目录第一章工程建设会议制度··········································································1第二章工作联系单管理·············································································2第三章工程环保、水保管理·······································································4第四章工程质量管理················································································5第五章工程进度管理··············································································10第六章工程安全管理··············································································13第七章工程计量支付、变更管理·······························································16第八章工程施工、监理人员管理·······························································23第九章工程试验检测管理········································································24第十章工程物资管理··············································································26第十一章标化工地建设、文明施工管理······················································28第十二章工程分包、劳务管理···································································31第十三章工程档案管理···········································································32第十四章劳动立功竞赛············································································34第十四章劳动立功竞赛············································································34第十五章廉政建设··················································································35第十六章工程索赔管理············································································37附件一:在建公路工程施工分包及劳务用工管理办法········································40附件二:xx公路工程(xx段)项目立功竞赛考核办法······································55附件三:民工工资、环保、水保、档案、安全保证金管理办法····························62附表:·····································································································63第一章工程建设会议制度一、工地会议工地会议旨在检查、监督承包人对本项目承包合同的执行情况,协调有关各方的关系,促进各方认真履行工程承包合同所规定的职责、权利和义务。每次工地会议之前,监理办应提前3天向参加会议的各方发出通知或邀请信,并说明会议召开时间和主要议题。工地会议分第一次工地会议和施工过程中的工地例行会议(简称工地例会)。会议由监理主持,参加人员包括监理、承包人(包括主要分包单位),邀请业主、质量监督机构、沿线指挥部代表、设计代表及其它有关人员。工地会议内容应认真记录,并在3天内形成会议纪要,发送有关各方予以签认。(一)第一次工地会议一般在下达项目开工令后的适当时间召开。(二)工地例行会议一般每月召开一次,在本月25日至次月5日期间召开。2、除会议常规内容外,承包人还应汇报民工工资、安全生产、环境保护等内容。二、工程建设管理工作会议一般每季度召开一次,具体时间由业主确定。旨在监督、管理承包人和监理过程中合同的执行情况,协调有关各方的关系,促进工程施工优质高效地进行。会议由业主组织召开,参加人员包括建设、设计、监理、承包人及有关人员。第二章工作联系单管理第一节总则第一条为促进本项目业主、设计、监理、承包人四方单位之间工作联系单(承包人报告单、监理报告单)传递过程的规范化、标准化、制度化,提高办事效率,充分保证整个施工过程能及时、顺利进行,依据本项目《招标文件》中的有关条款规定,结合本项目实际,特制定本规定。第二条工作联系单(承包人报告单、监理报告单),是指业主、设计、监理、承包人在工程建设实施过程中协商解决有关问题的一种载体。第三条业主、设计、监理、承包人之间的日常往来文件采用工作联系单形式(承包人报告单、监理报告单),并遵循以统一格式、统一程序进行传递的原则。