1桥梁工程监理细则1

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

望春工业园区经一路工程监理细则第1页共37页春晓规化三、四、五路桥梁工程监理细则编制:审核:宁波高专建设监理有限公司2006年9月10日望春工业园区经一路工程监理细则第2页共37页目录第一章:总则···················································02第二章:工程概况················································02第三章:监理范围················································02第四章:监理依据及本工程适用标准及规范··························02第五章:施工质量控制············································035.1.监理质量目标··········································035.2.质量控制···············································035.2.1原材料监理细则·································035.2.2排水施工监理细则·······························065.2.3沉井、顶管施工监理细则·························095.2.4沉管灌注桩监理细则····························115.2.5路基塘渣填筑监理细则··························135.2.6水泥稳定碎石层监理细则························165.2.7水泥砼路面面层监理细则························175.2.8钻孔灌注桩监理细则····························195.2.9墩、台帽及盖梁施工监理细则····················255.2.10预应力空心板梁监理细则························275.2.11桥面铺装监理细则······························305.2.12沥青混凝土面层监理细则·······················325.2.13侧石、缘石安装监理细则·······················34第六章;进度控制················································34第七章:投资控制················································35第八章;信息管理················································35第九章:安全控制················································36第十章:监理工作管理制度········································36望春工业园区经一路工程监理细则第3页共37页第一章:总则1.1.适用范围:望春工业园区经一路工程1.2.编制目的:为了确保工程质量,提高监理服务水平,促进监理工作科学化、公正化、标准化、规范化、程序化,特编制本细则。1.3.编制依据:1、国家现行法律、法令、法规、政府批准的工程建设文件及与本工程有关的文件;2、《监理合同》、《监理大纲》、《监理规划》等;3、本工程施工图设计文件与资料;4、已批准的本工程《施工组织设计或施工方案》;5、招投标文件及施工合同;6、其他相关的规范、规程、标准等文件及资料。第二章:工程概况1.1工程名称:春晓规划三、四、五路工程1.2工程地点:北仑区春晓镇1.3业主方:宁波市北仑区建筑工务局1.4设计单位:长春市市政工程设计研究院1.5承包方:东阳利越市政工程有限公司、嘉兴万盛市政开发公司、宁波汇绿园林建设有限公司1.6监理方:宁波高专建设监理有限公司1.7工程概况(主要工程量及技术指标)2.1道路工程:(1)道路工程1)规划三路工程南起规划二路,向北延伸至沿海中路,全长1526.442m,实际施工长度为1459.618m,道路全宽24m。规划三路工程规划等级为城市次干道,设计行车速度为40km/h;交叉口设计行车速度为20km/h;本工程路面均采用混凝土路面,路面结构设计使用年限30年,全路段以规划中心线为道路实施的中心线,本工程道路标准横断面形式为:5m(绿化带)+14m(车行道)+5m(绿化带)=24m,水泥混凝土路面结构为:22cm厚水泥混凝土面层+25cm厚水泥稳定碎石基层+40cm厚塘渣垫层+大于或等于塘渣换填土20cm,水泥混凝土路面检测标准(测定车为黄河JN-150型):水泥混凝土抗折强度为4.5MPa;水泥稳定层顶面计算弯沉值Ls=1.2mm;水泥稳定碎石基层应分两层施工,其中上基层厚10cm,水泥稳定碎石层7天无侧限望春工业园区经一路工程监理细则第4页共37页抗压强度3MPa,压实度97%(重型标准),底基层厚15cm,水泥稳定碎石层7天无侧限抗压强度2.5MPa,压实度95%(重型标准);塘渣顶面计算弯沉值2.6mm,压实度93%(重型标准)。2)规划四路道路工程西起规划三路,向东延伸至笠帽礁河西侧,全长1550m,实际施工长度为1508m,道路全宽24m,全线包括两座桥梁。