范文范例精心整理word完美格式目录1.绪论..............................................................11.1选题的背景和意义..............................................11.2研究的内容....................................................12.施工前的各项准备工作..............................................22.1施工准备......................................................22.2主要机械设备、检测实验仪器选型和配置准备......................22.3劳动力准备....................................................33.栈桥及施工平台施工................................................43.1栈桥施工......................................................43.2平台施工......................................................74.钻孔桩基础施工...................................................104.1钻孔桩施工工艺...............................................104.2冲击钻成孔...................................................124.3钢筋骨架的制作与安装.........................................204.4灌注水下混凝土...............................................214.5钻孔桩质量检验...............................................245.施工过程中的质量控制.............................................245.1质量目标.....................................................245.2西江特大桥质量管理组织机构...................................245.3质量保证体系.................................................245.4质量保证的技术措施...........................................246.钻孔灌注桩常见施工质量问题及防治措施.............................266.1钻进过程中的问题.............................................266.2钻孔桩断桩常见事故及处理办法.................................307.小结.............................................................33参考文献........................................................34致谢..............................................................35附录一.............................................................37附录二.............................................................38附录三.............................................................39附录四.............................................................40附录五.............................................................41范文范例精心整理word完美格式中文摘要灌注桩系是指在工程现场通过机械钻孔、钢管挤土或人力挖掘等手段在地基土中形成桩孔,并在其内放置钢筋笼、灌注混凝土而做成的桩。而钻孔灌注桩基础作为深基础的一种,由于它具有适应性强、对邻近建筑物影响较小、抗震性能强、施工噪音小、无振动、所需设备简单、操作方便、施工安全等优点,在世界范围内得到了广泛的应用。本文以西江特大桥施工时所采用的冲击钻孔灌注桩技术为依据,探讨研究其施工工艺流程、操作要点和相应的工艺标准以及浅谈施工前的各项准备和施工过程中的质量控制。