陕西德源府谷三道沟煤矿地面建筑副平硐井口房工程施工组织设计陕西煤炭建设公司-1-目录编制依据及编制说明···············································································-1-第一章工程概况·················································································-2-第二章项目管理机构及其职责·······························································-5-第三章施工准备工作计划·····································································-8-第四章施工部署及现场平面布置···························································-11-第五章施工方案··············································································-15-第六章季节性施工措施·······································································-24-第七章工期目标及保证措施··································································-26-第八章工程质量管理目标及保证措施·····················································-28-第九章施工安全管理目标及保证安全措施··············································-34-第十章文明施工目标及保证措施···························································-37-第十一章新工艺、新技术、新材料·························································-37-第十二章劳动力组织··········································································-38-第十三章主要材料需用量计划·································································-40-第十四章主要机械设备配置计·······························································-41-陕西德源府谷三道沟煤矿地面建筑副平硐井口房工程施工组织设计陕西煤炭建设公司-1-陕西德源府谷三道沟煤矿地面建筑施工组织设计地面爆破材料库场地工程编制依据:一、陕西德源府谷三道沟煤矿地面建筑工程FMISG0904-03标“地面爆破材料库场地”设计图纸及采用的标准图集二、陕西德源府谷三道沟煤矿地面建筑工程FMISG0904-03标“地面爆破材料库场地”招标文件三、建筑工程施工质量验收统一标准(GB50300-2001)四、现行施工验收规范、规程及技术标准五、《建设工程质量管理条例》、《建设工程安全生产管理条例》六、本企业的质量手册、程序文件及管理制度七、现场勘察资料及本工程的施工条件八、同类工程的施工经验和相关技术经济资料编制说明:一、本施工组织设计作为该工程项目施工的综合性指导文件,是施工技术人员在熟悉图纸和工程特点的基础上,为了确保本工程施工工期、质量、安全等目标的实现,经过认真策划、集思广益编制而成,是本企业施工管理技术水平的充分体现。二、本施工组织设计着重于施工总体部署、项目管理机构、施工资源配置、现场平面布置、施工方案和方法、施工进度以及质量和安全控制等陕西德源府谷三道沟煤矿地面建筑副平硐井口房工程施工组织设计陕西煤炭建设公司-2-方面的阐述。三、编制副导思想是在保证施工质量、进度及安全生产的前提下,对各分部分项工程和检验批制定有效可行的技术措施、质量控制和通病综合防治措施,并积极采用新工艺、新技术,确保创建市级文明工地,为陕西德源府谷三道沟煤矿建设增光添彩。第一章工程概况工程名称:陕西德源府谷三道沟煤矿地面建筑“地面爆破材料库场地”工程地点:陕西省府谷县庙沟门镇建设单位:陕西德源府谷能源有限公司设计单位:中煤国际工程集团北京华宇工程有限公司一、工程项目简介该工程为陕西德源府谷三道沟煤矿地面建筑工程3#标“地面爆破材料库场地”,位于三道沟煤矿场区内。基本情况及要求如下:陕西德源府谷能源有限公司三道沟煤矿建设工程,建筑面积8500m²。抗震设防烈度为6度,设计基本加速度为0.05g,设计地震分组为第二组。边坡范围内地层上部以④层黄土为主,局部分布③层黄土状粉土,下部为⑤层砂岩。现场实体边坡总坡率为1:0.5-1:1.0,高度一般为5m-12m。施工内容:1.场地大门:根据火药库性质钢板平开围墙大门。大门为手动启闭,门洞宽度4200mm,门扇标志高度2300mm。门框采用L50*5角钢。钢板与门框、陕西德源府谷三道沟煤矿地面建筑副平硐井口房工程施工组织设计陕西煤炭建设公司-3-骨架连接采用焊接。2.门柱:门柱高2560mm,门柱断面600mm*600mm。砖柱采用75号砖、25号混合砂浆。基础埋深1500mm,基础材料同主体,用50号水泥砂浆砌筑,450mm厚3:7灰土垫层,400mm厚C20素混凝土承台基础,围墙基础压实度不低于0.9。3.场地围墙:火药库场地选用实心砖围墙。墙高2200mm,墙厚240mm,垛距4000mm。