武汉市轨道交通三号线土建工程第十一标段地下连续墙钢筋笼吊装安全专项施工方案中铁隧道股份有限公司第1页目录1、工程概况............................................................32、编制依据............................................................33、施工筹划............................................................43.1、施工进度计划......................................................43.2、劳动力安排计划....................................................43.3、机械设备安排计划..................................................53.4、材料进场计划......................................................53.5、施工场地布置......................................................53.6、周边环境情况......................................................54、钢筋笼吊装施工方案..................................................64.1、吊点布置..........................................................64.2、钢筋笼吊点加固....................................................64.3、一字幅钢筋笼吊放方法..............................................74.4、钢筋笼吊放转换过程................................................85、钢筋笼吊装验算......................................................85.1、设备选用..........................................................85.2、吊点设置验算.....................................................105.3、地基承载力计算...................................................125.4、起吊扁担验算.....................................................135.5、钢丝绳强度验算...................................................135.6、主吊把竿长度验算.................................................145.7、吊攀验算.........................................................155.8、吊点处焊缝抗剪强度计算...........................................155.9、卸扣验算.........................................................165.10、吊车双机抬吊系数(K)整体验算...................................165.11、钢筋笼挠度验算..................................................165.12、钢扁担验算......................................................176、吊装施工技术措施...................................................177、起重安全操作规程...................................................187.1、一般规定.........................................................187.2、起重机司机、指挥信号、挂钩工必须具备下列操作能力.................18武汉市轨道交通三号线土建工程第十一标段地下连续墙钢筋笼吊装安全专项施工方案中铁隧道股份有限公司第2页7.3、基本操作.........................................................197.4、吊装.............................................................207.5、吊索具...........................................................208、安全保证体系及措施.................................................218.1、安全保证体系.....................................................218.2、安全保证措施.....................................................219、安全风险管理及风险预案.............................................239.1风险管理的基本步骤.................................................239.2风险管理的工作流程.................................................239.3风险应急机构.......................................................249.4工程风险项目及对策.................................................2410应急救援预案........................................................2510.1、事故类型和危险性分析.............................................2510.2、应急处置基本原则.................................................2610.3、组织机构及职责...................................................2610.4、预防与预警.......................................................3010.5、应急预案培训教育及预案演练.......................................3210.6、应急处置.........................................................3410.7、应急物质与装备保障...............................................3610.8、应急救援流程.....................................................3711、附图..............................................................37武汉市轨道交通三号线土建工程第十一标段地下连续墙钢筋笼吊装安全专项施工方案中铁隧道股份有限公司第3页1、工程概况本工程位于武汉市规划马场角路下,常青路与青年路的交叉路口东侧,与2号线范湖站通过通道换乘。车站为地下双柱三跨三层岛式车站,结构型式均为整体式钢筋混凝土矩形结构,车站全长267m,标准段宽21.6m,基坑深度24.8m,盾构井处基坑深度为25.9m,车站顶部覆土约3.3~3.6m。车站位置见下图1-1:图1-1车站平面位置示意图该工程采用地下连续墙围护,地下连续墙分标准幅和转角幅,标准幅宽5m~6m,共100幅,转角幅宽5.9m~8.75m,共8幅,深度为49m,厚度为1m,总计108幅,钢筋笼长度为46.17m,标准幅钢筋笼净重39t~45t,转角幅钢筋笼净重49t~59t。2、编制依据(1)武汉地铁三号线范湖站施工设计图;(2)《起重吊装常用数据手册》;(3)《钢结构设计规范》(GB50017-2003);(4)《起重机械安全规程》(GB6067-2009);(5)《范湖站总体施工组织设计》;(6)《危险性较大的分部分项工程安全管理办法》的通知(建质[2009]87号);(7)武汉市在安全文明施工、环境保护、交通组织等方面的规定;(8)工程机械使用手册、建筑机械使用安全技术规程(JGJ33-2001)等;(9)现场调查资料及我公司在吊装工程及类似工程的施工经验和技术储备;武汉市轨道交通三号线土建工程第十一标段地下连续墙钢筋笼吊装安全专项施工方案中铁隧道股份有限公司第4页3、施工筹划本工程以系统工程理论进行总体规划,工期以动态网络计划进行控制,施工技术管理以现场动态为基础,质量通过ISO9001质量保证体系进行全面控制,安全以事故树、生物钟进行预测分析、控制。以“加强领导、强化管理、科技引路、技术先行、严格监控、确保工期、优质安全、文明规范、争创一流”为施工指导思想,以“创优质名牌,达文明样板,保合同工期,树企业信誉”的战略目标组织施工。3.1、施工进度计划地下连续墙共108幅,混凝土方量29547m3。地下连续墙成槽施工总体安排时间为2012.6.16~2012.11.15(150天),平均按1天0.7幅地下连续墙考虑,具体时间安排见表3-1。表3-1地连墙施工工期计划序号工作内容用时1530456075901051201351501西盾构井地下连续墙施工20天2标准段地下连续墙施工110天3东盾构井地下连续墙施工20天3.2、劳动力安排计划表3-2劳动力计划表序号工种人数备注1电焊工30持证上岗2钢筋工253电工3持证上岗4专职安全员2持证上岗5吊装指挥员2持证上岗6吊车司机4持证上岗7挂钩司索工2持证上岗8挖掘机司机2持证上岗9成槽机司机6持证上岗10杂工10注:附特种作业人员证件复印件武汉市轨道交通三号线土建工程第十一标段地下连续墙钢筋笼吊装安全专项施工方案中铁隧道股份有限公司第5页3.3、机械设备安排计划连续墙施工使用主要机械设备见表3-3:表3-3主要机械设备进场计划表序号名称型号单位数量进场时间备注1履带吊车280t台12012.062履带吊车150t台12012.063挖掘机PC200台12012.054成槽机金泰SG60/SG50台22012.065卸土车12m3辆102012.066电焊机ZXE-400台202012.067车丝机HGS-40B台82012.068切割机GQ40台22012.069弯曲机GW40台22012.0610调直机GT6/12台22012.063.4、材料进场计划连续墙施工主要材料进场计划见表3-4:表3-4主要进场材料计划表月份钢筋(t)砼(m3)2012年6月85051412012年7月10006060201