8.国家和省、市有关水土保持的法律法规;9.《广东省防汛防旱防风工作的若干规定》;10.《广东省防台风应急预案》;11.《国家防办防御台风预案编制导则》;12.《深圳市人民政府办公厅关于继续做好近期强降雨天气防范应对工作的紧急通知》深府办函【2014】69号;13.《深圳市住房和建设局关于继续做好近期强降雨天气防范应对工作的紧急通知》。14.《深圳市南山区突发公共事件应急预案》项目名称施工现场防台防洪防汛风应急预案4三.工程概况××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××针对本工程周围环境及综合调查,结合国家及深圳市有关法律、法规制定本工程的防台风防汛应急预案。四.工作任务根据建筑工地的实际情况,组织开展对临时设施等以及其它工程、设施、设备的排查,全面加强建筑工地防汛防台风安全管理,并做好应急处置准备工作。各现场应急指挥部要实行严格的汛前检查、汛期监控、汛后复查的检查监控制度。安排专人分工负责,对现场的临建设施、基坑设施、起重运输机械、脚手架、施工用电等项目进行重点检查和监控。1.加强工地各种设施安全管理①.临建设施临建设施包括:员工驻地、办公用房、加工场地、材料库房、围墙等。监控人的责任:全面检查临建设施的安全状况,如有裂缝、倾斜、变形现象,及时采取加固、翻修,达不到要求的必须拆除重建,防止坍塌事故发生;台风天气必须安排专人进行不间断巡查;随时观察风雨对临建设施的影响、损害情况,及其基坑、脚手架、起重设项目名称施工现场防台防洪防汛风应急预案5备等可能对临建造成的破坏,如有危险立即将临建内人员转移到安全地方。对工地出现堵水或内涝的,及时采取措施处理;全面检查各个平台的排水设施,对发现堵或漏的管道及时采取措施处理保证排水畅通,确保水不流入地铁列检库区;对临时设施位于地质条件复杂或可能造成地质灾害地段的,及时报告国土、水务部门、市住房和建设局、地铁集团等单位,落实防范措施;对可能出现安全问题的施工现场要及时撤离人员,防范地面塌陷等地质灾害发生。②.基坑设施:基坑设施包括:钢便桥路基边坡防护工程、售楼中心桩基施工、土石方开挖等。监控人的责任:随时观察基坑边坡有无出现裂缝、滚石、坍塌等现象,基坑支护有无变型,沿线路基边坡毗临建筑物、结构物的变化情况;对毗邻道路、建筑物、临建设施的基坑设施要重点检查监护;如若出现重大安全隐患立即对危险区域进行封闭,撤离人员停止施工,设置安全警示标志,派专人值班,严禁无关人员接近危险区域,并立即上报;汛期过后对基坑设施进行全面检查,无安全隐患后,方可施工。③.起重运输机械起重运输机械包括:塔吊、起重吊车、施工升降机等。监控人的责任:六级以上大风天气应立即停止作业;重点监控起重运输机械基础的稳定情况、排水情况、塔吊电梯附臂是否按照规定安装、基坑对起重运输机械的影响情况。④.脚手架工程脚手架工程主要有:落地脚手架、悬挑脚手架、支模架等。监控人的责任:六级以上大风天气,禁止脚手架施工作业;重点监控脚手架悬挑工字钢卸荷绳扣紧与否情况、U型螺栓拧紧与否、钢笆片绑紧与否情况、架体上垃圾清理与否情况、安全网挂紧与否、基础沉降情况、排水情况,确