规划四路工程规划等级为城市次干道,设计行车速度为40km/h;交叉口设计行车速度为20km/h;本工程除在桥梁两端接坡处采用沥青混凝土路面外,其他路面均采用水泥混凝土路面,水泥混凝土路面结构设计年限30年,沥青路面结构设计年限15年,全路段以规划中心线为道路实施的中心线,本工程道路标准横断面形式为:5m(绿化带)+14m(车行道)+5m(绿化带)=24m,水泥混凝土路面结构为:22cm厚水泥混凝土面层+25cm厚水泥稳定碎石基层+40cm厚塘渣垫层+大于或等于塘渣换填土20cm,水泥混凝土路面检测标准(测定车为黄河JN-150型):水泥混凝土抗折强度为4.5MPa;水泥稳定层顶面计算弯沉值Ls=1.2mm;水泥稳定碎石基层应分两层施工,其中上基层厚10cm,水泥稳定碎石层7天无侧限抗压强度3MPa,压实度97%(重型标准),底基层厚15cm,水泥稳定碎石层7天无侧限抗压强度2.5MPa,压实度95%(重型标准);塘渣顶面计算弯沉值2.6mm,压实度93%(重型标准)。规划四路工程桥梁两侧均设20~30m的沥青混凝土路面接坡,沥青路面与混凝土路面间设刚柔相接缝,沥青路面面层采用三层结构,上层为3cm厚细粒式改性沥青混凝土(AC-13C),中层为6cm厚的中粒式改性沥青混凝土(AC-20C),下层为8cm厚的粗粒式改性沥青混凝土(AC-25C),基层为水泥稳定碎石层和塘渣垫层;沥青混凝土底面弯拉强度fcm=2.0MP,顶面回弹弯沉值为0.4mm;粗粒式改性沥青混凝土层压实度为95%(重型标准);水泥稳定碎石基层应分两层施工,其中上基层厚15cm,水泥稳定碎石层7天无侧限抗压强度3MPa,压实度97%(重型标准),底基层厚20cm,水泥稳定碎石层7天无侧限抗压强度2.5MPa,压实度95%(重型标准);塘渣顶面计算弯沉值2.6mm,压实度93%(重型标准)。侧平石采用预制水泥混凝土,一般情况下绿化带侧石高出车行道15cm,绿化带与桥梁人行道间均设20m侧石标高渐变段。望春工业园区经一路工程监理细则第5页共37页规划四路工程地基为盐田,设计地基回弹模量为8MP,如达不到要求,应另作地基处理。3)规划五路道路工程南起规划四路,向北延伸至已建沿海中线,全长958.458m,实际施工长度为898.131m,道路全宽36m,全线包括一座桥梁。规划五路工程规划等级为Ⅲ级城市主干道,设计行车速度为40km/h;交叉口设计行车速度为20km/h;本工程除在桥梁两端接坡处采用沥青混凝土路面外,其他路面均采用水泥混凝土路面,水泥混凝土路面结构设计年限30年,沥青路面结构设计年限15年,全路段以规划中心线为道路实施的中心线,本工程道路标准横断面形式为:5m(绿化带)+11m(车行道)+4m(中央隔离带)+11m(车行道)+5m(绿化带)=36m,水泥混凝土路面结构为:22cm厚水泥混凝土面层+25cm厚水泥稳定碎石基层+40cm厚塘渣垫层+大于或等于塘渣换填土40cm,水泥混凝土路面检测标准(测定车为黄河JN-150型):水泥混凝土抗折强度为4.5MPa;水泥稳定层顶面计算弯沉值Ls=0.8mm;水泥稳定碎石基层7天无侧限抗压强度3MPa,压实度97%(重型标准);塘渣顶面计算弯沉值2.4mm,压实度95%(重型标准)。规划五路工程桥梁两侧均设20~30m的沥青混凝土路面接坡,沥青路面与混凝土路面间设刚柔相接缝,沥青路面面层采用三层结构,上层为3cm厚细粒式改性沥青混凝土(AC-13C),中层为6cm厚的中粒式改性沥青混凝土(AC-20C),下层为8cm厚的粗粒式改性沥青混凝土(AC-25C),基层为水泥稳定碎石层和塘渣垫层;沥青混凝土底面弯拉强度fcm=2.0MP,顶面回弹弯沉值为0.35mm;粗粒式改性沥青混凝土层压实度为97%(重型标准);水泥稳定碎石基层应分两层施工,其中上基层厚15cm,水泥稳定碎石层7天无侧限抗压强度3MPa,压实度97%(重型标准),底基层厚20cm,水泥稳定碎石层7天无侧限抗压强度2.5MPa,压实度95%(重型标准);塘渣顶面计算弯沉值2.4mm,压实度95%(重型标准)。侧平石采用预制水泥混凝土,一般情况下绿化带侧石高出车行道15cm,绿化带与桥梁人行道间均设20m侧石标高渐变段。规划五路工程地基为盐田,设计地基回弹模量为15MP,如达不到要求,应另作地基处理。望春工业园区经一路工程监理细则第6页共37页(2)排水工程1)规划三路工程按雨污水分流设计,雨水管道布置在道路东侧机动车道内,距道路中心线5m,,管径Φ500~Φ1200mm,每隔100m左右设雨水预留井,以便附近雨水接入,经预留井收集后就近排入河道中;污水管道布置在道路西侧机动车道内,距道路中心线5m,,管径Φ400~Φ900mm,每隔150m左右设污水预留井,以便附近污水接入,经预留井收集后,由北向南排入春晓规划二路污水干管内。Φ300钢筋混凝土管(雨水连管),国标Ⅱ级承插管,水泥砂浆接口,i≥1%,碎石基础,管顶覆土大于70cm;Φ500钢筋混凝土管(雨水预留支管),国标Ⅱ级承插管,135º混凝土管道基础,水泥砂浆接口;Φ600~Φ1200mm的雨水主管采用钢筋混凝土管,国标Ⅱ级平口管,180º混凝土管道基础,钢丝网水泥砂浆接口;Φ300~Φ700mm(污水预留管及污水支管)采用钢筋混凝土管,国标Ⅱ级承插管,180º混凝土管道基础,“O”型橡胶圈接口;Φ800~Φ900mm(顶管)采用“F”型钢承口式钢筋混凝土管,纲套环接口,楔型橡胶圈止水;雨水口采用边沟式雨水口(360×480mm)窨井井盖采用复合材料(重型),允许变形(1/500D)荷载≥250KN,破坏荷载≥300KN。2)规划四路工程按雨污水分流设计,雨水管道布置在道路南侧机动车道内,距道路中心线5m,,管径Φ500~Φ1000mm,每隔100m左右设雨水预留井,以便附近雨水接入,经预留井收集后就近排入河道中;污水管道布置在道路北侧机动车道内,距道路中心线5m,,管径Φ400~Φ700mm,每隔100m左右设污水预留井,以便附近污水接入,经预留井收集后,由东向西排入春晓规划三路污水管内,污水管穿越桥梁下河道时采用倒虹管,倒虹管采用HDPE管水平定向钻施工。Φ300钢筋混凝土管(雨水连管),国标Ⅱ级承插管,水泥砂浆接口,i≥1%,碎石基础,管顶覆土大于70cm;Φ500钢筋混凝土管(雨水预留支管),国标Ⅱ级承插管,135º混凝土管道基础,水泥砂浆接口;Φ

1 / 46
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功