楼梯栏杆扶手安装施工方案

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

合肥建工钢结构工程有限公司标书文件1目录第一章编制依据··································2第二章工程概况··································2第三章施工准备··································63.1技术准备···································63.2材料和构件准备································63.3施工人员准备·································6第四章施工工艺和技术措施·····························74.1施工流程···································74.2埋件埋设···································74.3栏杆立柱、水平钢管安装····························74.4扶手找位与划线································84.5扶手弯头配制··································84.6扶手连接预装·································84.7扶手固定···································94.8整修·····································94.9表面刷漆···································9第五章质量保证··································95.1质量标准···································95.2应注意的质量问题······························10第六章成品保护·································10附件1:图集06J403-1第24页···························11附件2:图集06J403-1第75页···························12附件3:图集06J403-1第77页···························13附件4:图集06J403-1第78页···························14附件5:图集06J403-1第161页···························15合肥建工钢结构工程有限公司标书文件2第一章编制依据1、安徽省建筑设计研究院有限责任公司提供的设计图纸、设计变更及相关洽商;2、《建筑工程施工质量验收统一标准》(GB50300-2001);3、《人民防空工程施工及验收规范》(GB50134-2004)4、《建设工程施工现场供用电安全规范》(GB50194-93)5、《施工现场临时用电安全技术规范》(JGJ46-2005)6、《建筑装饰装修工程质量验收规范》(GB50210-2001)7、《工程建设标准强制性条文-房屋建筑部分》2002年版;第二章工程概况1.建设单位:安徽融辉置业有限公司2.设计单位:安徽省建筑设计研究院有限责任公司3.工程名称:金辉悦府1-2#、6-8#楼阳台栏杆、窗内护栏、楼梯扶手工程4.建设地点:合肥市5.工程概况:5.1、1#楼:单栋建筑面积:10830㎡;建筑占地面积:2393.20㎡;建筑总高度:85.90m。建筑层数:地上29层,地下1层。户数:116户。建筑物耐火等级:一级。结构体系:剪力墙结构。建筑物设计使用年限:50年。建筑物抗震设防烈度:7度。