目录1编制依据..............................................................................................................21.1现行相关规范、规程.......................................................................................21.2施工图纸及有关文件.......................................................................................22工程概况..............................................................................................................22.1工程概况...........................................................................................................22.2内支撑工程概况...............................................................................................23施工部署..............................................................................................................43.1施工分区及拆撑顺序.......................................................................................43.2内支撑拆除方式...............................................................................................43.3内支撑拆除条件...............................................................................................43.4施工进度计划...................................................................................................54施工准备..............................................................................................................54.1技术准备...........................................................................................................54.2现场准备...........................................................................................................54.3施工机械、劳动力准备...................................................................................65施工方法..............................................................................................................65.1单元块内支撑破除...........................................................................................65.2内支撑拆除流程...............................................................................................75.3施工工序及注意要点.......................................................................................75.3.1成品保护.................................................................................................75.3.2混凝土支撑破除及钢筋切割.................................................................85.3.3格构柱切割.............................................................................................85.3.4混凝土块清运.........................................................................................86安全管理措施......................................................................................................97安全应急预案....................................................................................................107.1成立应急救援小组.........................................................................................107.2应急制度.........................................................................................................117.2.1具体要求...............................................................................................117.2.2具体措施...............................................................................................127.3应急资源.........................................................................................................131编制依据1.1现行相关规范、规程1、《建筑物、构筑物拆除技术规程》2、《建筑机械使用安全技术规程》3、《建筑施工扣件式钢管脚手架安全技术规范》4、《建筑施工高处作业安全技术规程》1.2施工图纸及有关文件1、地下室结构相关图纸;2、基坑支护图纸;3、现场实际情况。2工程概况2.1工程概况本工程由6栋32~33层高层建筑、若干1层商业及一个整体地下室组成。±0.00为23.40m,现场地平均标高约为21.60m。规划用地面积27121平方米,总建筑面积96010平方米,地下室建筑面积34107平方米。2.2内支撑工程概况本工程基坑支护体系采用支护桩+内支撑的形式,内支撑体系采用混凝土角撑+混凝土对顶撑的形式,支撑体系混凝土等级为C40。冠梁截面尺寸为1200×800(b×h),主撑截面尺寸为1000×800(b×h)、800×800(b×h)两种,辅撑截面尺寸为800×500(b×h)。武汉常发建设集团有限公司3本工程换撑采用在结构楼板处设置钢管换撑的形式,换撑钢管为φ169δ8。内支撑平面布置图及与结构楼板相对关系详见下图:一区二区四区三区五区六区3施工部署3.1施工分区及拆撑顺序根据本工程内支撑体系设计原则以及地下一层结构板施工顺序,内支撑拆除顺序为一、三、六区角撑同步进行,最后拆除二、四、五区对顶撑。支撑拆除原则:1、每块支撑拆除时按由中间向两端后退的方式进行;2、拆撑时遵循先拆辅撑、斜撑,再拆主撑,最后破除立柱桩。3.2内支撑拆除方式综合考虑施工工期、安全、周边环境影响及拆撑成本,本工程拟采用“机械拆除为主、人工拆除为辅”的方式进行内支撑拆除。支撑拆除时,在二层地下室顶板上铺跳板、废旧模板或15mm厚钢板作为机械行走平台。破除时采用倒退式,由中间向两端进行破除。每单元块支撑由两台啄木鸟进行拆除,对于节点处及局部机械无法破除区域,采用人工空压机进行破除。对于破除后的混凝土渣土,堆放于地下一层结构楼板处,由塔吊转运出场。支撑内钢筋采用氧气-乙炔人工割除。3.3内支撑拆除条件1、内支撑拆除前确保结构楼板混凝土已浇筑完成,并且达到设计强度要求80%以上;2、内支撑拆除前确保换撑工作已完成,并达到设计要求;3、地下二层满堂架不得拆除,封闭施工洞口或做好防护措施。3.4施工进度计划根据本工程总体施工计划及现场情况,内支撑拆除施工进度计划如下:序号区域支撑拆除时间砼渣清理时间1一区2天3天2二区3天4天3三区3天4天4四区7天10天5五区6天9天6六区2天3天4施工准备4.1技术准备及时编制通过审核的施工方案,在正式施工前进行三级技术交底,即技术负责人→管理人员→施工班组长→操作工人,交底内容应包括工程概况、工程进度、质量目标、施工部署、技术操作要领及注意事项、施工安全、成品保护等。4.2现场准备1、支撑拆除前,地下一层楼板上所有材料清理完毕,支撑梁上所有材料清理完毕,支撑梁上防护栏杆拆除清理归堆。2、地下一层后浇带、墙柱插筋、预留洞口、结构楼板等做好防护措施。3、支撑拆除区域拉设警戒线封闭,并挂设警示牌。派专人看守,严禁非施工人员进入场地。4、支撑拆除区域停止一切其它施工,防止混凝土碎块溅射伤人。4.3施工机械、劳动力准备本工程支撑拆除根据工作面及工期要求,拟投入劳动力及施工机械详见下表:劳动力计划表序号工种数量(人)备注1自卸运输车司机302风镐操作工163混凝土粉碎机操作工4460型啄木鸟司机85汽车吊司机16正铲装载机司机47反铲挖掘机司机88钢筋切割工249普工30废钢筋、混凝土碎块清理、转运施工机械计划表序号名称数量(台)备注1塔吊4配合吊运混凝土碎块2空压机8混凝土支撑破碎350T汽车吊1吊运施工机械4B47风镐8混凝土支撑破碎5气割机12钢筋切割6混凝土粉碎机2混凝土块二次破除760型啄木鸟4混凝土破碎8反铲挖掘机4混凝土碎块装车9自卸运输车15废钢筋、碎块转运10小型正铲装载机2胶轮、2吨,转运混凝土碎块11金刚翻斗车2楼层上运输混凝土碎块5施工方法5.1单元块内支撑破除支撑破除时三个区域同步进行,根据破除顺序,每个区域单元块内支撑破除时按照辅撑、主撑、节点的顺序进行。机械破除、钢筋切割、混凝土碎块清理应充分利场地工作面,合理安排交叉作业。5.2内支撑拆除流程→→↓←←5.3施工工序及注意要点