张兴惠(太原理工大学环境科学与工程学院,山西太原030024):,;。,,、,,。:;;;;:X773;TQ342.8 :A :0253-4320(2009)07-0065-03OptimizationdesignoftheconcentratestreamregulationsysteminreverseosmosiswatertreatmentZHANGXing-hui(CollegeofEnvironmentalScienceandEngineering,TaiyuanUniversityofTechnology,Taiyuan030024,China)Abstract:Linkingwithsomepracticalexample,areverseosmoticwatertreatmentsystemisintroduced.Concentrationwaterregulationsysteminreverseosmoticwatertreatmentisoptimized.Byoptimizationofdesignofconcentrationwaterregulationpipelineandwashdischargepipelineintheconcentrationwaterdischargesystem,largemembranesysteminreverseosmoticwatertreatmentcouldattainnormalfunctionandwatertreatmentdemandinashortertime,andcouldeconomizewater,energy,andshortenregulationtime.Thisworkmayprovidereferenceforengineeringpractice.Keywords:watertreatment;reverseosmosis;concentrationwater;regulationsystem;optimizationdesign :2009-02-25 :(1972-),,,,,zxftut@163.com。 ,,。、、、、、、,,,、,。[1-4],。,。,,,:,。、、,,,,。、,。,2×60m3/h,。1 1.1 “”、“”、“”3,、、[1]。,,,。1.2 :,≥130m3/h,2×60m3/h,5~25℃,≥75%,3≥97%,·65·297现代化工July200920097ModernChemicalIndustryDOI:10.16606/j.cnki.issn0253-4320.2009.07.008≤10%,,,。2 :“+”;,CPA3-8040,8″,7∶4;“+”,1()。1—;2—;3—;4—;5—CO2;6—;7—图1 水处理系统工艺3 44,,。,8~20m/h,28~33m/h,160~175m3/h;120~130m3/h,75%,120~130m3/h。2,140m3/h。,5~25℃。4 4.1 、3[1]。,:、、、、、,,5~25℃,≥75%,3≥97%,≤10%,2×60m3/h,(5℃)≥130m3/h,:CR90-6,N=45kW,Q=80m3/h,H=145mm, (上接第64页)③;④,“”,;⑤,。,,,、,。。,,,50~100,,,,。,,:①;②;③,,。1.6 ,,,、、、。2 ,,,。2008,21,,30t。200726,607NTU,2008153NTU,,20082007,8~24h,,,,,2008200721t,2008200716t。,,,。。□·66·现代化工2972。图2 反渗透装置系统4.2 ,、、,。,,,。4.2.1 反渗透膜系统管路基本要求,。,。,:(1),、,。(2)。(3)。(4)。(5)。4.2.2 反渗透浓水调节系统的优化设计,。,。;;,。,,,,,。,,。,,。,,,。2×60m3/h,:(1)100mm,100mm,100mm。65m3/h,75%,21.7m3/h,50mm。(2)60m3/h,75%20m3/h,,47.96mm。(3),50mm,、,。2×60m3/h,,,、、,。5 ,,,、、,。2×60m3/h,。[1].[M].:,2006.[2].[M].:,2004.[3].[J].,2008(6):67-68.[4].,GB/T19249—2003[S].:,2003.□·67·20097: