输变电工程建设标准强制性条文实施管理规程1附件7输电施工

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

ICS29.240Q/GDW国家电网公司企业标准Q/GDW248.7—2008输变电工程建设标准强制性条文实施管理规程第7部分:输电线路工程施工ManagementregulationforenforcingthecompulsoryprovisionsofstandardsoftransformersubstationengineeringconstructionPart7:Constructionofpowertransmissionlines2009-06-30发布2009-06-30实施国家电网公司发布Q/GDW248.7—2008目次前言·········································································································································································3661范围·····································································································································································3672规范性引用文件················································································································································3673强制性条文执行计划········································································································································3674施工准备····························································································································································3685基础工程施工·····················································································································································3695.1基础工程开工前···············································································································································3695.2基础工程施工···················································································································································3706杆塔工程施工·····················································································································································3726.1杆塔工程开工前················································································································································3726.2杆塔工程施工···················································································································································3727架线工程施工·····················································································································································3737.1架线工程开工前················································································································································3737.2架线工程施Q/GDW248.7—2008工···················································································································································3737.335kV及以下架空电力线路架线工程施工············································································································3768接地工程施工·····················································································································································3769竣工投产·····························································································································································378附录A(规范性附录)杆塔施工强制性条文引用表···························································································379前言根据国家电网公司国家电网科[2008]928号《关于下达国家电网公司2008年度标准制修订计划(第一批)的通知》,制定本规程。本规程贯彻“强制性条文、强制性执行”的指导思想。《输变电工程建设质量强制性条文实施管理规程》是一套系列标准,用于输变电工程建设中强制性条文的执行、检查及记录。该规程由如下8部分组成:——第1部分:通则——第2部分:变电站建筑工程设计——第3部分:变电站建筑工程施工Q/GDW248.7—2008——第4部分:变电站电气工程设计——第5部分:变电站电气工程施工——第6部分:输电线路工程设计——第7部分:输电线路工程施工——第8部分:输变电工程施工安全本部分是该规程中的第7部分:输电线路工程施工。对输电线路工程参建各责任主体单位有关施工标准强制性条文的执行、检查及记录做了统一规定,尽可能地避免在执行中发生偏差、遗漏和违反强制性条文的情况,有利于输电线路工程施工水平及工程实体质量的提高。本规程由国家电网公司基建部提出。本规程由国家电网公司科技部归口。本规程由国家电网公司基建部负责解释。本部分主编单位:山西省电力建设工程质量监督中心站。本部分参编单位:山西锦通工程项目管理咨询有限公司。本部分主要起草人:郝志刚、王巳英、刘晓忠、王曦晨、王天宝、芦笛、李瑞芳。输变电工程建设标准强制性条文实施管理规程第7部分:输电线路工程施工1范围1.01为加强国家电网公司输变电工程建设过程控制,强化质量责任,规范质量行为,确保输变电工程建设严格执行强制性条文,保证工程质量及电网安全,根据法律、法规及相关规定,制定本规程。1.02本规程适用于国家电网公司输变电工程建设的质量管理,各建设、勘察、设计、施工、调试、监理、试验和检测等单位均应遵照执行。1.03本规程所称强制性条文,包括国家现行有效的工程建设标准强制性条文(以下简称强制性条文),且适用于最新版本,应及时更新替代、补充新增内容。2规范性引用文件下列文件中的条款通过本规程的引用而成为本规程的条款。其最新版本适用于本规程。GB50168—2006电气装置安装工程电缆线路施工及验收规范Q/GDW248.7—2008GB50169—2006电气装置安装工程接地装置施工及验收规范GB50173-1992电气装置安装工程35kV及以下架空电力线路施工及验收规范GB50233—2005110kV~500kV架空送电线路施工及验收规范3强制性条文执行计划3.0.1工程项目开工前,施工单位应编制《输电线路工程施工强制性条文执行计划表》,报监理单位审核后,建设单位批准执行,保证工程项目执行强制性条文的完整性。3.0.2输电线路工程施工质量强制性条文执行计划见表3.0.2。表3.0.2输电线路工程施工强制性条文执行计划表工程序号工程名称责任单位执行表号单位分部分项施工单位监理单位建设单位1***至*****kV输电线路工程(或施工标段)○○●1土石方工程○●表4.0.21.1路径复测●○表4.0.21.2拉线基础坑分坑●○表4.0.21.3掏挖式基础坑分坑●○表4.0.21.4普通基础坑分坑●○表4.0.21.5施工基面及电气开方●○表4.0.22基础工程○●表5.1.2、表5.2.22.1现浇铁塔基础●○表5.1.2、表5.2.22.2现浇拉线塔基础●○表5.1.2、表5.2.22.3预制装配式基础●○表5.1.2、表5.2.2表3.0.2输电线路工程施工强制性条文执行计划表工程序号工程名称责任单位执行表号单位分部分项施工单位监理单位建设单位122.4混凝土杆预制基础(三盘)●○表5.1.2、表5.2.22.5岩石、掏挖基础●○表5.1.2、表5.2.22.6桩式基础(1)灌注桩基础●○表5.1.2、表5.2.2(2)贯入桩基础●○表5.1.2、表5.2.22.7其他特殊基础●○表5.1.2、表5.2.23杆塔工程○●表6.1.2、表6.2.23.1自立式铁塔组立●○表6.1.2、表6.2.23.2拉线铁塔组立●○表6.1.2、表6.2.23.3混凝土杆组立●○表6.1.2、表6.2.23.4烟囱塔组立●○表6.1.2、表6.2.2Q/GDW248.7—20084架线工程○●表7.1.2、表7.2.2、表7.3.24.1导地线展放●○表7.1.2、表7.2.24.2导地线连接管●○表7.1.2、表7.2.24.3紧线●○表7.1.2、表7.2.24.4附件安装●○表7.1.2、表7.2.2、表7.3.25接地工程○●表8.0.25.1表面式接地装置●○表8.0.25.2深埋式接地装置●○表8.0.

1 / 18
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功