施工组织设计编制单位:xxxx有限公司编制时间:二00六年十二月11编制依据和工程概况...........................................................................................31.1编制依据......................................................................................................................31.2编制范围.............................................................................................................31.3编制原则.............................................................................................................31.4工程概况......................................................................................................................41.5执行标准和规范...................................................................................................52施工工艺、方法及重点工序、关键环节技术措施..............................................................62.1施工临时工程..........................................................................................................62.2施工平面布置..........................................................................................................82.3主要施工方案..........................................................................................................83工程质量保证措施...............................................................................................103.1质量管理目标..........................................................................................................103.2质量保证体系和工程质量控制流程(见下图)..........................103.3确保工程质量的措施.........................................................................................134、工程工期、劳动管理及技术保证措施..........................................154.1工程工期保证措施..............................................................................................154.2劳动管理措施..........................................................................................................164.3技术保证措施..........................................................................................................165安全生产保证措施...............................................................................................175.1安全管理机构..........................................................................................................175.2加强安全生产教育,提高安全生产意识...............................195.3安全责任到人......................................................................................................1925.4建立健全安全生产保证体系........................................................................195.5机械设备安全管理措施...................................................................................226文明施工环保保证措施...................................................................................226.1文明施工保证措施.......................................................................................226.2环境保护保证措施.......................................................................................247主要工程施工机具配备...................................................................................257.1主要施工设备.......................................................................................................258施工进度网络图.....................................................................................................258.1施工进度安排原则.............................................................................................258.2工程进度安排........................................................................................................259雨季施工保证措施...............................................................................................2531编制依据和工程概况1.1编制依据xxxx土地复垦整理工程施工图纸及有关设计说明;现行有关土地整理规范、规程、规则及标准;我单位拥有的科技工法成果和现有的管理水平、劳力设备技术能力,以及长期从事建设所积累的丰富的施工经验。1.2编制范围xxxx土地复垦整理项目(二标段)涉及到的田块土地整理工程。1.3编制原则(1)严格中标合同文件所规定的工程施工工期,根据工程的特点和轻重缓急,分期分批组织施工,在工期安排上尽可能提前完成。(2)坚持在实事求是的基础上,力求技术先进、科学合理、经济适用的原则。在确保工程质量标准的前提下,积极采用新技术、新工艺、新机具、新材料、新测试方法。(3)合理安排施工程序和顺序,做到布局合理、突出重点、全面展开、平行流水作业;正确选用施工方法,科学组织,均衡生产。各工序紧密衔接,避免不必要的重复工作,4以保证施工连续均衡有序地进行。(4)施工进度安排注意各专业间的协调和配合,并充分考虑气候、季节对施工的影响。(5)结合现场实际情况,因地制宜,充分利用当地合格资源,合理安排运输装卸与储存作业,减少物资运输周转工作量。(6)坚持自始至终对施工现场全过程严密监控,以科学的方法实行动态管理,并按动静结合的原则,精心进行施工场地规划布置,节约施工临时用地,不破坏植被。严格组织、精心管理,文明施工,创标准化施工现场。(7)严格执行招标文件明确的设计规范、施工规范及验收标准。1.4工程概况(1)工程概况xxxx土地开发复垦项目区位于市中区XX镇,以土地复垦为主,项目区规模为970.73hm2,其中东片区210.75hm2,西片区759.98hm2。项目是由土地复垦、农田水利、田间道路及其他工程组成。其中二标段施工项目为土地整理复垦。平整方案为:项目区原多为荒地和废弃高低不平农田,因此该区的规划重点是荒地开发和煤矿塌陷地复垦。土地的复垦通过沟渠路林的规划,使田块形成外形规正、适合机械作业的耕作田块。对荒坡地的开发主要是修建梯田,梯田方式为水平梯田。5项目区地形条件较好,地势平坦,土地集中连片,开发后主要发展种植业,土地整理后为满足机械作业、灌溉排水和防风的要求,根据规程,耕作田块设计为长500—600m,宽100—200m,田块方向以南北向为主,形状为长方形。典型田块大小设计为500m×100m。沿田块长边方向布设沟渠,一边为灌溉毛渠,另一边为排水农沟;在田块长边方向每隔50m修畦埂,形成100m×50m的小畦,符合现代化节水要求。(2)水文气象项目区属暖温带季风型大陆性气候,四季分明,春季回暖快,夏季炎热多雨,秋季天高气爽,冬季寒冷干燥,年平均气温为13.9度,年平均降雨量850毫米,全年日照时数为2121.3小时,无霜期284.1天左右。湿润度为0.72,全年平均蒸发量为1537.7毫米,主导风为东北风。(3)基础设施建设情况及社会环境项目区内村与村之间有宽敞平整的沥青路(或碾压土路)相连,交通便利。该区属山东电网,村村通三相电及程控电话,电力和通讯设施齐全,市中区XX镇社会稳定,治安状况良好,群众安居乐业,项目区党委、政府非常重视该项目的建设,建立了项目管理机构,落实了管理人员,制订了管理制度,项目建设有了充分的组织保证。1.5执行标准和规范本规范依据水利部、电力工业部、国家基本建设委员会、国家工商行政管理局等颁布的有关技术规范要求执行,必须遵照执行的现行6技术规范有:土地开发整理规划编制规程(TD/1011—2000)土地开发整理项目规划设计规范(TD/T1012—2000)土地开发整理项目验收规程(TD/T1013—2000)水利水电工程施工测量规范(SL52-92)水利水电工程施工组织设计规范(S