A2OMBR工艺处理受污染河水的试验研究廖日红

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

44    Vol.36 No.4 2010A2/O—MBR廖日红 申颖洁 刘 操 黄赟芳 吴晓辉 战 楠(, 100048)   利用A2/O—MBR(平板式)工艺进行北运河受污染河水净化试验研究,结果表明,进水有机负荷的改变对系统内CODCr、NH3—N和TN的去除影响很小,回流比的增加使得CODCr和TN的去除率提高约10%;受污染河水中溶解性有机物多且可生化性较差的特性影响了系统出水水质和膜污染速率,系统对DOC和UVA的去除率分别为77.3%和84.3%,对UV410的平均去除率达到99%;随着运行时间的延长,膜清洗周期逐渐缩短,混合液过滤性能的变化致使膜过滤阻力逐渐增加。 受污染河水 A2/O 膜生物反应器(MBR) 溶解性有机物ExperimentalinvestigationontheA2/O—MBRprocesstotreatthepollutedriverwaterLiaoRihong,ShenYingjie,LiuCao,HuangYunfang,WuXiaohui,ZhanNan(BeijingWaterConservancyScienceResearchInstitute,Beijing100048,China)Abstract:BycombiningtheplatemembranebioreactorwiththeA2/Oprocess,theA2/O—MBRwasconstructedandusedtotreatpollutedriverwater.TheresultsshowthattheraisingofrefluxratiocouldmaketheremovalratesofCODCrandTNincrease10%,butthechangingoforganicloadinghadlittleeffectonCODCr,NH3—NandTNremoval;boththedissolvedorganicmatteraccumulationanditscharacteristicshadinfluenceonthetreatedwaterqualityandmembranefoulingrate;theremovalratesofDOC,UVA,andUV410reached77.3%,84.3%and99%separately;withtheincreaseoftheoperationtime,themembranecleaningperiodkeepdecreasingandthemembranefiltrationresistanceincreasegraduallyduetothechangingofthemixtureliquidfiltrationcharacteristics.Keywords:Pollutedriverwater;A2/O;Membranebioreactor;Dissolvedorganicmatter  ,、,,,,,。,[1]MBR(8092011);(D0706060198082);(2008ZX07209-004)。,[2]。(MBR)A2/O,、。1 1.1 240L/d,1。、/、/,500L、30/60L、30/60L500L,DOI:10.13789/j.cnki.wwe1964.2010.04.003 Vol.36 No.4 201045   PVC。25L,400mm。,,。。:(),,,。PVDF,:0.1μm,0.03m2,16~24L/(m2·h),35kPa。1 A2/O—MBR1.2 ,24h。,。1,CODCr,《》(GB3838—2002)Ⅴ。1 CODCr/mg/L60~150(102)BOD5/mg/L15~30(21) NH3—N/mg/L15~25(18) TN/mg/L20~30(26) TP/mg/L2~5(3) pH7~8.3(7.5) :。1.3 《》(4)。TOC-VCPN(100),CARY50-,TU21800-,GDS23B,PHS23C,DINEX-600,180280。2 2.1 ,3,27d。,,9dCODCr,10L/h,。18d。2。2 123/d1~910~1819~27CODCr/mg/L510~940185~39560~150/mg/L25~4120~3215~25/m3/h0.30.30.3/L/h101010/℃25~2825~2825~284min1min4min1min4min1minHRT/h1688 /kgCODCr/(kgMLVSS·d)0.24~0.260.17~0.200.09~0.13SOUR/mgO2/(gMLVSS·h)10.77.44.2CODCr/%8272.365.1NH3—N/%939090  ,CODCr。3,CODCr65.1%,NH3—N90%。(SOUR)[3]。2,,,,,,,,。2.2 ,CODCr、NH3—NTN。3。