首开#1开闭所施工组织设计纲要1目录编制依据·······················3第一章、工程概况与工程实施条件分析···········41.1工程特点与工程量······································································41.2建设地点及自然环境··································································61.3施工条件与社会环境分析····························································61.4项目管理特点及总体要求····························································6第二章、项目施工管理组织结构··············72.1项目管理组织结构与职责分工······················································72.2项目经理经历与业绩································································12第三章、质量管理体系··················143.1质量目标及分解·······································································143.2质量管理组织机构····································································153.3质量控制措施··········································································183.4质量检验及持续改进································································24第四章、工期目标和施工进度计划·············274.1工期目标及分解·······································································274.2施工进度计划及编制说明··························································284.3进度计划图表··········································································294.4进度计划风险分析及控制措施····················································29第五章、安全管理体系··················325.1安全和环境保护目标及分解·······················································325.2安全管理组织机构···································································335.3安全风险预测及控制································································425.4安全控制措施··········································································445.5安全文明施工与环境保护及其策划··············································46首开#1开闭所施工组织设计纲要2第六章、工地管理和施工平面布置·············636.1施工平面布置··········································································636.2项目经理部及材料站设置··························································63第七章、施工方法与资源需求计划·············647.1劳动力需求计划及计划投入的施工队伍········································647.2施工机械及施工力量的配置·······················································65第八章、施工准备与协调·················668.1准备工作进度计划····································································668.2技术准备及要求·······································································678.3作业队伍及管理人员准备及要求·················································698.4协调工作(参建方、外部)···························································708.5分包计划与分包管理································································71第九章、工程现场协调经验和能力·············759.1工程项目所在地各方面综合协调能力···········································759.2施工期间还应做好与以下部门的协调关系·····································75首开#1开闭所施工组织设计纲要3编制依据本施工组织设计纲要主要编制依据是:厦门新建翔安X2009G05-A1地块首开#1开闭所工程相关图纸;国家颁布的GB/T50326—2006《建设工程项目管理规范》等有关工程建设施工管理的规程、规范、规定;中华人民共和国“安全生产法”、“劳动法”、“建筑法”、“消防法”、“环境保护法”、“招投标法”、“合同法”、“职业病防治法”、“文物法”等和工程建设有关的法律法规;《国家电网公司输变电工程达标投产考核办法》(2005版)。《建设工程项目管理规范》(GB/T50326-2006)。《国家电网公司输变电工程安全文明施工标准化图册》(试行)。《国家电网公司输变电工程安全文明施工标准化工作规定》(试行)。国家颁布的有关送电线路工程施工的现行标准、规范及规程。我公司对本工程线路沿线地区的实地调查资料;我公司质量、职业健康安全、环境整合型管理体系及相关程序文件;首开#1开闭所施工组织设计纲要4第一章、工程概况与工程实施条件分析1.1工程特点与工程量1.1.1工程特点1.1.1.1工程概况翔安X2009G05-A1地块首开#1开闭所工程1、本工程新建一座首开#1开闭所及二座户外首开#1、#3环网柜,开闭所内设III两段母线分段,2面进线、12面馈线、2面PT+2面PT箱,母联柜,共有21面SAFE高压柜和独立SCB10-50KVA站用变2台;2面直流屏、开闭所设远动屏和通信屏。2、新建二台户外SF6环网柜(带FTU、电动操作)。3、电源引自110KV洪前变914柜(洪置I回)、另一回洪前变941柜(备用八)分别采用YJV22-8.7/10-3*400接至首开#1、#3环网柜901;经首开#1、#3环网柜903柜分别采用YJV22-8.7/10-3*300接至开闭所901柜和902柜。以上各部分的安装调试和相关土建工程。1.1.1.2工程规模(1)设备本工程使用的高压柜型号为SAFE共计21台,直流屏柜2台,户外环网柜型号为SF6计2台。(2)主要材料型号电缆型号为YJV22-8.7/10-3*400及YJV22-8.7/10-3*300,中碱复合玻璃钢管DBJ-N150*7和DBJ-N150*5,MPP管ф160*9.5,球墨铸铁成品井盖ф700(B级),方型球墨铸铁成品井盖1500*700(B级)。1.1.1.4工程承包范围承包范围:二台SF6环网柜、开闭所高、低柜及其高压电缆安装和相关土建工程施工。设备材料供应:设备由甲方招标,投标人采购,其他材料由投标人自行采购。详见工程量清单。1.1.1.5工程施工特点翔安X2009G05-A1地块首开#1开闭所工程施工难度及各项要求都较高,工程规模较大,市政配合部门多,管线复杂,协调工作量大,,时间紧迫,交叉作业面多,安全控制点杂,在施工技术、安全、质保措施中公司将加大力度,合理配置施工资源,优化施工方案,充分发挥有利条件,克服不利因素。(1)土建部分:首开#1开闭所施工组织设计纲要5本工程为:翔安X2009G05-A1地块首开#1开闭所工程管沟、工井、环网柜基础施工以及电缆敷设,新建RM6环网柜#1、#3电缆分别采用YJV22-8.7/10-3*400I回长度为120米,II回为180米引接至洪前变914、941,再由环网柜903柜分别接至首开901、903电缆总长3400米,新建直线ZX-C-3工井型2座,新建直线ZX-C-2工井型10座,新建三通STF13-C-2工井型1座,新建接头JTF-C-1工井型2座,新建埋管N2-12共计768米,非开挖埋管N2-4共计115米。1.1.2工程量表1.1.2-1工程量(土建部分)序号电缆土建起迄点单位数量备注1环网柜基础座2#1、#3环网柜(洪前变)2接头G12、G13直线G1、G2、G4~G8、G11、G14~G17三通G3座173G2至G3工井米50DBJ-N-150*5N2-4(翔安大道)4G2工井至YG3工井米38DBJ-N-150*7N2-12(翔安大道)5G3工井至G12工井米455DBJ-N-150*5N2-12(翔安大道)6G12工井至G13工井米50DBJ-N-150*7N2-12(翔安大道)G13工井至YG22工井米225DBJ-N-150*5N2-12(翔安大道)7G1工井至G2工井米115MPP(Φ160*9.5)N2-4、(新店路口)(2)电气部分本工程电气设备部分:1)高压柜型号为KYN-28共计20台,直流屏1台,监控屏1台,户外环网柜型号为SF6计2台。2)电缆4条:2台环网柜的进线电缆2条,型号YJV22—8.7/10-3*400;开闭所进线电缆2条,型号YJV22—8.7/10-3*300,表1.1.2-2工程量(电气部分)序号名称规格单位数量备注1户外环网柜SF6-4单元(FTU,电动操作)台2进线部分首开#1开闭所施工组织设计纲要62高压电力电缆YJV22-8.7/10-3*400米300进线部分3高压柜KYN28-12面21开闭所4直流屏65AH面2开闭所5高压电力电缆YJV22-8.7/10-3*300米3400开闭所6监控屏面1开闭所1.2建设地点及自然环境1.2.1建设地点本工程主要地点在翔安X2009G05-A1地块首开#1开闭所内,电缆途径美上路、舫阳北路以及首开#1开闭所。1.2.2.2气候本工程所处地区属亚热带湿润季风气候,四季分明,雨量充足,无霜期长。施工期间天气湿热、偶带雨天和台风。1.3施工条件与社会环境分析1.3.1施工条件分析1.3.1.1气候条件对施工的影响施工期间可能是天气湿热、偶带雨天和台风的季节,给户外施工和设备运输造成困难,影响工程施工进度、工期、安全和质量。因而需要考虑各项

1 / 76
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功