凉山乐武及新凉牵引站改接冕山110kV线路工程附着式钢管抱杆分解铁塔组立施工方案西昌电力工程公司2018年11月凉山乐武及新凉牵引站改接冕山110kV线路工程附着式钢管抱杆分解铁塔组立施工方案批准:年月日审核:年月日年月日编制:年月日凉山乐武及新凉牵引站改接冕山110kV线路工程附着式钢管抱杆分解铁塔组立施工方案目录一、工程概况及适用范围...................................................11.1工程简述...........................................................11.2本工程的特点:.....................................................4二、编写依据............................................................9三、作业流程...........................................................10四、安全风险辨析与预控..................................................11五、作业准备...........................................................165.1单个作业点人员配备...............................................165.2单个作业点主要工器具及仪器仪表配置................................16六、作业方法...........................................................196.1施工准备.........................................................196.2附着式钢管抱杆分解组立技术措施及要求..............................23七、铁塔组立安全及文明施工措施..........................................327.1一般安全要求......................................................327.2防风、防火、防盗、防电害安全技术措施:...........................337.3地面组装安全要求:...............................................337.4吊装作业安全技术要求:...........................................347.5其它有关安全施工措施.............................................357.6文明施工措施.....................................................357.6.4做到工完、料尽场地清。............................................35八、质量控制措施及检验标准..............................................368.1质量控制措施......................................................368.2.质量控制表......................................................388.3.检验标准........................................................38附件一:主要工器具受力分析计算书........................................391、钢管抱杆选用及受力分析计算........................................392、主要受力工器具的选用及计算........................................402.4起吊绳受力计算......................................................412.5作用于抱杆的轴向压力计算............................................412.6作用于抱杆顶的水平力计算............................................422.7牵引绳静张力计算....................................................42凉山乐武及新凉牵引站改接冕山110kV线路工程附着式钢管抱杆分解铁塔组立施工方案1一、工程概况及适用范围本作业指导书适用于凉山乐武及新凉牵引站改接冕山110kV线路工程。1.1工程简述本工程线路路径总长约14.683km。其中单回路长度约为11.771km,双回路长度2.912km。本工程新建铁塔49基。