城市景观水体水质净化的人工湿地设计张琼华

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

3 11环境工程学报Vol.3,No.11200911ChineseJournalofEnvironmentalEngineeringNov.2009张琼华 吉倩倩 王晓昌 黄廷林(,710055)  、、、,。,5,,。     X505   A   1673-9108(2009)11-1965-04DesignofconstructedwetlandforwaterqualitypurificationofurbanlandscapewaterZhangQionghua JiQianqian WangXiaochang HuangTinglin(SchoolofEnvironmentalandMunicipalEngineering,Xi'anUniversityofArchitectureandTechnology,Xi'an710055,China)Abstract Fromthedesignscale,waterqualitystandard,theplaneanddikedesign,influentways,anti-seepagestructuredesignandtheplantspeciesoftheconstructedwetlandarea,thedesignproposalofconstructedwetlandforthewaterqualitypurificationofurbanlandscapewaterwasintroduced.Takingadvantageofthenatu-ralterrainofthedistrictinnorthwestofChina,afive-stagemultistepconstructedwetlandwasdesigned.Itmadesurethattheeffluentwaterqualitytoparticipateinthewatercyclemetabolismoftheartificialriverorlakesys-tem.Keywords constructedwetland;scale;waterquality;anti-seepagedesign:“”(2008ZX07317-004):2009-01-06;:2009-02-01:(1981~),,,。E-mail:demonyuer@yahoo.com.cn  2070,--、。,、、、、、、、。,、、、、、、,600、,、、200[1~6]。,、、、,[7~15]。,,,、,。,。1 1.1 ,,1,40000m2,90000m3/d。,,。Q=67500m3/d。1.2 ,3。《》(GB3838-2002)Ⅳ。1。1 Table1 Influentandeffluentofwaterqualitystandardinconstructedwetland(mg/L)CODBOD5TNNH3-NTP≤50≤10≤10≤5(8)≤0.5≤30≤6≤1.5≤1.5≤0.32 COD、BOD5、TN、NH3-NTP,。,,。2.1 :AB=Q(CB-Ce)N,AB———(m2);Q———(m3/d);CB———(g/m3);Ce———(g/m3);N———(g/m2·d)。,COD、BOD5、TN、NH3-NTP5N5.0~18g/(m2·d)、1.5~5g/(m2·d)、2.5~8g/(m2·d)、2~5g/(m2·d)0.3~0.5g/(m2·d)。,,COD:AB=84375m2;BOD5:AB=77143m2;TN:AB=88269m2;NH3-N:AB=78750m2;TP:AB=33750m2。,,88000m2。2.2 [16~18],M0.6~1.2m3/(m2·d),M0.8m3/(m2·d),:AB=Q/M=67500/0.8=84375m2,(TN)88000m2,7000m2,95000m2。3 3.1 1,、,。。:490m;()580m;()670m;()730m;()780m;()500m。:B×H=(2.0m×2.0m)+[(2.0m+3.0m)×2.5m÷2]=10.25m,。1 Fig.1 Cross-Sectionstructureofdikeinconstructedwetland3.2 ,,,。5,8000m2、15000m2、17000m2、22000m226000m2,3750m,,2m。。2,3。,1m,,。  196611:2 Fig.2 Planoftheconstructedwetland3.3 ,,、,,,。(),,,、、、,、、、。2。3 Fig.3 Cross-sectionstructureofconstructedwetland2 Table2 Watersupplyoffive-stagemultistepconstructedwetland(m3/d)6136.411505.713039.816875.019943.106136.417642.130681.947556.96136.417642.130681.947556.967500.0、、、,,,,。。4 ,19673,,,1∶9,300mm。,,200mm,。7.5×10-7cm/s。,,。15~17。5 。,[16~20]。,、,、。,,,,。(Cannaindica)、(Iristectorum)(Cyperusalternifolius);(Epiprem-numaureum)(Monsteradeliciosa),,,,1m,,3。3 Table3 Effectofplantonimprovementofwaterquality(%)NH3-N9092849790COD4842304550TN6779598455TP66956093596  ,。,,,,。,,。[1],,..,2008,30(2):7~10[2],..,2005,24(2):76~79[3]ChriscTanner.Treatmentofdairyfarmwastewaterinhori-zontalandup-flowgravel-bedconstructedwetland.WaterScienceandTechnology,1994,29(4):85~93[4]..,1994,16(3):83~86[5]..,2008,34(9):26~29[6]LongM.Nguyen.Organicmattercomposition,mirrobialbiomassandmicrobialactivityingravel-bedconstructedwetlandstreatingfarmdairywastewaters.EcologicalEngi-neering,2000,16:199~221[7],,.、.,2008,30(4):141~146[8],,,..,2008,2(3):319~323[9],,,..,2004,23(6):1046~1049[10],,,..,2003,24(l):80~83[11],,,..,2005,26(l):47~50[12],,,..,2005,26(1):51~55[13],..,2003,19(1):23~24[14],,,..,2006,27(2):253~256[15],,,..,2005,21(8):37~40[16]..,2001,27(18):35~36[17]ChenZ.M.,ChenB.,ZhouJ.B.,etal.Averticalsubsurface-flowconstructedwetlandinBeijing.Communi-cationsinNonlinearScienceandNumericalSimulation,2008,13(9):1986~1997[18]RousseauD.P.L.,LesageE.,StoryA.,etal.Con-structedwetlandsforwaterreclamation.Desalination,2008,218(1~3):181~189[19],..,2006,32(11):25~27[20],,,..,2007,23(2):39~421968

1 / 4
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功