关键词:钻孔灌注桩施工工艺探讨范文范例精心整理word完美格式AbstractFillingpileintheengineeringdepartmentistopointtobymechanicaldrilling,steeltubesoilsqueezeorhumanminingmethodsuchasthefoundationsoilformedinthepilehole,andinitsplace,pouringconcreteandreinforcingcagemadeofpile.Boredpilefoundationasakindofdeepfoundation,becauseithasstrongadaptability,ontheadjacentbuildingsonlyhavelittleinfluence,seismicperformanceisstrong,constructionnoiseissmall,novibration,theequipmentissimple,convenientoperation,constructionsafetyandotheradvantages,intheworldscopewithinawiderangeofapplications.Inthispaper,basedontheconstructionofthelargebridgewhentheimpactofthecast-in-placepileonlyusetechnologyasthebasis,researchfromtheconstructiontechnologyandprocessflow,thekeyoperationandthecorrespondingprocessstandards,andonthepreparationfortheconstructionandtheconstructionprocessofqualitycontrol.KeywordsCast-in-placepileConstructiontechnologyDiscussion范文范例精心整理word完美格式范文范例精心整理word完美格式西江特大桥桩基础冲击钻孔灌注桩施工工艺探讨1.绪论1.1选题的背景和意义1.1.1选题的背景在中国高速铁路快速发展的情况下,当今铁路建设当中,越来越多的线路需要跨河过江,这就使得当今的中国建设者们需要一种安全、高效、保质的施工方法来进行桥梁的施工。西江特大桥是新建广州至珠海铁路工程复工SG-3标段的重点工程之一,西江特大桥位于珠三角的冲积平原区,地处佛山市南海区与江门鹤山市。西江特大桥桥址处地地势平缓,途经大量鱼塘并跨越国家航运主航道、一级航道——西江。结合沿线的气候环境特点和工程特征,分析了国内外应用较为成熟的几种桩基础施工的技术特点、适应性和施工方法,提出了冲击钻孔灌注桩施工技术。1.1.2意义因钻孔灌注桩施工具有以下优点(1)机械化作业,施工相对简单;(2)钢筋笼、砼可集中加工配送,也可以现场加工,作业方便;(3)施工速度快,工艺成熟,相对来说施工过程中安全可靠;(4)施工时基本无噪音、无振动,对周边居民、建筑影响危害小。随着科技的发展,机械的进步更新,钻孔灌注桩技术从100多年前被发明以来,取得了巨大的进步,特别是在高层、超高层建筑物和重型构筑物中被世界各国广泛的应用。近年来,随着我国经济和科技的发展,各种高层、超高层建筑以及跨江、跨海特大桥不断修建,钻孔灌注桩技术在我国得到广泛的应用,我国的钻孔灌注桩技术也取得了长足的进步。所以,研究钻孔灌注桩的施工工艺具有重大意义。1.2研究的内容本设计主要研究:范文范例精心整理word完美格式(1)施工前的各项准备工作;(2)栈桥及平台施工;(3)钻孔桩基础施工;(4)施工过程中的质量控制;(5)钻孔灌注桩常见施工质量问题及防治措施。本设计以西江特大桥所采用的冲击钻孔灌注桩施工工艺为基础,探讨和浅述了钻孔灌注桩施工的重要过程。2.施工前的各项准备工作2.1施工准备2.1.1图纸审核和资料准备首先核对西江特大桥设计资料,组织技术人员对桥梁位置、水文状况、控制桩等进行全面详细的调查核实,组织有关技术人员熟悉施工图纸、施工技术规范、质量检验标准和建设单位及地方政府有关环保、文明施工、交通管制等文件;认真复核施工图纸和工程数量,结合现场的施工环境和实际情况,编写详细实施性施工组织设计,提出具体详细的施工计划、施工工艺及有关保证措施,按程序抱监理审批,并进行施工技术交底。2.1.2人员、机械、材料的准备本工程所需的各类型的专门管理人员已到位;工程所需的机械已做好进场准备;施工所需的主要物资等已做好招标订货工作;主要周转料已经做好准备。2.1.3测量控制网的复测开工前对设计提供的施工导线点等进行复测,其精度满足施工测量规范要求;同时对设计提供的导线点加以保护,并按施工图对导线点进行加密,并埋设固定桩,做好标记。复测资料和施工控制网经监理验收符合要求后,再进行桥梁施工的放样工作。2.2主要机械设备、检测实验仪器选型和配置准备2.2.1投入主要机械设备表投入主要机械设备表见附录一。范文范例精心整理word完美格式2.2.2配备的实验和检测仪器设备表配备的实验和检测仪器设备表见附录二。2.3劳动力准备2.3.1劳动力投入原则结合本工程特点,本工程的劳动力按以下原则配备。(1)根据阶段工期安排及各分项工程开工先后次序,分批组织劳力进场,做到劳力不窝工。(2)关键岗位及特种作业人员要求技术熟练,全部持证上岗。(3)根据施工工期及质量要求确定施工工艺,按施工工艺定机械设备,按设备需要确定操作人员,确保工程施工连续进行,减少劳动力浪费。2.3.2劳动力投入计划劳动力计划表见附录三。劳动力动态分布图1000500人200人2011年2012年3季度4季度1季度2季度3季度图1范文范例精心整理word完美格式3.栈桥及施工平台施工3.1栈桥施工3.1.1栈桥结构示意图图2栈桥制动墩结构示意图图3栈桥非制动墩示意图范文范例精心整理word完美格式3.1.2栈桥施工工艺流程图栈桥施工工艺流程图图43.1.3栈桥施工方法及技术措施1、钢管桩制作①钢管桩为购买成品螺旋焊缝钢管桩现场焊接接长,供货长度一般为12m。②钢管桩接长定位在专门台架上进行,并经拉接线定位确认后方可接长。管节对口切平保持在同一轴线上进行。③钢管需经验收合格后方能吊上船仓,对于锈蚀、破损严重的管节,坚决不予使用。④钢管桩焊接接头打坡口后采用手工焊,并切割同等直径的管头作为钢管之间的加强钢板。⑤根据吊机的起重性能,确定每节钢管桩拼接长度。2、栈桥桥台施工栈桥桥台基础采用90KW振动锤沉