第二节传递与报批程序第四条业主、设计、监理、承包人每月对工作联系单报批情况进行总结,并在工地例会上予以沟通。第五条工作联系单(承包人报告单、监理报告单)的传递过程必须按承包人——监理——业主——(设计),不得无序递送。第六条承包人报告单首先应报送监理审查,监理提出明确的书面审查意见后,通过监理报告单形式连同承包人报告单报送业主。第七条所有报送到业主单位的监理报告单、承包人报告单必须统一送至业主专职人员进行签收,并按工作程序办理,待处理完毕后由业主回复有关单位,回复时也须办理签收手续。第八条特殊事项如涉及重大变更或征迁处理等原因不能及时处理的,业主应明确告知相关单位。第九条本项目所有对设计文件的变更,均以业主单位批复或下发的工作联系单为依据,各监理、承包人在收到业主单位批复或下发的工作联系单后方可实施。第三节格式第十条工作联系单(承包人报告单、监理报告单)的名称统一定为xx公路工程(xx段)****单。第十一条承包人编号规定为合同号.顺序号,如1一001;监理可在合同号前加监,如监1-001;设计单位则以设计代替合同号,如设计-001。第十二条填写内容时要求字迹清晰端正、内容规范完整,使用电脑打印。承包人报告单“联系内容”一栏中要求填写简明、扼要,能充分表达联系事项中的主要内容;应清楚表达问题的产生原因和处理方案,必要时应在附件中附草图,标出详细的几何尺寸、测量数据、篇幅不够时可另附页;要求进行设计变更时,必须要有主要工程数量及变更金额的估算。监理报告单中,要求监理对承包人所报工作联系单内容仔细审核,并提出明确处理意见。第四节审核时间第十三条承包人报告单递交监理办,监理办一般应在3天之内审核完毕,并通过监理报告单形式连同承包人报告单递交业主单位,业主单位将根据具体情况进行处理。第十四条联系单发出后,若涉及到图纸变更的,应立即修订原图纸。第三章工程环保、水保管理第一节总则第一条为保证xx公路工程(xx段)的顺利实施,并顺利通过环保、水保专项验收,根据合同的有关规定以及有关法律法规,制定本办法。第二节具体要求第二条承包人应在施工组织设计、施工方案中根据设计文件和相关规定制定施工环境保护、水土保持等措施,并经监理审查同意。第三条承包人、监理应落实环境保护、水土保持责任人,并报备业主。第四条承包人、监理应对相关人员积极开展环保、水保教育,并建立相关台账。第五条监理在巡视、旁站中,应随时检查承包人制定的环境保护、水土保持等措施的落实情况,重点对扬尘、噪音、运输洒漏、废水处理、职业危害等内容进行监控督促。第六条在梁板安装前,承包人应完成河道疏浚、防洪堤和护岸恢复、场地平整、桥下通道并经监理验收。河道疏浚、防洪堤和护岸恢复完成后必须经地方水利部门验收并出具书面意见,验收意见同时报备业主。第七条在工程交工验收后3个月内,承包人应完成相关借地复耕工作,并经当地有关政府、部门验收并出具书面意见,验收意见同时报备业主。第三节责任追究第八条承包人未在规定期限内完成借地复耕、河道疏浚、防洪堤和护岸恢复、场地平整等内容,业主将委托其他单位进行实施,相关费用在该承包人保证金账户予以支付。第九条由于施工影响造成房屋震裂、环境污染、农作物受损等情况(查证属实的),承包人未及时自行妥善处理的,业主将委托相关单位进行处理,相关费用在该承包人保证金账户予以支付。第四章工程质量管理第一节总则第一条为确保xx公路工程(xx段)的工程建设质量,根据合同的有关规定及有关法律法规,参照浙江省交通厅浙交[2004]311号《关于印发浙江省高速公路创精品公路创精品工程实施意见(试行)的通知》和浙交〔2008〕232号《关于进一步加强我省高速公路工程质量管理的意见》制定本办法。第二节质量管理具体要求第二条承包人应在签订合同协议书后28天内,向监理提交实施性的施工组织设计。监理办应审查施工方案和质量保证措施等内容的针对性和有效性,并应在收到该计划后的14天内审查同意或提出修改意见,并报业主备案。第三条重大施工方案、施工工艺,如大型互通跨越、预制场设置、三级及以上航道跨越等情况,监理审核后,应报业主批准。预制场设置完成必须经业主、监理验收合格后方可进行构件预制施工。第四条切实推行首件工程认可制。施工单位首次进行桩基、立柱和预制梁等构件施工时,监理及业主应对其各项质量指标进行综合评价,施工单位得到认可后方可进行规模生产,以预防和纠正后续规模生产可能产生的各种质量问题。第五条建立、健全质量管理体系和组织机构,完善质量责任制。承包人应建立项目经理为责任人的质量管理体系。承包人应建立质量控制自检系统,按投标文件承诺设质检部门,并配备专职质检工程师和质检员,明确各级职责。监理在开工前和施工过程中对以上内容进行检查,如承包人未完成以上各项制度,应督促承包人完善。第六条施工机械、设备。承包人应按照投标文件的承诺配备相应数量、规格、型号的施工设备、机械,并保证其处于完好的可用状态。监理办应对承包人进场的施工机械和设备进行核查,确保其按合同执行。第七条测量成果的复测。承包人进场施工前应对移交的导线点、三角点等测量控制点进行复核,并对中线进行复测,复核结果报驻地办核准,并报业主备案。监理组织所辖各承包人在每季度第一个月上旬对导线点及水准点进行复测;监理在此基础上,每季度独立组织一次导线点及水准点的联测工作,并将相关联测记录报业主备查。第八条技术交底。施工前由业主组织设计单位对监理、承包人等进行施工图的技术交底。承包人应对现场施工人员进行质量教育,强化质量意识,开工前进行技术交底,严格执行规范和操作规程。第九条承包人在分项、分部工程开工报告中应有质量控制的重点部位、工艺,并提出相应的对策,以采取有效的措施进行预先控制,以防止在施工中发生质量问题。在施工中认真执行三检制度,即:自检、互检、工序交接检验制度,要根据合同的规定切实做好隐蔽工程的检查工作。对于重要的隐蔽工程在覆盖前应进行摄像或照相并保存现场记录。第十条监理、承包人应确保规范规定的检验、抽检频率,现场质检的原始资料必须真实、准确、及时、可靠