NBICS27.120F48备案号:41491-2013中华人民共和国能源行业标准NB/T25013—2013核电厂发电机组首次并网试验要求Testrequirementsforgeneratorunitfirstsynchronizationofnuclearpowerplant2013-06-08发布2013-10-01实施国家能源局发布NB/T25013—2013I目次前言··········································Ⅱ1范围·········································12总则·········································12.1试验组织······································12.2人员要求······································12.3仪器仪表······································12.4试验文件······································13设备和系统检查····································13.1发电机检查·····································13.2励磁机检查·····································13.3励磁系统检查····································23.4发电机氢、油、水系统检查·······························23.5发电机同期装置检查··································23.6电气一次设备检查··································23.7发电机—变压器组二次回路检查·····························24现场条件检查·····································35发电机并网前的试验··································35.1发电机短路试验···································35.2发电机空载试验···································45.3励磁调节器试验···································56发电机并网试验····································56.1发电机假同期试验··································56.2发电机同期并网试验··································57文件记录及归档····································6参考文献········································7NB/T25013—2013II前言本标准按照GB/T1.1—2009《标准化工作导则第1部分:标准的结构和编制》给出的规则起草。本标准由中国电力企业联合会提出并归口。本标准起草单位:中广核工程有限公司、深圳中广核工程设计有限公司、苏州热工研究院有限公司。本标准主要起草人:沈锦峄、陈晓义、杨建荣、王亚飞、刘国强、赵岩、孙泉荣。本标准为首次发布。本标准在执行过程中的意见或建议反馈至中国电力企业联合会标准化管理中心(北京市白广路二条一号,100761)。NB/T25013—20131核电厂发电机组首次并网试验要求1范围本标准规定了新(扩)建压水堆核电厂从发电机启动前检查到发电机同期并网完成期间的主要试验项目和试验要求。本标准适用于压水堆核电厂发电机组首次并网试验。2总则2.1试验组织2.1.1根据需要成立首次并网专项组织,在机组启动委员会的领导下,负责发电机组首次并网各项试验的准备和实施等具体工作,保证试验有序进行。2.1.2首次并网专项组织应由设计、制造、施工、生产等单位的工程技术人员组成。2.2人员要求2.2.1调试人员应通过必要的调试技能培训并取得相应的授权。2.2.2调试人员应具备指导、监督、示范操作、分析问题、解决问题、编制措施和总结的能力。2.2.3电厂运行操作人员应取得在试验阶段执行操作的相应授权。2.3仪器仪表2.3.1调试中使用的仪器、仪表应根据相应规定进行管理。2.3.2仪器、仪表应经有资质的计量单位校验合格,在有效期内使用。2.4试验文件2.4.1调试使用的相关文件应为经批准生效的最新版本文件。2.4.2调试工作应获得相应工作许可文件。3设备和系统检查3.1发电机检查发电机检查应包括以下内容:a)发电机整体已安装完工,交接试验已完成,检验记录完整、结果合格;b)发电机转子集电环、碳刷、碳刷架已检验,碳刷与集电环接触良好并调试合格;c)发电机大轴一点接地,接触良好;d)监测发电机工作状态的各种仪器仪表已经检定合格;e)发电机测温元件已经校验合格;f)发电机中性点接地装置已安装完工、试验合格;g)测量发电机轴承座绝缘电阻,试验结果应合格;h)测量发电机定子及转子绕组的绝缘电阻,试验结果应合格;i)在汽轮机升速过程中,测量不同转速下的转子交流阻抗和功率损耗,试验结果应合格;j)在汽轮机升速过程中,测量不同转速下副励磁机输出电压和相序,试验结果应合格。注:如采用无刷励磁方式,b)、i)、j)列项可取消。3.2励磁机检查励磁机检查应包括以下内容:NB/T25013—20132a)励磁机整体已安装完工,交接试验已完成,检验记录完整、结果合格;b)测量主励磁机、副励磁机磁极和电枢绕组的绝缘电阻,试验结果应合格;c)励磁机空冷系统已检查、试验合格。