1目录1.编制说明.....................................................32.编制依据......................................................32.1设计图纸...........................................................32.2本工程施工及材料依据的规范.........................................33.工程概况.....................................................33.1工程简介...........................................................33.2工程重点及难点分析.................................................64.施工部署.....................................................64.1工程施工目标.......................................................64.2现场组织管理机构...................................................74.3施工准备.........................................................115.钢结构施工方案概述..........................................155.1钢结构施工原则....................................................155.2钢结构现场吊装技术路线............................................165.3钢结构焊接技术路线................................................166.钢结构加工制作和运输方案....................................166.1钢构件工厂制作工艺................................................166.2钢构件的运输......................................................347.钢结构现场安装方案..........................................387.1定位和测量放线施工方案............................................387.2钢结构现场安装施工步骤和流程......................................427.3钢结构吊装施工方法................................................467.4现场焊接方案......................................................548施工总体进度计划及保障措施..................................588.1施工总体进度计划安排..............................................588.2施工进度计划保障措施..............................................599施工现场总平面布置..........................................629.1施工临时用地......................................................6210.质量保证计划和创优计划....................................6310.1工程质量创优计划.................................................6310.2质量管理体系.....................................................6310.3质量保证管理组织机构体系.........................................67210.4构件原材料质量保证措施...........................................6810.5加工生产过程中的质量保证措施.....................................6910.6安装质量控制措施.................................................7810.7焊接质量控制措施.................................................8110.8防腐质量控制与检测...............................................8711.冬季施工方案及保证措施.....................................8811.1XX气候环境......................................................8811.2冬季施工措施.....................................................8912.施工安全措施方案...........................................9112.1安全生产目标.....................................................9112.2安全组织与管理体系...............................................9212.3安全技术措施.....................................................9312.4安全生产应急预案机制............................................10713.现场文明施工、消防、环保及保卫方案........................10713.1确保文明施工的技术措施..........................................10713.2消防措施........................................................11013.3保护环境减少扰民降低环境污染和噪音的措施........................11014成品保护和工程保修工作的管理措施和承诺....................11114.1成品保护措施....................................................11114.2工程交验后的服务措施............................................11215.紧急情况的处理措施、预案以及抵抗风险的措施................11415.1事故事件和紧急情况清单..........................................11415.2应急期间组织机构及职责..........................................11431.编制说明此施工组织设计为XX市轨道交通**线工程**站和**站钢结构工程而编制,由于**站和**站钢结构完全相同,因此在文内不再特别说明。2.编制依据2.1设计图纸序号图纸名称图纸编号1XX市轨道交通**线工程BJCP-03-02-02-03-SS-JG2.2本工程施工及材料依据的规范序号规范名称规范编号1《建筑钢结构焊接技术规程》JGJ81-20022《钢结构防火涂料应用技术规程》CECS24:903《钢结构工程施工质量验收规范》GB50205-20014《涂装前钢材表面锈蚀等级和除锈等级》GB8923-19885《建筑用压型钢板》GB/T12755-916《普通焊接H型钢》YB33017《低合金高强度结构钢》GB/T1591-19948《钢结构高强度螺栓连接的设计、施工及验收规程》JGJ82-919《钢焊缝手工超声波探伤方法和探伤结果分级》(GB11345-89)10《门式刚架轻型房屋钢结构技术规程》CECS102:200311《建筑钢结构焊接技术规程》JGJ81-20023.工程概况3.1工程简介3.1.1工程总体概况项目名称:XX轨道交通**线工程钢结构工程;建设地点:XX轨道交通**线工程**站-**站;建设规模:XX轨道交通**线工程两个车站;4工期要求:计划开工日期2009年12月,计划完工日期2010年2月底;最终应满足总体施工进度计划要求;质量标准:质量全部达到合格标准。3.1.2建设概况本工程为XX轨道交通**线工程03标段-**车站和**站钢结构工程。**站站位于规划南丰路与规划支路**北一街交叉路口南侧。车站走向为南北向,沿规划南丰路设置,为路中高架车站,采用岛式车站型式。本车站设计包括车站起点里程K15+732.24至车站终点里程K15+854.24范围内的主体部分(包括站台层和站厅层)、附属部分(包括出入口和通道,地面变电所及地下水泵房)标准车站底层局部布置变电所,紧靠车站的区间段第一跨为消防水池用房。车站出入口共四个,采用钢结构天桥对称布置。**站位于XX市**区顺沙路南侧,站中里程K17+752.701,车站走向为南北向,沿规划南丰路设置,为路中高架车站,采用岛式车站型式。本工程的钢结构工程范围为2座高架车站站台层的钢结构。3.1.3钢结构设计说明**站和**站钢结构设计说明:3.1.3.1主体结构为钢框架结构**站和**站主体钢结构标高为:-1.900m—13.786m3.1.3.2主要构件的规格型号车站主体钢结构的材质为Q345B,系杆、支撑和檩条的材质为Q235B。1)钢框架构件截面尺寸(钢柱钢梁):工600X200X12X20、工600X200X14X25、H200X150X6X9、H200X200X8X12;2)系杆、支撑和檩条截面尺寸:114X5、Φ219X8、口160X80X4、口200x120x6。⑶螺栓概况本工程中的螺栓包括普通螺栓和高强螺栓。普通螺栓等级为4.6级,螺栓、螺母和垫圈的尺寸及技术条件符合《六角头螺栓—C级》(GB/T5780-2000)、GB/T41-2000和GB/T95-1985中的相关规定。普通螺栓仅用于地脚螺栓、安装临时用螺栓等。高强螺栓等级为10.9级,扭剪型高强螺栓。扭剪型高强螺栓连接副形式与尺寸要求、5技术条件等须符合《钢结构用扭剪型高强度螺栓连接副技术条件》(GB3632~3633)规定。⑷埋件:埋件的板材材质Q235B,规格-16x350x350、-12x250x250;钢筋规格为Ф22的二级螺纹钢。钢筋与埋件板的连接为穿孔塞焊或角焊缝围焊。⑸焊条、焊丝类型:手工电弧焊符合标准:Q235钢《JGJ81-2002》,焊条类型:E43系列;符合标准:Q345钢《JGJ81-2002》,焊条类型:E50系列。CO2气体保护焊CO2气体保护焊采用实心焊丝为ER50系列。⑹焊接质量等级要求1)拼接、对接焊缝和其它全熔透焊缝为一级焊缝;2)其它焊缝质量等级为三级,外观质量标准应符合三级。3)所有焊缝均须进行外观检查。⑺防腐要求:1)钢构件的防锈和涂装应在制作质量检验