目录1、编制说明及依据..........................................61.1编制说明..................................................................61.2编制依据..................................................................71.3编制原则..................................................................72、工程概况...............................62.1工程概况..................................................................72.2工程特点..................................................................3、施工总体方案及部署........................................3.1施工区段划分...............................................................3.2现场组织安排...............................................................3.3施工场地临时设施布置.....................................................123.4施工总体部署............................................................133.5施工现场临时道路...........................................................3.6借方采购及运输.............................................................4、主要工程项目的施工方案及施工方法........................144.1路基土方工程...........................................4.1.1施工测量4.1.2软基处理4.1.3准备工作4.1.4路基开挖4.1.5路堤填筑4.1.6路基整修4.1.7土方调配4.2道路底基层与基层工程....................................4.2.1原材料4.2.2混和料的拌和4.2.3压实4.3公路路面结构工程........................................4.3.1机械设备4.3.1混和料的拌和4.3.2混和料的摊铺4.3.3混和料的压实4.4涵洞、盖板涵工程........................................4.4.1组织技术措施4.4.2施工方法4.5路基防护与排水.........................................4.5.1施工顺序4.5.2浆砌片石施工技术要点4.6桥梁工程施工方法......................................144.6.1桩基施工144.6.2桥墩施工184.6.3桥台施工194.6.4帽梁施工4.6.5先张预应力空心板预制施工4.6.5.1预制场地的选择与布置...............................................4.6.5.2空心板预制.........................................................4.6.5.3预应力空心板梁的运输与安装.........................................4.6.6桥面系施工214.6.7锥坡砌筑225、施工进度总计划说明........................................5.1工程形象进度计划说明.......................................................5.2资源供应计划说明...........................................................5.3资金供应计划说明...........................................................6、设备人员动员周期进场计划..................................6.1设备人员动员周期...........................................................6.2设备、人员、材料运到施工现场的方法.........................................7、确保工程质量、安全和工期的措施..........................227.1工程质量保证措施.........................................................227.1.1工程质量目标227.1.2工程质量保证措施227.2施工安全保证措施.........................................................247.2.1施工安全目标247.2.2施工安全保证措施247.3工期保证措施............................................................258、冬雨季施工的工作安排....................................268.1雨季施工安排.............................................................268.1.1抓好防洪抗汛的准备工作278.1.2统筹好各单项工程的施工计划278.1.3雨季施工中的技术措施278.2农忙季节工作布署...........................................................8.3冬季施工措施...............................................................8.3.1路基冬季施工8.3.2混凝土冬季施工8.3.3砌体冬季施工9、环境保护及文明施工措施..................................299.1.环境保护措施............................................................299.2文明施工措施.............................................................309.2.1施工区域文明施工措施309.2.2生活区域文明管理3110.主要分项工程施工工艺流程图.............................3210.1路基施工工艺框图.......................................................3210.2箱涵(箱形通道)施工工艺流程图..............................................10.3盖板涵(盖板通道)施工工艺流程图............................................10.4钻孔灌注桩施工工艺流程图................................................3610.5桥梁墩(台)施工工艺流程图..............................................3710.6预制空心板梁施工工艺流程图..............................................381、编制说明及依据1.1编制说明对新疆和布克赛尔县和什托洛盖镇人民政府《东桥改建工程》招标文件中合同条件、技术规范、投标书格式、工程量清单及图纸的认真编制。1.2编制依据1、新疆和布克赛尔县和什托洛盖镇人民政府提供的《东桥改建工程》》施工招标文件。2、国家有关公路、桥梁工程施工规范。3、国家、新疆维吾尔自治区有关安全、环境保护规程及相关规章、文件。2、工程概况2.1施工范围及内容和什托洛盖镇东桥改建工程起点k0+115.97,终点k0+146.55,全长:30.58米。.2.2地理位置和地形、地貌和什托洛盖镇位于哈尔赛尔克山南约10km,和布克赛尔蒙古自治县城东南36km,东与查干库勒乡相邻,西与那仁和布克牧场相隔,北与莫特格乡接壤。该镇地处交通要道,217国道阿(阿勒泰)—乌(乌鲁木齐)公路穿越全境,有通往县城的42km长的沥青路,和通往气泉的专线公路。地理坐标东经86度20'12",北纬40度30'58"。地表植被稀少,多为梭梭柴。本工程位于气泉公路上1+650(桥)和2+100(涵)处。2.3气象水文该区域属寒温带大陆性干旱气候,其特点冬寒漫长,夏凉短促,无霜期短,降水较少,蒸发量大,空气干燥,日照时间足,年平均气温5.8c,极端最高温度(七月)34.6c,最低温度(一月)—3300c,最大风速24m/s,风力12级,年平均降水量342.1mm,年蒸发量平均1750.9mm,全年无霜期141天,冬季积雪最大厚度1.0m,标准冻土深度1.40m。和布克赛尔县气候干燥,降水少,水资源缺乏,缺水干旱面积较大。全县2条河、和布克河年径流量0.33664×108m3,白杨河年径流量1.224×108m3,,28条沟,地表水年径流量2.02166×108m3。2.4区域地质概况和布克赛尔县地质构造属准噶尔凹陷—北天山褶皱系的一部分,萨吾尔山南侧是和布克新生代山间凹陷。谢米斯台复背斜(山)东侧是和什托洛盖中新生代山间凹陷,凹陷东段有大面积的侏罗纪含煤地层沉积。地层走向和古深段断裂走向均以NEE—SWW西向为主。古生代中早期以海洋环境为主,沉积物多为海底喷发为多,古生代中后期谢米斯台山和萨吾尔山相继隆起为陆地并褶皱成山,山间为中、新生代沉积谷盆地。至此形成了和布克赛尔县现代构造的基本格架。中生代末,山区继续缓慢上升,谷地相对下沉,成为陆源物质堆积区,地壳运动趋于平稳,新构造运行不发育。区域构造末见有强烈活动的深大断裂。本工程位于和什镇东侧,长约4km,地势较开阔,略有起伏,第四系厚度较小。属山铅准平原地貌,基岩裸露,表层覆盖有薄层第四系。基底为中生代侏罗纪含煤地层。受中生代晚期,南北向压应力作用,形成了轴部近东西向的复式褶皱。公路桥(涵)位于一单斜构造上,岩层走向NEE—SWW。倾角12度—15度。根据地震动参数区划图,和什托洛盖镇动峰值加速度0.05g,动反应谱特征周期值0.45s,相应地震基本烈度VI。2.5技术标准公路等级:二级,设计行车速度60千米/小时;荷载等级:公路—II级;桥面宽度:净9+2×0.5米安全带;设计洪水频率:1/50;2.6主要建筑材料本项目沿线无合格材料,所有筑路材料需远运。1、砂石料场料场在和什镇振兴砂石料场购买,岩性为石灰岩类,含泥量少,储量丰富;各种规格的砂岩石、砾石、以满足路面基层、底基层及其他构造物的使用,上路运输方便,运距10公里。2、砂砾土料场位于和什镇戈壁滩,无覆盖,开采面积大。土粒占30%—50%,可以满足路基填料需要运输方便,远距3公里。3、水用于各项工程,可以从和什镇抽取运输,平均运距5公里。