SH/T3903-B.3工程款支付证书WorksPaymentCertificate工程名称WorksTitle:编号ItemNo:致(建设单位)To(CS/CMC)根据承包合同的规定,经审核承包单位的付款申请和报表,并扣除有关款项,同意本期支付工程款共(大写)(小写:)。请按合同规定及时付款。Accordingtothecontractregulations,afterreviewedthepaymentrequestandreportingtablesanddeductedtherelatedcosts,weagreewiththepaymentof(amountinwords)(say:)。Pleasemakethepaymentperthecontractinatimelymanner.其中Amongwhich:1承包单位申报款为:Therequestedpaymentofcontractor:2经审核承包单位应得款为:Thereviewedpaymentofcontractor:3本期应扣款为:Thedeductedpayment:4本期应付款为:Theduepayment:附件Attached:1承包单位的工程付款申请表及附件ContractorWorksPaymentRequestandAttachments;2项目监理机构审查记录CS/CMCReviewRecords。项目监理机构CS/CMC总监理工程师Chiefsupervisionengineer日期Date