1234567891011122326303030303030303030153155底板抽放巷岩准裸皮带炮掘11.21600160080100130901301305151机巷煤回锚支皮带综掘12.2400400180180403121机巷煤回锚棚皮带综掘12.2100010001801801801003134北风巷煤回锚棚皮带综掘12.23901001003212(II)切眼煤回锚支自溜炮掘5.012012030903151机巷煤回锚棚皮带综掘12.2130081060180180180180303155回风联络巷岩准裸皮带炮掘11.2200801305151切眼煤回锚支自溜炮掘6.01201203151风巷煤回锚棚皮带综掘12.21000100018018080561南探巷煤准锚棚矿车炮掘11.0402020312S底抽巷岩准裸皮带炮掘9.212001200601001301301301301301301301303122进风石门岩准锚喷皮带炮掘12.31001003124回风石门岩准锚喷皮带炮掘12.3100803124进风石门岩准裸矿车炮掘10.0808080312大巷岩开裸矿车炮掘9.015003001001203124进风石门揭煤及煤巷软/煤准锚喷矿车炮掘10.0507050队计35002600组计1700180014001200支护方式运输方式掘进方式断面(m2)工程量(m)剩余量(m)巷道名称岩性巷道性质组别一组二组一组二组xxx煤矿2019年度掘进接替计划表单位:米2019年度生产天数单位掘进一队掘进三队3124运输石门岩准裸矿车炮掘10.01201201203121回风石门岩准锚喷矿车炮掘10.0808080312补回风上山岩准裸自溜炮掘9.0260260130130312S煤仓扩刷岩开锚支炮掘2020603155底板抽放巷岩准裸皮带炮掘11.2170097013013070312N底抽巷岩准裸皮带炮掘9.21100440607013014040312运煤平巷岩准裸矿车炮掘9.220020070130312煤仓扩刷岩开裸炮掘101030111S底抽巷岩准裸矿车炮掘10.2100010008010010010010050312N进风上山及底抽巷岩准裸矿车炮掘9.260053010070130140903121N进风石门岩准裸矿车炮掘12.380803050312皮带运输巷岩准裸矿车炮掘9.22702705013090111N底抽巷岩准裸矿车炮掘10.2100010003013013013050一组150m皮带下山及车场岩开裸矿车炮掘12.21000850505010010010010050100100100100501000二组150m轨道下山岩准裸矿车炮掘12.22002005050100100100100501001001001005010003132回撤通道扩刷煤其锚支皮带炮掘9.81201201203231回撤通道扩刷煤其锚支皮带炮掘9.8150150100505151切眼扩刷炮其锚支自溜炮掘14.01201201203151切眼煤回锚自溜炮掘6.01301301303151切眼扩刷炮其锚支自溜炮掘14.0130130130二组3212(I)机巷沿空护巷炮回锚喷12.265020202050606060606060305003123回风石门揭煤软岩准锚喷矿车炮掘12.32020203121煤巷(设备安装)煤回锚棚矿车炮掘12.280803050312S煤仓施工立眼岩开裸1.52020203121下煤立眼岩开裸1.57070703251南煤仓施工立眼岩开裸10合计630710116010401240113097010101110123012105601200012000100100反井钻机1350650100100260025502000115012001200一组采煤五队准备队防突队二组一组二组掘进三队掘进五队开拓队本方案不含322采区相关巷道。