黄淮学院E区3#高层教师公寓基坑开挖及支护施工方案1目录第1章编制说明............................................................31.1编制目的..............................................................31.2编制依据..............................................................31.3编制原则..............................................................31.4编制范围..............................................................4第2章工程概况............................................................42.1深基坑术语............................................................42.2工程概况..............................................................4第3章施工准备............................................................53.1组织机构..............................................................53.2施工机械及人员安排....................................................53.3主要工程数量及主要材料................................................6第4章总体施工部署.........................................................64.1总体目标..............................................................64.2施工总体安排..........................................................74.3基坑边坡防护措施......................................................7第5章施工方法............................................................85.1基坑施工顺序..........................................................85.2基坑降水施工..........................................................85.5土方开挖..............................................................8第6章危险源辨识及防范措施...............................................116.1基坑施工危险源辨识...................................................116.2基坑危险源防范措施...................................................11第7章施工监控测量.......................................................127.1监测目的.............................................................127.2监测管理机构与控制流程...............................................127.3基坑监测的主要项目...................................................127.4主要监测项目实施方法.................................................12黄淮学院E区3#高层教师公寓基坑开挖及支护施工方案27.5监测数据的处理及反馈.................................................137.6监测注意事项.........................................................147.7监测报表.............................................................147.8监测数据控制标准和预警值.............................................14第8章施工环境保护措施...................................................148.1扬尘以及大气污染控制措施.............................................148.2预防地表水和地下水污染的措施.........................................158.3城市生态环境控制措施.................................................15第9章施工保证措施.......................................................169.1质量保证措施.........................................................169.2安全保证措施.........................................................169.3职业健康保证措施.....................................................179.4工期保证措施.........................................................179.5雨季防汛、防洪措施...................................................17第10章基坑工程防坍塌应急预案............................................1910.1深基坑施工突发事故灾害及原因分析....................................1910.2应急处置基本原则....................................................1910.3组织机构及职责......................................................2010.4预防措施、救援措施与预警............................................2010.5事故报告程序........................................................2310.6应急预案管理........................................................2310.7事故调查与处理......................................................23黄淮学院E区3#高层教师公寓基坑开挖及支护施工方案3第1章编制说明1.1编制目的通过编制严谨、周密、科学及详细的施工方案,确保单项工程在施工过程中的质量、安全和进度能满足规范、验标和合同要求,从而最终实现企业的经营管理方针。1.2编制依据1、招标文件及相关资料;2、地质详勘资料;3、我单位现有的技术水平、施工管理水平和机械设备配备能力;4、施工图;5、适用于本工程的标准、规范、规程:(1)(混凝土结构工程施工质量验收规范(GB50204—2005);(2)建筑基坑支护技术规程(JGJ120—99);(3)建筑工程施工质量验收统一标准(GB50300—2001);(4)施工现场临时用电安全技术规范(JGJ46—2005);(5)建设工程施工现场供用电安全规范(GB50194—93);(6)建筑拆除工程安全技术规范(JGJ147—2004);(7)建筑机械使用安全技术规程(JGJ33—2001);(8)建筑基坑工程监测技术规范(GB50497-2009);(9)相关国家、部、河南省、驻马店市颁发的其他规范和标准。以上技术标准如有更新版本的,遵照新版本执行。1.3编制原则(1)以优质、高效、安全、低耗为目标;(2)认真贯彻国家工程建设的法律、法规、规程、方针和政策;(3)严格执行工程建设程序,坚持合理的施工程序、施工顺序和施工工艺;(4)优先选用先进施工技术,科学确定施工方案;认真编制各项实施计划,严格控制工程质量、工程进度、工程成本和安全文明施工;(5)充分利用施工机械和设备,提高施工机械化、自动化程度,改善劳动条件,提高生产效率;(6)坚持“安全第一,预防为主,综合治理”原则,确保安全生产和文明施工;认真做黄淮学院E区3#高层教师公寓基坑开挖及支护施工方案4好生态环境和历史文物保护,严防建筑噪音、振动、粉尘和垃圾污染。1.4编制范围本方案的施工内容分为三项:第一项为围护结构的施工,包括水泥喷浆;第二项为降水井的施工(包括场区内外排水系统);第三项为基坑开挖。本次开挖支护范围为平方米。开挖过程中对基坑周围采用水泥喷浆进行支护,喷护前必须把桩间的泥土、杂物等清除,并冲洗干净。第2章工程概况2.1深基坑术语(1)建筑基坑:为进行建筑物(包括构造物)基础与地下室的施工所开挖的地面以下空间(见建筑基坑支护技术规程第2章术语);(2)深基坑定义:是指开挖深度超过5m的基坑(槽)或深度未超过5m但地质情况和周围环境较复杂的基坑(槽)(见《建筑工程预防坍塌事故若干规定》第七条);(3)重大危险源:深基坑(槽)施工为重大危险源;(4)基坑安全等级:依据设计图纸的规定本基坑安全等级为三级。2.2工程概况1.本工程为黄淮学院E区3#高层教师公寓。建设单位为黄淮学院。2.本工程为一类高层居住建筑,耐火等级为一级,屋面防水等级为二级,地下室耐火等级为一级,地下室防水等级为一级。设计合理使用年限50年。民用建筑工程设计等级为一级。3.本工程地下1层,地上30层,建筑高度为87.450m,室内外高差0.450m,地下室层高3.900m,一层至三十层层高为2.900m。4.本工程总建筑面积为25519.62m2,基底占地面积为865.85m2,地下建筑面积为835.20m2,地上建筑面积为24684.42m2。5.本工程结构形式为钢筋混凝土剪力墙结构,筏板基础,抗震设防烈度为6度,抗震等级为三级。本工程开挖深度为±0.000以下6.920米。本场区勘察深度范围内地层属第四系更新统地层,根据其物理力学性质及工程地质特性将本场地地基土自上而下分为8个工程地质单元层,最上层为杂填土,层底埋深1.00-2.60m,平均1.28m,以下各层均为粉质粘土,6、水文地质条件根据地质勘察报告,场地地下水类型为赋存于第四系冲洪积层中的孔隙潜水和上层滞水,地下水补给主要为大气降水和地下径流,地下水位受气候条件影响较大,随季节而变黄淮学院E区3#高层教