中天三建质量管理标准化木模板工程做法

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

中天建设集团第三建设公司编号名称建筑工程木模板工程施工标准版本试行版生效期-1-建筑工程木模板工程施工标准编制:审核:批准:中天建设集团第三建设公司编号名称建筑工程木模板工程施工标准版本试行版生效期-2-建筑工程木模板工程施工标准(试行版)一材料···························································································3二木模板施工流程图········································································4三施工图标准化··············································································5四模板集中加工··············································································5五楼板支模····················································································6六梁支模·······················································································9七剪力墙支模················································································10八柱子支模···················································································15九楼梯支模···················································································18十后浇带······················································································21十一二次结构···················································································23十二实测实量···················································································25中天建设集团第三建设公司编号名称建筑工程木模板工程施工标准版本试行版生效期-3-1材料要求1.1模板建议采用廊坊大地或廊坊五棵松覆膜黑板,廊坊五棵松915*1830覆膜黑板价格大约73元/张,廊坊大地覆膜黑板价格大约80元/张。进口方木方木压刨处理1.2加固用内楞龙骨建议采用40(50)*90*3000进口方木或40*60*3.0方管。对没有压光处理的方木进场后应进行压刨处理,做到尺寸准确,外形平直,长期周转使用变形较小,价格大约为2050~2500元/立方。中天建设集团第三建设公司编号名称建筑工程木模板工程施工标准版本试行版生效期-4-1.3支模架钢管必须采用3.0mm厚以上钢管;顶托直径不得小于36,顶托建议采用U型托板。2木模板施工流程图图纸深化设计、工人交底加工车间设置、加工定位放线、找平验线支模架搭设、抄水平梁底板铺设检查楼板铺设检查柱、剪力墙、楼梯定位、支模验收中天建设集团第三建设公司编号名称建筑工程木模板工程施工标准版本试行版生效期-5-3施工图标准化3.1模板施工图标准化是以单构件(单构件指单个墙体、单块平板、单个梁等构件)为单位,绘制构件模板支撑体系及配模图,汇总配料清单。主要包括以下三个方面:a、墙体模板加工图:墙体每面均有立面图,并显示与梁板之间的结合关系,标注模板规格、螺杆间距、木方规格尺寸及间距、钢管规格及间距、顶托距离梁板的距离及离地的距离、墙体支撑体系设置等。b、梁模板加工图:绘制梁模板平面图、立面图、断面图,标注模板规格、螺杆间距、加固体系、支撑体系、梁侧板与墙柱、平台板关系等。c、楼板模板加工图:绘制楼板模板平面图,木方平面图并标注间距、支撑体系平面图、立面图并标注间距,标注模板规格尺寸等。标准层平板配模图平板A块配模详图3.2对所有平板、梁、墙板、柱分别进行详细配模,然后把各种型号的模板进行编号、统计,形成模板配料单。4模板集中加工4.1通过模板图纸标准化形成的模板配料单、方木配料单,对所有梁、板模板按部位进行下料,对非标板材进行了统筹利用实现作业面模板的统一下料和集中领用和提高了模板安装的精度和效率。4.2切割模板应采用高速精密圆盘锯,保证切割面平直度,防止拼缝处漏浆。木模板集中加工车间梁板详细配模图中天建设集团第三建设公司编号名称建筑工程木模板工程施工标准版本试行版生效期-6-高速圆盘锯模板分类码放5楼板支模5.1梁板支模架5.1.1支模架应采用钢管扣件+可调U托顶形式,建议采用碗扣式支模架。支模架立杆间距控制在900-1000之间,步距不得大于1500,立杆距离墙边不宜大于400mm。5.1.2架子立杆高度应选择比楼层净空高度低400mm左右的钢管;标准层应设置三道纵横向水平管,扫地杆离地不得超过200(碗扣件离地不得超过350),钢管上端自由端不得超过500,可调U型顶托螺纹部分不得超过250。≤1000≤350≤1500标准层设置三道水平杆≤400中天建设集团第三建设公司编号名称建筑工程木模板工程施工标准版本试行版生效期-7-5.2.楼板加固3.1、楼板支模木龙骨或型钢布置要求均匀,净空间距不超出200mm(板厚150mm内)。