1)1000mm高栏杆:使用部位:阳台、空中花园、天井及外廊栏杆;规格:1.1m高;面层:防锈底漆两遍,饰面粉墨喷涂2)600mm高护栏:使用部位:屋顶天井护栏规格:0.6m高,面层:防锈底漆两遍,饰面粉墨喷涂3)窗内组装式护栏:使用部位:窗内护栏,规格:0.9m高,面层:防锈底漆两遍,饰面粉墨喷涂4)楼梯靠墙扶手:使用部位:楼梯内,做法:详图集06J403-1,75/K1,具体要求详建筑图纸合肥建工钢结构工程有限公司标书文件35)工程内容:后置埋件制作安装;栏杆制作:截料、焊接、焊缝打磨刷防锈漆两遍;栏杆现场安装,并粉墨喷涂;栏杆安装完成后保护,并对原土建墙体破坏位置进行恢复5.2、2#楼:单栋建筑面积:15151.43㎡;建筑占地面积:915.53㎡;建筑总高度:86.2m。建筑层数:地上28层,地下1层。户数:156户。建筑物耐火等级:一级。结构体系:剪力墙结构。建筑物设计使用年限:50年。建筑物抗震设防烈度:7度。1)1000mm高栏杆:使用部位:阳台、空中花园、天井及外廊栏杆;规格:1.1m高;面层:防锈底漆两遍,饰面粉墨喷涂2)600mm高护栏:使用部位:室外下自行车库坡道护栏、天井护栏;规格:0.6m高;面层:防锈底漆两遍,饰面粉墨喷涂3)窗内组装式护栏:使用部位:窗内护栏,规格:0.9m高,面层:防锈底漆两遍,饰面粉墨喷涂4)楼梯靠墙扶手:使用部位:楼梯内,做法:详图集06J403-1,75/K1,具体要求详建筑图纸5)工程内容:后置埋件制作安装;栏杆制作:截料、焊接、焊缝打磨刷防锈漆两遍;栏杆现场安装,并粉墨喷涂;栏杆安装完成后保护,并对原土建墙体破坏位置进行恢复5.3、6#楼:单栋建筑面积:12375.2㎡;建筑占地面积:376.7㎡;建筑总高度:97.650m。建筑层数:地上33层,地下1层。户数:132户。建筑物耐火等级:一级。结构体系:剪力墙结构。建筑物设计使用年限:50年。建筑物抗震设防烈度:7度。1)1000mm高栏杆:使用部位:阳台、空中花园、天井及外廊栏杆;规格:1.1m高;面层:防锈底漆两遍,饰面粉墨喷涂2)600mm高护栏:使用部位:屋顶天井护栏、2层北侧外廊栏杆,规格:0.6m高;面层:防锈底漆两遍,饰面粉墨喷涂3)750mm高护栏:合肥建工钢结构工程有限公司标书文件4使用部位:3层北阳台、2-3、19-21轴南阳台栏杆;规格:0.75m高;面层:防锈底漆两遍,饰面粉墨喷涂窗内组装式护栏:4)窗内组装式护栏:使用部位:窗内护栏,规格:0.9m高,面层:防锈底漆两遍,饰面粉墨喷涂5)楼梯靠墙扶手:使用部位:楼梯内,做法:详图集06J403-1,75/K1,具体要求详建筑图纸6)工程内容:后置埋件制作安装;栏杆制作:截料、焊接、焊缝打磨刷防锈漆两遍;栏杆现场安装,并粉墨喷涂;栏杆安装完成后保护,并对原土建墙体破坏位置进行恢复5.4、7#楼:单栋建筑面积:11243.3㎡;建筑占地面积:339.09㎡;建筑总高度:97.650m。建筑层数:地上33层,地下1层。户数:132户。建筑物耐火等级:一级。结构体系:剪力墙结构。建筑物设计使用年限:50年。建筑物抗震设防烈度:7度。1)1000mm高栏杆:使用部位:阳台、空中花园、天井及外廊栏杆;规格:1.1m高;面层:防锈底漆两遍,饰面粉墨喷涂2)600mm高护栏:使用部位:屋顶天井护栏、2层北侧外廊栏杆;规格:0.6m高;面层:防锈底漆两遍,饰面粉墨喷涂3)750mm高护栏:使用部位:3层北阳台、2-3、19-21轴南阳台栏杆;规格:0.75m高;面层:防锈底漆两遍,饰面粉墨喷涂4)窗内组装式护栏:使用部位:窗内护栏,规格:0.9m高,面层:防锈底漆两遍,饰面粉墨喷涂5)楼梯靠墙扶手:使用部位:楼梯内,做法:详图集06J403-1,75/K1,具体要求详建筑图纸6)工程内容:后置埋件制作安装;栏杆制作:截料、焊接、焊缝打磨刷防锈漆两遍;栏杆现场安装,并粉墨喷涂;栏杆安装完成后保护,并对原土建墙体破坏位置进行恢复5.5、8#楼:单栋建筑面积:12959.36㎡;建筑占地面积:589.31㎡;建筑总高度:97.75m。建筑合肥建工钢结构工程有限公司标书文件5层数:地上33层,地下1层。户数:132户。