第1页共18页目录一、编制依据··························································2二、工程概况··························································3三、工程环境概况······················································4四、本工程安全施工指标及安全组织机构表································4五、安全生产管理制度··················································4六、安全责任目标考核办法··············································6七、文明施工管理措施··················································7八、文明施工管理要求··················································9九、桩坑支护各模板工程················································10十、全封闭安全防护架··················································12十一、用电安全措施··················································14十二、用电管理规定··················································15十三、塔吊的安全措施················································15十四、“三宝、四口”防护措施········································16十五、施工机具安全措施··············································17十六、安全事故应急救援制度··········································17第2页共18页安全施工措施一、编制依据:安全文明生产的施工组织设计是整个施工组织设计的重要组成部分,在整个施工过程中起作重要指导作用。生产是在保证安全的前提下进行的,确保广大职工生命财产安全是企业的头等大事。因此,编制安全文明施工组织设计是相当重要、缺一不可的。编制本工程的安全文明施工组织设计,是根据本项目砌体和框架结构的施工特点,参照国家现行安全文明生产技术规范和配套执行“JGJ-59-99”强制性标准等有关文件。在编制过程中,结合本工程的具体情况、施工工期、工程质量要求高的基本原则进行的。我项目部有信心、有能力创建“文明施工现场”,所以,安全生产、文明施工是我项目部施工管理的重点。在本“安全文明施工组织设计”的内容中,既有安全生产措施、又有文明施工措施。我项目部在该工程中为实现安全文明施工目标,首先对进场的广大职工进行安全知识的三级教育,提高广大职工的的安全生产意识。安全生产、文明施工要从多方面着手进行,除对进场的广大职工进行三级教育外,施工现场还应做一些板报宣传,张贴一些有关安全生产、文明施工的警示标牌之类的口号标语。定期定时组织安全学习,制定安全生产、文明施工的奖惩制度等来提高广大职工的思想素质,使广大职工做到时时有安全生产、文明施工的意识。本工程的重点是在施工过程中,对每个工种,每一道工序都釆取安全、文明施工操作技术交底,正确使用“安全三宝”,施工现场做好“安全用电”、“四口五临边”等的防护工作。主体上升时搭好各层施工区域的全封闭安全防护架网,外装饰搭设好全封第3页共18页闭脚手架等安全防护设施。整个施工过程中参照“建筑安装工程安全生产文明施工资料手册”中的有关要求,做好安全文明施工。主要参照依据如下:《JGJ59-99建筑施工安全检查标准》《JGJ46-2005施工现场临时用电安全技术规范》《JGJ80-91建筑施工高处作业安全技术规范》《JGJ88-92龙门架及井架物料提升机安全技术规范》《JGJ130-2001建筑施工扣件式钢管脚手架安全技术规范》《JGJ33-2001建筑机械使用安全技术规程》《JGJ144-94塔式起重机安全规程》。二、工程概况:工程名称:太原市晋源区采煤沉陷区安置小区建设项目建设地点:本项目位于太原市晋源区儿童医院新院南,周家庄新村以东。结构类型及层数:十八幢地上六层,地下一层砌体结构;一幢地上五层,地下一层砌体结构;一幢地上五层,地下一层框架结构;建筑总面积:75743.3m2质量标准:省标化工程工期:230日历天计划开工日期:2016年02月27日计划竣工日期:2016年10月27日施工范围:土建、水电、消防第4页共18页建设单位:太原市晋源区公用事业管理中心设计单位:太原市城市规划设计研究院监理单位:山西诚信建筑工程监理有限公司三、工程环境概况:本工程为太原市晋源区采煤沉陷区安置小区建设项目,北起府营中街,东至规划路,占地面积为5.29公顷,小区内设18栋6层住宅楼,1栋5层住宅楼,均为砖混结构,村委会为5层框架结构,小区的主次出入口设在东侧和北侧。四、本工程安全施工指标及安全组织机构表:安全施工指标保证遵守国家及地方的安全生产及文明施工的有关规定,确保施工现场整洁有序,杜绝重大伤亡事故和火灾事故。安全生产工作指标为:合格率100%,优良率85%。伤亡指标:轻伤率小于0.2%,重伤率0%,死亡率0%。安全组织机构表为确保工程施工安全达标,创优工作顺利进行,建立以责任制为核心的安全保证体系,成立项目部安全生产领导小组,由项目经理任组长,项目安全员任副组长,组员有安全员、施工组组长,人员分配如下表:组长—冯智慧副组长—宁美泽组员—赵明亮、孙军伟、宁烨鹏、王文萍、董星、段秋莲五、安全生产管理制度:为了保证广大职工的身心健康和生命安全,必须搞好搞好生产、文明施工,第5页共18页昼杜绝一切大小工作事故,做到“宁为安全操碎心,不让事故害人民”,把安全生产、文明施工,保证质量提高效益纳入为重要议事日程。