46    Vol.36 No.4 20103 120.5∶10.5∶1 /g/L0.8~1.30.8~1.3/L/h510 /kgCODCr/(m3·d)0.04~0.100.08~0.192   2,2a:CODCr,61%~65%,CODCr40mg/L,《》(GB3838—2002)Ⅳ。2b、2c,,NH3—N2mg/L,89%;TN15mg/L,31%~34%。3 2.3 ,3。1∶1,CODCrTN,30mg/L12mg/L,CODCr《》Ⅳ。0.5∶11∶1,CODCr8.9%~9.3%,TN8.2%~13%。, Vol.36 No.4 201047   ,,CODCr。NH3—N,NH3—N2mg/L,《》Ⅳ。2.4 。,、(DOC40%~60%),UV254(UVA)[4]。SUVA(UV254/DOC),,。,DOC、UVASUVA。410L/h、1∶1,。:。4 CODCr/mg/LDOC/mg/LUVA/cm-1SUVA/L/(mg·m)  10171.387910.32230.45158155.854750.30070.53844320.345760.14110.6935 3116.196840.05060.3124 70.0%77.3%84.3%4 UV410  ,UV410,,,UV410[5]。4UV410。:,,20,90%,UV410,。,,,UV410。2.5 、MBR,。,,(TMP),。,,。5,:36d,35kPa,(0.05%NaClO,2h),。62d85d,,23。,,。5 6,:,。,,,(EPS)。EPS。,,MBR[6~8]。,,,,;,,,,。48    Vol.36 No.4 20106 3 (1)A2/O—MBR,,,,。(2)CODCr、NH3—NTN,0.04~0.10kgCODCr/(m3·d)0.08~0.19kgCODCr/(m3·d),CODCr、NH3—N、TN61%~65%、89%~91%31%~34%,40mg/L、2.0mg/L15mg/L。(3)CODCrTN。0.5∶11∶1,CODCrTN,8.9%~9.3%8.2%~13%,CODCr《》Ⅳ;NH3—N,NH3—N2.0mg/L,90%。(4),DOCUVA77.3%84.3%,UV41099%。(5),,,。参考文献1 LiXY,ChuHP.Membranebioreactorforthedrinkingwatertreatmentofpollutedsurfacewatersupplies.WaterResearch,2003,37(19):4781~47912 ,.—MBR.,2002,18(12):16~193 ,..,1991,54(3):35~394 ,.UV254.,2004,24(2):61~655 AndersenDO.Natureofnaturalorganicmater(NOM)inacidifiedandlimedsurfacewaters.WaterResearch,2000,34(1):266~2726 WilliamsMD,PirbazariM.Membranebioreactorprocessforremovingbiodegradableorganicmatterfromwater.WaterResearch,2007,41(17):3880~38937 LiangS,LiuC,SongL.Solublemicrobialproductsinmembranebioreactoroperation:Behaviors,characteristics,andfoulingpotential.WaterResearch,2007,41(1):95~1018 ,,,..(),2007,23(3):493~495  &E-mail:shenspring@sina.com:2009-10-30:2010-01-05(上接第1页)在建和待建项目包括:北京市北小河污水处理厂(10万m3/d)、西安市第五污水处理厂(20万m3/d)、深圳市滨河污水处理厂(18万m3/d)等。对于新厂的设计,结合科研结果,在设计之初就要考虑到污水处理厂运行周期内,如何应对进水水质的变化和出水要求的提高。在池型设计、设备配置、管线布置上预留将来工艺及运行方式调整的可能性,使新建的污水处理厂既能满足近期处理要求,又可为远期高标准要求的运行及改造留有空间。提出多模式A2/O处理工艺设计、运行新概念。通过对进水、混合液及回流污泥渠道上不同位置闸门的开启实现不同的运行工况,即根据进水水质调整碳源的分配点,使其兼具传统A2/O工艺和倒置A2/O工艺的优点,使生物池能够根据不同来水水质情况选择不同运行模式,从而达到不同的处理效果。3 在污水处理技术大力发展的今天,科研成果应用于实际工程的案例还有很多,但同时我们也应该清醒地认识到,研究与实践脱节的现象也不在少数。实践证明,产学研结合的科研原则,是使科研成果推广最快、内容验证最充分、实用价值最大的有效方法,能使工程设计更加科学化、系统化、标准化。

1 / 5
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功