1六施工组织设计....................................................11.总体施工组织布置及规划........................................11.1工程概况................................................11.2工程特点及重难点........................................41.3施工组织机构及队伍安排..................................52.各分项工程进度计划............................................72.1总体布置及规划..........................................72.2各分项工程施工顺序......................................83.资源配置计划.................................................93.1技术负责人..............................................93.2其他主要人员............................................93.3施工设备................................................93.4试验、检测仪器设备......................................93.5劳动力组织..............................................93.6临时工程用地计划.......................................103.7电力需求计划...........................................104.施工总平面布置..............................................105.施工方案与技术措施...........................................105.1路基工程...............................................105.2隧道工程...............................................215.3桥梁工程...............................................355.4维修整治工程...........................................615.5保通保畅工程...........................................725.6控制性及重点工程的施工方案.............................106质量保证系统及措施...........................................746.1质量管理体系...........................................746.2试验检测机构及检测制度.................................806.3质量保证措施...........................................8227.安全保证体系及措施..........................................977.1安全保证体系及组织机构.................................977.2安全生产保证措施.......................................997.3安全风险管理及应急预案................................1167.4确保既有线行车安全的措施..............................1208.施工环保、水土保护目标及措施..............................1218.1环境保护、水土保护目标................................1218.2施工环保、水土保持管理组织机构........................1218.3施工环保、水土保持保证体系............................1218.4施工环境保护、水土保持措施............................1228.5节能减排优化措施......................................1268.6施工水土保持措施......................................1279.工程进度计划与措施.........................................1279.1工期保证体系..........................................1279.2工期保证措施..........................................12810.文明施工保证体系及保证措施................................12810.1文明施工组织机构与框图...............................12810.2文明施工保证措施.....................................12811.工期保证措施..............................................12911.1工期管理组织机构.....................................12911.2工期保证体系.........................................13011.3保证工期的措施.......................................13011.4工期风险管理.........................................13312.地下管线及其他地上地下设施的保护加固措施....错误!未定义书签。12.1地上设施的保护和加固...................错误!未定义书签。12.2地下设施的保护和加固...................错误!未定义书签。12.3供水管泄漏抢修措施.....................错误!未定义书签。13.项目风险预测与防范,事故应急预案...........................13413.1项目风险预测与防范...................................134313.2事故应急预案.........................................13414.其他应说明的事项..........................................13514.1施工后期的场地恢复措施...............................13514.2廉政保证措施.........................................13514.3按期支付保证措施.....................................13614.4缺陷责任期维护方案...................................136附表一拟投入本标段的主要施工设备表...............................138附表二拟投入本标段的试验和检测仪器、测量设备表..................146附表四施工进度网络图............................................148附表五施工总平面图..............................................149附表六临时用地表................................................1501六施工组织设计1.总体施工组织布置及规划1.1工程概况1.1.1概述本项目国道213线映秀至汶川段公路“7.9”山洪泥石流灾害恢复重建工程B3标段,地处青藏高原东缘与四川盆地西北边缘交错触带,地形复杂,地势西北高、东南低。东南为龙门山,中西部为邛崃山脉。工作区多为高山峡谷区,山势陡峭。汶川(海拔1100m)。主要河流:岷江;经过的主要村镇有:草坡乡、羊店村、绵虒镇、玉龙乡、威州镇。本合同段里程K25+300~K53+455,路线全长28.155千米。工程施工内容主要包括:隧道、桥涵、路基、维修整治及防护等工程量清单及招标图所示全部内容。主要工程数量见表1.1.1.1。表1.1.1.1主要工程数量表1.1.2主要技术标准项目采用三级公路标准,设计速度40公里/小时,路基宽度8.5米,桥梁9米;汽车荷载等级:全线新建桥涵设计汽车荷载等级采用公路一I级,利用改建汽超-20,挂-120;设计洪水频率:大中桥1/100,其它1/50;新建隧道建筑限界9×5m,利用改建8.5×5m;新建交通安全设施A级,利用改建B级;其它技术指标符合《公路工程技术标准》(JTGB01-2003)的规定。序号指标名称单位数量备注1路线长度km28.1552路基土石方m3195933挖5792;填1901413路基路面排水、防护工程m3596954大中桥新建m/座676.5m/3草坡岷江大桥、殷家坝岷江大桥、羊店岷江大桥加固利用m/座4141m/235涵洞新建座9加固利用座266隧道新建m/座3644m/2燕子岩长隧道、羊店长隧道加固利用m/座2314/2原草坡隧道、单坎梁子隧道7隧道联系道座695/28明洞座30/1瓦窑沟明洞21.1.3自然条件(一)、气候项目位于地震核心灾区,气候属于大陆性高原季风气候,气温随海拔由低到高而相应降低。气候从温带、寒温带、寒带,呈明显的垂直性差异,年平均温度6.30C。年降水量753mm,年均日照2000小时以上,年均无霜期120天,年均17m/s以上大风雪40次,常年主导风向为西北风。灾害性的雨水天气导致的次生灾害频发,出现时段为6月至9月,共4个半月,约130天,最为严重时段为7月至8月,共2个半月,约70天,常阻断交通道路。(二)、水文工作区河流主要属岷江水系,岷江支流众多,水量丰富。丰水期6~9四个月占年径流量的55%,1973年6月最大流量1146m3/s,枯水期十二月至来年三月,其中1971年2月最小流量123.74m3/s,多年平均径流模数18.821/s·Km2。(三)、极其复杂的地质构造1、地层岩性项目路线经过区地层有元古界、古生界、中生界及新生界,沿线第四系松散堆积层、沉积岩、岩浆岩和变质岩有出露。地层区划分属川西地层区龙门分区和马尔康地层分区。基岩种类繁多,岩性复杂,分布面积大的地层主要为三迭系(T),第四系松散沉积物仅零星分布与山坡、沟谷和山前地带。2、地质构造构造主体位于龙山陷褶断束、茂汶~丹巴地背斜、马尔康地向斜三个三级构造单元,主要构造为九顶山北东向构造、薛城S型构造、族郎帚状构造。主要断裂有茂汶断裂、映秀断裂。3、不良地质地段管段地形起伏较大,工程地质条件复杂发育的不良地质及特殊地质现象主要为滑坡、崩塌、泥石流、地震等次生灾害。4、复杂的建设条件⑴项目地处藏羌集聚地,且为汶川“5.12”大地震灾后恢复重建区,地方协调难度大。3⑵项目地处区目前主要运输干道为高速公路与G213线有20多次交叉,大多数隧道洞口紧邻高速公路,地