3.2、木龙骨或型钢布置距墙面的距离控制在150mm以内,悬挑长度控制在250mm以内为宜,总长度不得大于400mm。3.3、主龙骨钢管建议采用双钢管安装,未端悬挑长度不宜超过250mm,且距墙面距离控制在150mm内为宜;5.2.1楼板支模木龙骨或型钢布置要求均匀,净空间距不超出200mm(板厚150mm内)。5.2.2木龙骨或型钢布置距墙面、梁面的距离控制在150mm以内,方木悬挑长度控制在250mm以内为宜。5.2.3主龙骨钢管必须采用双钢管安装,未端悬挑长度不宜超过400mm,保证楼板底面平整度。5.2.4楼板建议采用40*60*3.0方管和40*90进口方木混用作为模板支撑龙骨,提高楼板底板平整度。5.2.5楼板与墙板或梁板交接阴角处均应设置一根通常方木,用来固定阴角处模板,保证阴角顺直和防止漏浆。在墙板和平板模板交界处通长设置一根方木,用来固定平板和墙板上口模板建议采用双钢管在墙、梁板和平板模板交界处通长设置一根方木,用来固定平板和墙板上口模板方管方木结合≤200≤250≤400≤150中天建设集团第三建设公司编号名称建筑工程木模板工程施工标准版本试行版生效期-8-边梁控制线实测实量5.2.6楼板模板安装完成后,应在模板上设置200或300控制线,以此作为开间和墙柱、边梁的控制线,保证边梁支模准确。5.2.7梁板模板安装完成后,首先采用拉线检测模板极差,还应用铝合金尺进行板面平整度检测。平板模板安装完成后极差不得大于6mm,平整度允许偏差不得大于5mm。模板间缝隙不得大于1mm,用胶泥填塞密实。5.3挂模施工5.3.1卫生间、厨房间建议采用5#槽钢制作定型化模板支模,用螺栓固定,提高阴阳角方正度。楼板支模板面标高允许偏差为±3mm;平整度允许偏差5mm;在木工铺出平板,封柱板前用垂准仪按照楼层放线精度,达到控制开间尺寸,外边梁柱定位目的。棱角方正、拆模后无破损螺栓固定固定挂模和控制挂模平整度角部三角固定中天建设集团第三建设公司编号名称建筑工程木模板工程施工标准版本试行版生效期-9-5.3.2对大于15cm的下沉式挂板,应额外采取顶拉结合的定位加固措施,在模板底部焊接“十”字定位卡,角部拼缝处采用直三角加固。6、梁模板施工6.1梁支模控制重点部位6.2梁支模体系6.2.1同一作业面上所用的模板、木方必须保证厚度一致,高度小于600的梁采用U型方木箍进行加固固定,间距不得大于600,高度大于600的梁中应按施工方案设穿对拉螺杆,防止出现胀模,梁两侧可采用扣件固定方木的形式固定。6.2.2长度大于4000的梁应按1/1000—3/1000进行起拱,梁底标高必须保证准确,梁底板铺设完梁底平直度梁身梁端头梁梁交接处中天建设集团第三建设公司编号名称建筑工程木模板工程施工标准版本试行版生效期-10-成后应进行标高复核。梁柱节点支模构造6.2.3梁墙交接处,梁底模在墙堵头板上方,与堵头板内表面平齐,梁底方木距墙堵头不超过100,防止梁端头出现下坠现象。7剪力墙支模7.1剪力墙螺杆间距≤250450450450≤150450≤200≤150≤500≤500≤500450≤500≤500≤500剪力墙定位点阴角处方木加固≤200≤100中天建设集团第三建设公司编号名称建筑工程木模板工程施工标准版本试行版生效期-11-7.1.1层高3米的标准层墙体应设置5~6道水平加固螺杆,水平加固螺杆间距不得大于500mm,最底下一道离地不得大于200mm,最上面一道离板底不得大于250mm。7.1.2对拉螺杆采用Ф12螺杆,底下三道加固箍应采用两个螺帽加固,防止螺帽因震动而松动。模板集中钻眼7.2剪力墙支模标准模板集中钻眼6.2剪力墙支模体系7.2.1剪力墙龙骨应采用通长50*90进口方木、5#槽钢或40*60*3,0方管加固,净空间距不得大于200mm;所有模板拼缝处均应设置和槽钢或方管同规格进口方木加固,防止漏浆。7.2.2所有剪力墙应设置保证墙体垂直度的斜撑,防止在浇混凝土过程中产生墙体偏扭。保证剪力墙垂直度所用顶杆和拉索固定上口模板用通长方木龙骨采用通长进口方木、5#槽钢或40*60*3.0方管,间距≤150mm.墙边、接缝处采用方木固定,防止漏浆当墙面较短时可采用通常螺杆集中钻眼,每张模板钻8个¢20眼中天建设集团第三建设公司编号名称建筑工程木模板工程施工标准版本试行版生效期-12-7.3剪力墙定位剪力墙定位和底部找平7.3.1剪力墙模板安装前须设置离边200或300的控制线、轴线和剪力墙边线,用来复核剪力墙模板的定位和垂直度的准确性;7.3.2在剪力墙支模前应对剪力墙底部进行砂浆找平或模板条找平,减少因墙模板与楼面存在缝隙造成漏浆。7.4堵头板固定小转角螺杆加固使用水平仪在木板条上加设木片调整标高通长螺杆加固在原剪力墙支模主龙骨上焊接一根12cm长钢管,然后采用对拉螺杆固定中天建设集团第三建设公司编号名称建筑工程木模板工程施工标准版本试行版生效期-13-阳角活动扣加十字扣加固阴角短墙两道螺杆加固7.4.1剪力墙堵头板模板拼缝处应采用方木固定,防止剪力墙阳角漏浆.对于较短剪力墙堵头板建议采用通长螺杆加固,防止剪力墙端头变形、胀模。7.4.2剪力墙堵头支模前在剪力墙同一水平筋两端焊接对拉螺杆,用以加固堵头板和剪力墙阳角。7.4.3墙厚为250mm及以上时剪力墙阳角加固:在原剪力墙支模主龙骨上焊接一根12cm长钢管,然后采用对拉螺杆固定。7.4.4层高小于3m和墙厚为200mm时剪力墙阳角加固:在原剪力墙支模长钢管上固定一个活动扣,然后采用对拉螺杆固定,端头加固钢管必须和剪力墙支模长钢管十字扣固定。7.4.5剪力墙阴角加固:剪力墙阴角处必须采用两道穿墙螺杆加固,长方向阴角处穿墙螺杆应加长加固短方向端头板。7.5剪力墙厚度和钢筋保护层厚度控制7.5.1剪力墙支撑条在模板拼缝两侧都应进行放置,其他部位放置间距不得超过600,保证剪力墙模板在加固时受力均匀,混凝土结构厚度一致。7.5.2塑料保护层应固定在剪力墙主筋上,间距

1 / 26
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功