建筑物耐火等级:一级。结构体系:剪力墙结构。建筑物设计使用年限:50年。建筑物抗震设防烈度:7度。1)1000mm高栏杆:使用部位:阳台、空中花园、天井及外廊栏杆;规格:1.1m高;面层:防锈底漆两遍,饰面粉墨喷涂2)600mm高护栏:使用部位:屋顶天井护栏、2层北侧外廊栏杆;规格:0.6m高;面层:防锈底漆两遍,饰面粉墨喷涂3)500mm高护栏:使用部位:室外下自行车库坡道护栏;规格:0.5m高;面层:防锈底漆两遍,饰面粉墨喷涂4)窗内组装式护栏:使用部位:窗内护栏,规格:0.9m高,面层:防锈底漆两遍,饰面粉墨喷涂5)楼梯靠墙扶手:使用部位:楼梯内,做法:详图集06J403-1,75/K1,具体要求详建筑图纸6.工程内容:后置埋件制作安装;栏杆制作:截料、焊接、焊缝打磨刷防锈漆两遍;栏杆现场安装,并粉墨喷涂;栏杆安装完成后保护,并对原土建墙体破坏位置进行恢复7.工程材料:图纸设计要求:60×60×3钢管、60×40×3钢管、50×50×4钢管、50×25×3钢管、50×40×3钢管、40×40×2钢管、30×30×2钢管、20×20钢管、预埋件详图集06J403-1,161/M5等工作联系单调整内容:20×20钢管调整为20×20×1.2钢管;60×60×3钢管调整为60×40×2.5钢管;50×25×3钢管调整为50×25×2.5钢管;50×50×4钢管调整为50×50×2.5钢管合肥建工钢结构工程有限公司标书文件6第三章施工准备3.1技术准备施工前应熟悉图纸、设计变更、图集相关要求,了解相关安全、质量规范,了解掌握栏杆、扶手的施工工艺,找出施工中安全质量施工注意点,做到施工中重点突出、心中有数。编制施工方案用以指导施工,逐级进行技术交底。3.2材料和构件准备3.2.1材料准备1、木制扶手一般用硬杂木加工成规格成品,其树种、规格、尺寸、形状按设计要求。木材质量均应纹理顺直、颜色一致,不得有腐朽、节疤、裂缝、扭曲等缺陷;含水率不得大于12%。弯头料一般采用扶手料,以45°角断面相接,断面特殊的木扶手按设计要求备弯头料。2、其他材料:木螺丝、砂纸、加工配件、油漆。3.2.2机具准备1、电动机具:手提电钻、小台锯。2、手动工具:木锯、窄条锯;二刨、小刨、小铁刨;斧子、羊角锤、扁铲、钢挫、木挫、螺丝刀;方尺、割角尺、卡子等。3.2.3作业条件1、楼梯间墙面、顶棚等抹灰全部完成。2、金属栏杆或靠墙扶手的固定埋件安装完毕。3.3施工人员准备1、施工人员必须熟悉相关规范、图集的要求及栏杆、扶手安装工艺要求。施工前进行详细技术交底和专业培训,选取一层楼梯间进行样板施工,确认工序及做法后进行大面积施工。2、坚持特殊工种持证上岗制度,并于施工前进行教育培训。3、实行三级交底制度,即:技术部对项目部相关管理人员和分包技术人员进行方案交底;工程部对分包工长、班组长进行交底;分包工长、班组长对楼梯栏杆扶手施工工人合肥建工钢结构工程有限公司标书文件7进行技术交底。第四章施工工艺和技术措施4.1施工流程(1)不靠墙栏杆扶手埋件埋设→栏杆立柱安装→扶手找位与划线→扶手弯头配制→扶手连接预装→扶手固定→扶手整修→栏杆立柱、扶手表面刷漆。(2)靠墙栏杆扶手埋件埋设→水平钢管安装→扶手找位与划线→扶手弯头配制→扶手连接预装→扶手固定→扶手整修→栏杆立柱、扶手表面刷漆。4.2埋件埋设(1)不靠墙楼梯栏杆下部连接须在每个踏步上埋设埋件,由于现场楼梯已施工完成,并未埋设埋件。故须在每个踏步上按照图集06J403-1类型要求进行埋件定位,预埋件详图见下图。其中膨胀螺栓采用4A6,锚入混凝土深度35mm。(2)靠墙扶手埋件间距按照设计要求不大于1200mm进行定位,由于结构、砌筑墙已经施工完成,并未埋设埋件。当预埋件位置在混凝土结构上时,采用膨胀螺栓锚入结构中,预埋件具体要求如(1)所述;当预埋件位置在砌筑墙上时,须从砌筑墙掏出砌块,安装好埋件,埋件按设计指定图集选用,再用C

1 / 15
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功