:2008-09-02:(1982-),,,,E-mail:kangxiaokun@126.com康晓鹍,王世和(, 210096) :,,。、、,。:;;;:X703;S216.4 :B :1000-1166(2009)02-0035-03ResourcerizingofSludgefromMunicipalWastewaterPlantbyAnaerobicDigestion/KANGXiao-kun,WANGShi-he/(DepartmentofMunicipalEngineering,SoutheastUniversity,Nanjing210096,China)Abstract:Operationandmanagementofanaerobicdigestionofmunicipalsludgefromwastewaterplantwasdiscussedinthispaper.Sludgepretreatmentwithultrasonicorozonewereintroduced.Andthetechnologystatusofpowergenerationwithproducedbiogaswasalsopresented.Itwasproposedthatanaerobicdigestionisvalidforresourcerizingofmunicipalsludgefromwastewaterplant.Keywords:sludge;anaerobicdigestion;methane;wastewaterplant;resourcerization ,。,。,10%[1],。,,、、,。,,,。,,,,。,20%~50%,30%~40%[2]。,、、、。,,、、,。、,,;,、,。。1 1.1 污泥厌氧消化预处理,,20~30d,30%~50%VSS。,,,,。,。,。1.1.1 ,“”,35ChinaBiogas2009,27(2),5000℃,500,。“”“”,,。,,。NickelK31kHz,3.6kW64s,COD630mg·L-12270mg·L-1。,15℃45℃。22d8d,[8]。、,2000W·m-2,60min,10d,COD41%;25d53%[9]。1.1.2 ,,,,,。MWeemaes,,(O3/COD)0.1g·g-1。,1.8,2.2。1.2 厌氧消化运行管理1.2.1 ,。,,,。33℃~35℃,,,,。,35%~45%,,。1.2.2 ,,。。:、、,,,,;,,,[7]。1.2.3 。,,,,,[7]。。2 ——— ,,,,,,,,。,1kg0.35Nm3,0.7kWh[3,4]。、、,,、、。10%,25%[5]。,75%,57%。,,。,70%[6]。6,。17,15%~30%,64%~73%[4]。、,,,。100m3,4000m3,,,36ChinaBiogas2009,27(2)1.8m3,3kWh,1000kWh(500),5000[5]。 《([2000]124)》5.2,“10m3,,”。,、、,[10]。,,,,,[1]。,,1m3·d-1[11]。,,,,、。3 ,。、、。、,,,、,。:[1] ,,.[J].,2004,20(12):89-92.[2] ,,.[J].,2003,22(2):35-38.[3] .[M].:,2002.[4] ,,,.[J].,1999,12(3):57-59.[5] ,.[J].,2006,32(11):41-44.[6] .(Ⅰ)[J].,2000,13(1):43-48.[7] ,,,.[J].,2004,30(12):1-5.[8] NickelK,NeisU.MethodsforDisintegrationofSewageSludgeR[M].Hamburg:TUHamburg-Harburg,2004.[9] ,,,.[J].,2006,26(4):206-309.[10],,.[J].,2005,6:49-52.[11],,.[J].,2007,33(7):46-51.(41),。,,。3 (1),。,、,。,,,。(2),。,“”,,,。,200~300,300。(3)。,,、、、,。(4)。,“”。。,、,、。,,、。,,,。37ChinaBiogas2009,27(2)