每隔20米在砖垛处设伸缩蜂。每两个开间留120mm*120mm流水洞一个,洞壁抹20mm厚1:2水泥砂浆掺3%防水粉.砖墙、砖柱均用非粘土砖,砖标号MU≥7.5,水泥砂浆标号≥M5。清水砖墙为1:1水泥砂浆勾缝。砖围墙基础为450mm厚3:7灰土垫层,400mm厚C20素混凝土承台基础,基础埋深1500mm。围墙基础压实度不低于0.9。防潮层做在室外地坪以上60mm,做法为20mm厚1:2水泥砂浆掺5%防水粉。4.门柱、围墙为水泥砂浆抹灰,刷外墙涂料。内墙面为清水墙。5.护坡顶围墙:护坡顶围墙采用刺1825-1镀锌刺丝网围墙。围墙高度1800mm,柱距2500mm,预制150mm*150mm混凝土方柱。基础为300mm3:7灰土,300mm厚C20素混凝土承台。6.浆砌片石护裙施工:基础埋深1.5m,出地坪高3m。护裙每10m设置沉降缝,缝宽2∼3cm,缝内可采用塑料泡沫板填塞。浆砌片石护裙底部预留一排泄水孔,泄水孔10cm*10cm,间距3m。泄水孔后设15cm反滤层,高宽均为50cm。排水系统均采用M10水泥砂浆,强度不小于MU25块石砌筑。若沟底为强风化岩或土质,则需素土夯实后做5cm厚M7.5砂浆垫层。7.防暴土堤:回填素土并层层夯实,高6m,周圈护坡砌筑2m高浆砌护陕西德源府谷三道沟煤矿地面建筑副平硐井口房工程施工组织设计陕西煤炭建设公司-4-裙。8.场区道路:路基碾压,压实系数0.93(环刀取样)300厚3:7灰土垫层220厚C30混凝土。9.水泥场地:基础素土夯实,压实系数0.90。200厚3:7灰土220厚C20混凝土随打随抹,上撒1:1水泥砂子压实赶光。10.避雷针:现场安装四台独立避雷针高度分别为15m两台、17m一台、19m一台。独立避雷针选用GH系列环形钢管杆避雷针。工程量统计共计土方开挖1865m³,石方开挖2650m³,土方回填2270m³,浆砌片石护裙525m,。排水沟总长479m。砖围墙167m。镀锌刺丝网围墙278m。场区道路148m。水泥场地485m²二、施工条件及投标者采购的材料要求本工程位于陕西省府谷县庙沟门镇附近山顶,为典型黄土高原地貌,属温带大陆性干旱---半干旱季风气候,冬季(12月、1月、2月)气候严寒。进矿上山临时道路及煤矿场平已经基本完成,能满足施工要求;10KV电源已经接到场地;工业及生活用水已接入场地,正式供水约。施工现场条件基本满足施工需要。投标者采购的材料要求:钢材:国家大型钢厂生产的优质钢材。水泥:国家大型企业生产的转窑水泥,必须符合设计要求。其他设备、材料原则上在满足设计文件要求的基础上按优质产品采购。采购应执行项目法人制定的有关管理程序与制度。陕西德源府谷三道沟煤矿地面建筑副平硐井口房工程施工组织设计陕西煤炭建设公司-5-第二章项目管理机构及其职责一、公司简介陕西煤炭建设公司隶属于陕西煤业化工集团,为全国500家最大建筑施工企业之一。公司成立于1954年,是以矿山建设、土木建筑、机电设备安装三类工程施工为主营业务,兼营煤炭生产、水泥生产和机械制造的综合性施工企业。公司拥有国家建设部核准的矿山工程施工总承包一级资质,以及房屋建筑、机电设备安装、公路工程、市政工程、铁路工程等专业施工资质。现有职工7614人,其中各类专业技术人员1317人。公司资产总额64892万元,拥有各类施工生产设备4980台。公司成立50多年来,重点承担了铜川、蒲白、澄台、韩城和黄陵矿区的建设任务,先后转战20多个省、市、自治区,累计承建大中型建设项目278个,单项工程6966项;获优良工程727项,全部免检项目18项。公司2001年通过了ISO9002国际质量认证体系认证。陕西德源府谷三道沟煤矿地面建筑副平硐井口房工程施工组织设计陕西煤炭建设公司-6-项目部主要管理人员简况表项目部下设工程组、质安组、材料组、经营组四个管理部门,十一个班,即:钢筋班、木工班、砼班、瓦工班、抹灰班、架工班、电工班、油漆班、水暖班、吊装班、普工班。职务姓名职称执业或职业资格证明已承担工程证书名称级别证号专业项目数主要项目名称项目经理丁和平工程师职称证工程师0027052土建约20王村矿井玉华矿井黄陵矿区1#井项目经理证二级7104200022飞龙小区9#、10#住宅楼技术负责任继荣工程师职称证中级021267土建6彬长矿区大佛寺矿井招待所、办公楼施工员张新军施工员施工员证0607413土建12彬长矿区大佛寺矿井招待所、办公楼质量员王新平质量员质量员证000772土建5彬长矿区大佛寺矿井招待所、办公楼安全员刘锡军安全员安全员证040003土建6彬长矿区大佛寺矿井招待所、办公楼陕西德源府谷三道沟煤矿地面建筑副平硐井口房工程施工组织设计陕西煤炭建设公司-7-项目部施工管理机构图工程部经营部材料部质安部技术负责任继荣施工工长张新军钢筋班电工班防水班抹灰班装修班吊装班普工班木工班砼班瓦工班架工班项目经理丁和平陕西德源府谷三道沟煤矿地面建筑副平硐井口房工程施工组织设计陕西煤炭建设公司-8-第三章施工准备工作计划开工前施工准备工作的目的是为项目顺利开工和施工创造必要的条件。这一阶段的实施重点是:制定项目管理目标,进行图纸会审,批准施工预算、施工组织设计和项目质量计划,落实劳动力和各种材料设备、施工机具计划并及时组织进场,完成准备工作,确保如期开工。本工程施工准备工作包括技术准备、物资准备、劳动组织准备、施工现场准备和其他准备。一、技术准备技术准备是施工准备的核心,具体有如下内容:⒈熟悉、审查设计图纸熟悉、审查设计图纸的程序通常分为自审阶段、会审阶段和现场签证等三个阶段。①审查设计图纸是否完整、齐全,以及设计图纸和资料是否符合国家有关工程建设的设计、施工方面的方针政策;②审查设计图纸与设计说明是否一致,以及设计图纸各组成部分之间有无矛盾和错误;③审查建筑总平面图与构图在几何尺寸、坐标、标高、说明等方面是否一致,技术要求是否正确;④明确拟建工程的结构形式和特点,审查设计图纸中的工程复杂、施工难度大和技术要求高的