特制定以下安全生产管理制度。1、进入施工现场必须配戴好安全帽,否则每次罚款30-50元。2、做好“四口、五临边”的防护工作,坚持使用安全“三件宝”。各道路口,楼梯通道口,电梯口,预留孔洞必须有明显的安全警示和防护措施。3、严禁酒后上班,严禁穿拖鞋上班,严禁穿裙子上班。4、做好安全防火工作,易燃品附近和栅房内严禁用火和吸烟,做好易燃易爆品的单独存放,专人管理工作。5、施工现场严禁烧电炉取暖或煮食物,木工房严禁吸烟,违者每次罚款50元。6、特殊工种和机电操作工必须持证上岗,起吊设备严禁违章操作,违章指挥。设备维修工、操作工必须做好日检和维护记录,严禁使用操作“带病”的机具设备。7、高空作业严禁穿硬底鞋和带钉易滑鞋。其操作人员应定期体检,凡患高血压、心脏病、贫血病等以及不适于高空作业者,不得从事高空作业。8、非现场人员不准进入施工现场,作业人员未经许可禁止从事非本工种的作业。9、不准带小孩、家属进入施工现场玩耍。10、严禁高处向低处抛掷任何物品和材料、工具,上下递物要逐个传递。11、机电设备必须设专人管理,做好接地接零保护工作,坚持“三相五线制”,各条电源线必须安装漏电保护器。配电箱实行“一机一闸一漏一锁”,每第6页共18页台设备有各自专用开关箱。其距所控设备不得大于3m。12、严禁在起重吊篮下站人。13、在项目经理指导下,由工地安全员定期组织职工安全学习,每周至少一次。并做好学习内容记录。14、对新工人必须实行“三级安全教育”,使其懂得本工种的安全生产基本知识后才能上岗操作。15、绝不使用未满16周岁的童工和在校学生。16、严禁违章指挥,违章作业,冒险蛮干。发现不听指挥违反安全操作规程的人和事应立即停止作业,并对其进行安全再教育,三资教育帮助不改,清退出场。17、当安全与生产发生矛盾时,生产必须绝对服从安全需要。18、拆除脚手架时,从上到下实行“一步一清一传递”,并设专人警戒。19、不准非施工人员在宿舍住宿,严禁打架斗殴、聚众赌博,违者罚款50-100元/人/次。20、安全生产班前会制度。每天上班前由各班组长组织工人对当天各操作部位的安全操作规程作详细讲解并作会议记录,每月交工程项目部备案。六、安全责任目标考核办法:1、对发生的安全事故或未遂事故的处理。由安全员组织相关部门及人员进行处理,并上报各相关部门。2、每天由施工员召集班级长,开一次碰头会,安排工作的同时落实安全生产措施不力。3、每周由项目经理组织全体职工开一次安全生产学习会议,落实安全生第7页共18页产的方针政策及有关文件。4、发现安全隐患立即召开全体在场职工开短会,使其受到安全生产的现实安全教育,并提高安全防范意识。5、安全人员应随时到工地上检查,发现不安全的因素和隐患,立即向项目经理汇报并与施工员、班组长共同商议处理解决办法。6、定期定时开会,不参加的班级长和管理人员要以旷工处理,每次罚款50元/人/次。七、文明施工管理措施:1、根据工程的具体情况,结合特定的外部环境,在进行文明施工管理时应注意以下几点(1)、施工过程中应加强对周边环境保护,生产及生活污水不得乱排放,生产污水经沉砂井沉淀后排入排水沟内,生活污水经临时化粪池处理后排入排水沟内。(2)、建筑弃土、建筑垃圾必须运至指定地点,严禁将施工弃土、建筑垃圾、生活垃圾随处倾倒,必须倾倒入指定垃圾场内。(3)、噪音的控制:施工时应尽量避免夜间施工,一般施工不超过22点钟,必须连续作业,事先报批并安民告示在前。对噪音较大的机械设备必须采取一定消音措施不力。(4)、施工高峰期的控制:为了尽量减少对周边的施工干扰,将施工中大部分砼浇筑安排在假节日期间进行。(周五——周日白天)(5)、选用素质较高的民工,入场后还应加强综合素质教育。2、防止大气污染第8页共18页(1)施工垃圾必须搭设封闭临时专用垃圾道,严禁随意高空抛洒。施工垃圾及时清运,适量洒水,减少扬尘。(2)水泥等粉细散装材料,采取室内或封闭存放,卸运时要采取遮盖措施,减少灰尘。(3)临时食堂和开水房使用瓶装液化气做燃料,避免烟尘污染。3、防止污染(1)现场设置砼砂浆搅拌沉淀池,废水经沉淀后,排出场外污水沟内。施工现场的生产污水采用两级沉淀措施后,排出场外污水沟内。(2)现场存放油料的库房,必须进行防渗漏处理。储存和使用都要采取措施,防止跨、冒、滴、漏,污染水体。(3)施工现场临时食堂必须符合“食品卫生法”的要求,取得“卫生许可证”做好防鼠、防蝇工作,清洗设施齐全、整洁卫生,民工宿舍衽统一管理。有组织地排放生活污水和生产污水,保持现场整洁。4、防止噪音污染有施工中应尽量减少扰民的噪音,对容易产生噪音的钢筋加工、搅拌机、砼振动棒、模板拆除等,釆取以下措施,降低或冲减噪音声源。(1)钢筋加工场安排远离宿舍区,并尽量在白天进行加工。(2)搅拌机工作时应釆用一定隔音屏障。(3)砼振动棒,应向操作者交底昼避免与模板和钢筋接触。(4)模板拆除时应轻拆轻放,以减少碰撞。(5)施工现场指挥生产,釆用无线电对讲机即可进行工作联络,又可减少人为的叫喊声。第9页共18页(6)加强现场运输车辆出入的管理,晚间车辆进入现场禁止鸣笛,对钢管、钢模板的装卸,釆用人工递送的办法,减少金属的碰撞声。5、严格按照市政府《整治》条例做到施工“标准化”、现场“景观化”。6、门前实行(三包),保证现场种类材料堆码有序,保证现场排水沟处于良好状态。7、施工工人操作地点和周围必须清洁、整齐,做到“干活脚下清,活完场地清”。8、钢筋分型号、规格,货架式堆放,度挂牌标明规格,成型钢筋必须标明使用处。9、施工机具要做到摆放整齐有序,机身保持清洁,安全装置灵敏有效,机棚内外保持地面清洁。10、运输各种材料、垃圾等有遮盖和防护措施,防止泥浆等随车辆带出场外,影响市容环境卫生