铁塔使用明细见详见下表:表1-1塔型分段统计表凉山乐武及新凉牵引站改接冕山110kV线路工程附着式钢管抱杆分解铁塔组立施工方案2杆型呼高(m)配段单段最大吊装重量(kg)数量(基)塔基总重量(kg)1A4-ZM2241~5+15+1616段:67.51kg25205.1271~5+17+1818段:76.29kg15679301~88段:76.29kg26206.91A4-ZM2G241~6+26+3030段:54.48kg14658.9271~6+31+3531段:68.95kg15149.9301~7+36+1414段:70.39kg15729.6331~7+37+1437段:74.66kg16145.51A4-ZM3271~5+17+1817段:81.66kg16076.9301~6+19+2020段:75.85kg16615.7331~6+21+2222段:92.2kg27125.8361~88段:104.48kg37878.61A4-ZM3G241~6+23+2727段:61.64kg15204.51A4-ZMK451~8+16+1717段:136.21kg110735.21A4-J1151~7+9+1010段:104.63kg15467.7241~8+15+1616段:125.55kg37417.51A4-J1G241~7+27+316段:113.53kg16484.41A4-J2241~9+1616段:115.98kg17574.21A4-J2G271~7+31+3531段:141.84kg17631.9凉山乐武及新凉牵引站改接冕山110kV线路工程附着式钢管抱杆分解铁塔组立施工方案3301~9+138段:214.87kg38838.61A4-J3211~8+14+1515段:141.09kg17313.7241~9+1616段:141.09kg27998.51A4-J3G181~7+18+217段:146.38kg16746.81A4-DJ241~7+14+1515段:168.98kg19396.11D6-SZ2301~9+1717段:151.89kg28108.11D6-SZ3361~11+2121段:188.5kg110344.91D6-SZK361~12+1313段:82.34kg110050391~12+14+1515段:89.72kg210917.51D6-SJ1G241~9+3131段:205.73kg110571.6361~12+1710段:240.18kg115012.41D6-SJ3241~12+1717段:344.59kg213311.71D6-SDJ151~7+99段:241.92kg113143.7211~8+1212段:241.92kg115354.5241~8+1313段:313.56kg316214.8由上表可知,1D6-SDJ型6段主材重量最大313.56kg,采用主材单吊、单边辅材片吊的方式满足Φ165钢管抱杆的安全起吊值400kg。本方案满足在本工程杆塔组立中使用。凉山乐武及新凉牵引站改接冕山110kV线路工程附着式钢管抱杆分解铁塔组立施工方案4图1-1塔腿编号示意图右CBAD线路方向左1.2本工程的特点:1)铁塔单角钢型式,起吊时应控制好起吊重量,起吊塔片时,必须对塔片采取加固措施。2)本工程采用附着式外拉线分解杆组立方式。3)本工程单基重量在5t~17t,组塔的工器具选用及方法,在满足施工安全前提下,还应充分考虑施工的效率。高塔施工时必须确保现场的通讯顺畅,对靠近电力线施工时,应控制好拉线、缆风绳等与相邻线路的距离。4)铁塔塔腿编号规定:如图1-1所示。5)铁塔螺栓安装使用规定:a.单帽螺栓:配1垫片、1普通螺母、1扣紧螺母。b.双螺帽螺栓:配1垫片、2普通螺母。c.防盗螺栓:配1垫片、1普通螺母、1防盗螺母。d.脚钉:配1垫片、2普通螺母(9米以上为普通螺母,9米及以下配1防盗螺母)。e.螺栓全部采用热镀锌,所有螺栓(含防盗螺栓)、脚钉强度等级M16、M20为6.8级,M24为8.8级,并在端部标明等级。f.本工程螺栓穿向规定,见下表1-3。表1-3螺栓穿向规定立体结构a.水平方向由内向外;b.垂直方向由下向上(包括斜面方向)。平面结构a.顺线路方向:由送电侧穿入(小号往大号);b.横线路方向:两侧由内向外,中间由左向右(指面向大号侧);c.垂直方向:由下向上。其它要求a.相关螺栓穿向参考图1-2a。横担部分水平方向以塔身为中心线对称向外;如横担中心隔面为单层结构,面向大号从左到右。地线支架横线路方向由内往外穿。b.十字组合角钢的螺栓穿戴方向按俯视图以逆时针方向安装(如图1-2b)。c.个别螺栓与铁塔有抵触者,可协调穿,个别部位螺栓正、反向上均满足验收规范要求时,为方便运行维护,应优先考虑从下向上穿向。凉山乐武及新凉牵引站改接冕山110kV线路工程附着式钢管抱杆分解铁塔组立施工方案56)螺栓安装工艺要求a.螺杆应与构件平面垂直,螺栓头平面与构件间不应有空隙。b.螺母拧紧后,螺栓露出螺母的长度:对单螺母,不应小于2个螺距;对双螺母,可与螺母相平。c.交叉处有空隙的地方应加相应厚度的垫圈或垫板。d.本工程所有铁塔螺栓均须在螺帽侧安装1个垫片,螺栓紧固应在垫片侧进行;螺杆必须加垫者,每端不宜超过两个。e.杆塔部件组装有困难时应查明原因,严禁强行组装或用气割进行扩孔或烧孔。f.节点处螺栓规格必须一致。g.螺杆与螺母的螺纹有滑牙或螺母的棱角磨损以致扳手打滑的螺栓必须更换。7)本工程防松防盗螺栓安装使用规定:a.采用防盗帽防盗螺栓,螺杆出扣可与螺母平。接地引下线采用双普通M16×60螺栓安装。b.防盗、防松螺栓安装规定:(1)以铁塔最短腿基础面向上9m范围的安装防盗螺栓,若在9m处碰到包钢和联板应将其全部安装防盗螺栓,同时在此区间的脚钉都应安装防盗脚钉。(2)除防盗螺栓安装范围和双帽螺栓外,其余构件所有连接螺栓采用防松片扣紧螺母。c.为防止塔材被盗,防盗螺栓应在铁塔组立好后一次性安装完,且必须将防盗螺栓紧固到设计要求的扭力矩并认真进行自检。塔头防松螺栓的防松扣帽,必须在架线附件安装完毕且螺栓已复紧后方可安装。凉山乐武及新凉牵引站改接冕山110kV线路工程附着式钢管抱杆分解铁塔组立施工方案68)本工程三牌的安装要求在本工程铁塔不同位置分别安装塔号牌、极性标示牌和警示牌(即三牌),铁塔组立时应注意三牌安装孔的正确位置,安装原则(具体设置还要符合运行单位的要求)见下表1-4。表1-4三牌的配置原则序号名称单基配置安装原则1杆号牌警示牌各1块1、每基铁塔的杆号牌及警示牌各安装一块,均安装在铁