3.3励磁系统检查励磁系统检查应包括以下内容:a)发电机转子监测装置静态功能试验合格;b)励磁系统盘柜已安装完工检查合格,主回路连接可靠,绝缘合格;c)励磁调节器电源回路检查合格;d)励磁开关主触头接触良好,开距符合要求,动作灵活可靠;e)励磁调节器静态功能试验合格,开环特性符合设计要求;f)励磁系统控制、保护及信号回路接线正确、动作可靠,仪器仪表校验合格。3.4发电机氢、油、水系统检查发电机氢、油、水系统检查应包括以下内容:a)发电机的氢压、氢温、氢气纯度及湿度符合设计要求;b)发电机密封油系统已投运,运行正常;c)发电机定子冷却水系统已投运,运行正常。3.5发电机同期装置检查发电机同期装置检查应包括以下内容:a)同期装置电源回路检查合格;b)同期回路电压互感器核相正确;c)同期装置静态试验合格;d)同期装置二次电缆接线工作已全部结束,符合设计要求;e)同期装置传动汽轮机调速、发电机调压回路试验完成;f)同期装置传动合闸断路器试验完成。3.6电气一次设备检查电气一次设备检查应包括以下内容:a)全厂接地网和设备接地连接良好,防雷保护装置调整试验均已合格;b)高压开关站内配电装置、厂用变压器及相关厂用电设备已投入运行;c)发电机出口或主变压器高压侧断路器、隔离开关已安装完成、试验合格;d)发电机出口封闭母线绝缘合格;e)发电机出线强制风冷装置、发电机封闭母线强制风冷装置已调试完成、投入运行;f)发电机封闭母线微正压装置已调试完成、投入运行。3.7发电机—变压器组二次回路检查发电机—变压器组二次回路检查应包括以下内容:a)发电机—变压器组相关二次盘柜已安装完工,二次回路检查合格,符合设计要求;b)发电机—变压器组保护装置功能调试已完成、试验合格;c)发电机—变压器组保护传动出口断路器试验已完成,结果合格;d)发电机相序和系统相序已经验证完成;e)相关计量和测量仪表整定已完成;f)相关遥信、遥测、远动设备试验已完成,信息已正确传送电网调度;g)机组故障录波器功能调试已完成。NB/T25013—201334现场条件检查现场条件检查应包括以下内容:a)试验区域隔离控制已建立;b)试验通道与试验区域保持清洁与畅通;c)电站火警探测与消防设施可用,必要区域设置临时消防措施;d)现场与主控制室建立必要的通信;e)试验区域的空调装置、采暖及通风设施满足要求;f)试验相关厂房的照明系统满足要求;g)试验范围内的一、二次设备的调度命名及调度编号已按有关规定要求在现场准确清晰标示,并与计算机监控/主控制室的模拟图相符。5发电机并网前的试验5.1发电机短路试验5.1.1短路试验前的状态要求短路试验前的状态要求应包括以下内容:a)发电机组启动方案已获得电网批准;b)核功率满足发电机试验要求;c)汽轮机维持额定转速,各项运行参数正常;d)发电机出口或主变压器高压侧断路器、隔离开关均应断开,并锁定在断开位置;e)发电机试验短路铜排宜安装在发电机出口处,如果没有发电机出口断路器也可以安装在主变压器高压侧,短路铜排应能承受试验时的最大电流;f)在发电机—变压器组保护屏短接主变压器差动保护发电机侧的电流互感器二次回路;g)确认发电机—变压器组保护装置已按短路试验保护整定值通知单正确整定;h)确认发电机—变压器组保护已按短路试验保护压板清单正确投入;i)临时励磁电源已按试验要求连接完毕,电源容量满足发电机短路试验需求;j)断开励磁调节器起励电源,闭锁励磁调节器起励和强励功能;k)设置励磁调节器手动通道运行,闭锁通道切换功能;l)设置好录波仪并连接试验线。注:如采用他励方式,第i)项可取消。5.1.2发电机短路电流试验发电机短路电流试验应包括以下内容:a)进行励磁开关传动试验,开关合跳正常;b)合上励磁开关,缓慢增加励磁电流使发电机定子电流达到额定,中间设置多个稳定的电流平台进行发电机各项参数的检查及记录;c)进行发电机转子接地保护检查,确认功能正常后投入发电机转子接地保护;d)进行发电机短路铜排温度监测,确认短路铜排无局部过热点;e)进行励磁调节器整流桥温升检查,确认温升满足产品设计要求;f)录制发电机短路特性曲线,与出厂数据比较,误差应在允许范围以内;g)检查发电机—变压器组电流二次回路无开路现象,相关电流端子排无明显温升;h)验证发电机两侧电流互感器二次电流的极性、相位、幅值等参数正确;i)验证发电机电流量相关保护正确;j)验证发电机—变压器组保护在各个稳定电流平台下相关实时参数正确,并记录;NB/T25013—20134k)在额定电流下,进行发电机中性点接地零序电流检查,电流值不能超过制造厂规范要求;l)在额定电流下,进行端部振动检查,振动值不应超过厂家设计要求;m)在额定电流下,进行发电机温升试验,检查定子绕组、铁芯、铜屏蔽、冷/热氢、定子冷却水、励磁机冷/热风、转子、轴承等部位温升情况应满足产品设计要求。5.2发电机空载试验5.2.1空载试验前的状态要求空载试验前的状态要求应包括以下内容:a)确认发电机—变压器组保护屏已短接主变压器差动保护发电机侧的电流互感器二次回路;b)确认发电机—变压器组保护装置已按空载试验保护整定值通知单正确整定;c)确认发电机—变压器组保护已按空载试验保护压板清单正确投入;d)确认临时励磁电源已按试验要求连接完毕、电源容量满足发电机空载试验需求;e)确认已断开励磁调节器起励电源、已闭锁励磁调节器起励和强励功能;f)确认已设置励磁调节器手动通道运行、已闭锁通道切换功能;g)设置好录波仪并连接试验线。注:如采用他励方式,第d)项可取消。5.2.2发电机升压试验发电机升压试验应包括以下内容:a)确认发电机出口或主变压器高压侧断路器、隔离开关均应断开,并锁定在断开位置;b)确认发电机短路试验用的短路排已拆除,发电机与机组封闭母线软连接已安装;c)装设发电机定子接地保护试验临时接地线;d)汽轮机额定转速下,合上励磁开关,缓慢增加励磁电流,验证发电机定子接地保护正确;e)拆除发电机定子接地保护试验临时接地线;f)汽轮机额定转速下,合上励磁开关,缓慢增加励磁电流使发